[en] OPTIMAL CONTRACTING OF TRANSMISSION SYSTEM USAGE AMOUNTS VIA FLEXIBLE STATIC EQUIVALENTS AND PROBABILISTIC LOAD FLOW. / [pt] CONTRATAÇÃO ÓTIMA DOS MONTANTES DE USO DO SISTEMA DE TRANSMISSÃO VIA EQUIVALENTES ESTÁTICOS FLEXÍVEIS E FLUXO DE POTÊNCIA PROBABILÍSTICO

NATASHA SOARES MONTEIRO DA SILVA 24 January 2019 (has links)
[pt] Na década de noventa, no Brasil, havia uma predominância de empresas verticalizadas no setor elétrico, pertencentes aos governos estaduais e federais, que no decorrer do processo de reestruturação e privatização sofreram uma desverticalização das suas atividades, em geração, transmissão, distribuição e comercialização. Após iniciada a privatização das companhias foi criada a Agência Nacional de Energia Elétrica (ANEEL),responsável por regular as atividades do setor elétrico brasileiro. Estas mudanças acarretaram em diferentes modelos de mercado caracterizados pelo acentuado uso dos sistemas de transmissão. Neste cenário, foi definido pela ANEEL que as concessionárias de distribuição devem pagar às transmissoras pela utilização de suas instalações o Encargo de Uso do Sistema de Transmissão (EUST). Para isso, é necessário informar o Montante de Uso do Sistema de Transmissão (MUST) para cada ponto de conexão e período tarifário por meio do Contrato de Uso do Sistema de Transmissão (CUST). Em caso de ultrapassagem dos valores firmados neste contrato acima de um percentual estipulado, a contratante terá que pagar uma penalidade. Esta dissertação tem por finalidade apresentar uma nova metodologia na determinação do valor ótimo do MUST, baseado em equivalentes estáticos flexíveis, fluxo de potência probabilístico e técnicas de otimização estocástica de modo a equilibrar o custo do transporte de energia e o custo da penalidade. Primeiro, utiliza-se uma técnica de redução de rede, flexível e precisa. Segundo, as incertezas provenientes das cargas, geração e topologia da rede são mapeadas nos pontos de conexão em análise. Terceiro, utiliza-se uma técnica simples de otimização estocástica para obter o MUST a ser contratado, pela distribuidora de energia elétrica, em cada barra de fronteira. Por último, a metodologia proposta é empregada no sistema acadêmico IEEE RTS com o objetivo de demonstrar a sua eficiência sendo os resultados obtidos amplamente discutidos. / [en] In Brazil, during the 1990s, there was a predominance of vertical companies in the electricity sector, belonging to the state and federal governments, which in the course of the restructuring and privatization process suffered a deverticalization of their activities into generation, transmission, distribution, and commercialization. After the beginning of this privatization process, the National Electric Energy Agency (ANEEL) was created, which is responsible for regulating the activities of the Brazilian electricity sector. These changes have led to different market models characterized by the strong use of the transmission systems. In this scenario, it was defined by ANEEL that the distribution concessionaires must pay the transmission companies for the use of their equipment. Thus, it is necessary to inform the Transmission System Usage Amount (MUST) for each connection point and tariff period by means of the Transmission System Use Agreement (CUST). In case of exceeding a specified percentage of the contracted amounts, the contractor will have to pay penalties. This dissertation aims to present a new methodology to determine the optimal value of MUST, based on flexible static equivalents, probabilistic power flow, and stochastic optimization techniques, in order to balance the energy transport and penalty costs. First, a flexible and accurate network reduction technique is used. Second, the uncertainties arising from the load, generation, and topology of the network are mapped at the connection points under analysis. Third, a simple stochastic optimization technique is used to obtain the MUST to be contracted by the electric power distributor at each border bus. Finally, the proposed methodology is used in the IEEE RTS academic system in order to demonstrate its efficiency, and the obtained results are widely discussed.