• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 1
  • 1
  • Tagged with
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

IC基板製程時間之特徵選擇研究-以鑽孔作業為例 / A Study of Features Selection to Process Time of IC Substrate - For Example of Drilling Operation

宋伯謙, Elias Soong Unknown Date (has links)
在數據分析的領域中,尤其在大數據的領域之中,因常含有相當高維度的預測變數,故特徵選擇是一個很重要的主題。這個主題在半導體的應用上,已經獲得相當豐碩的成果,但在IC基板的應用上,成果就相對顯得貧乏。所以,此次的研究(以IC基板中鑽孔製程為例)將透過以下的試驗方法(含:GR-SNBC (Gain Ratio with Naive Bayes Classifier)、SU-SNBC (Symmetrical Uncer-tainty with Naive Bayes Classifier)與SU-CART (Symmetrical Uncer-tainty with Classification and Regression Tree Classifier)),來建立可應用於IC基板製程時間預測上的一組屬性。最後,此一研究的成果不僅在於,使用資料挖礦的方法,來找出一組具有顯著性,而且可以用來預測的IC基板製程時間的產品特徵屬性;而且,發現若為了縮短製程時間,來自產品結構本身的因子,會比來自產品在生產管理上的因子更具顯著的效果。 / Feature selection is significate subject in domain of data analysis, especially in big-data with a lot of high dimension predictive variables. In semi-conductor field, this subject has already gotten a plenty of achievement, but not in IC-substrate; so in this research for example of drilling operation, through experiments, it builds a group of se-lective features for this field to predict process time, and the methods used are GR-SNBC (Gain Ratio with Naive Bayes Classifier), SU-SNBC (Symmetrical Uncertainty with Naive Bayes Classifier) and SU-CART (Symmetrical Uncertainty with Classification and Regression Tree Classifier). The contributions of this research are not only a selective product characteristics subset suggested to predict process-time in IC-substrate fab via the data-mining methods here, but also an observation that in order to shorten the process time, the factors of product construction weighs more than production management.

Page generated in 0.0165 seconds