• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 87
  • 38
  • 22
  • 22
  • 20
  • 8
  • 6
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • Tagged with
  • 251
  • 52
  • 34
  • 30
  • 27
  • 26
  • 26
  • 21
  • 20
  • 19
  • 19
  • 17
  • 16
  • 16
  • 16
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
241

Městská sportovní hala v Kuřimi - stavebně technologický projekt / Municipal Sports Hall in Kuřim - construction technology project

Vlasák, Jakub January 2018 (has links)
The aim of this diploma´s thesis is the construction and technological salutions to rough construction building municipal sports hall in Kuřim. The content of this work is technological execution, solution to site equipment, design of machanical assemblies sonnected with transport links, checking and test plans, line budget, schedule, calculation of construction, building timetable, safety and protection of enviroment.
242

Design centrum HANÁK NÁBYTEK a.s., Popůvky u Kojetína - příprava a organizace výstavby objektu / Design center HANÁK NÁBYTEK a.s., Popůvky u Kojetína - project planning and management of construction

Izsová, Radka January 2014 (has links)
This thesis addresses the Design centrum HANÁK NÁBYTEK a.s., Popůvky u Kojetína - This is a new object had the basement and a second floor. The thesis includes - Technical report on the construction technology of the project , which are described in each chapter building equipment, coordination of building relationships with the wider transport routes , the study of the main technological stages, the design of the main building machines and mechanisms. There is a solution on time and financial plan object , the schedule object SO03 - Rapid technological and construction timetable and plan for securing material resources SO03 object . This thesis addresses the technological specification for excavation work with the control and test plan then is solved problems of chemical anchoring pillars object SO203 , which are included tensile tests on chemical anchors.
243

Mechanické vlastnosti mořských sedimentů v okolí přístavu Koper a numerické modelování hluboké základové jámy / Mechanical properties of marine sediment near Koper and numerical modelling of a deep excavation

Tůma, Pavel January 2010 (has links)
Mechanical properties of marine sediment near Koper and numerical modelling of a deep excavation Engineering geological conditions near the port Koper in southwestern Slovenia forces geotechnical experts and civil engineers to solve problems in foundation various types of objects and purpose of the practice since the fifties of last century, when it began an intensive development of infrastructure of the port. The results of series of geological and geotechnical surveys, monitoring, and long experience with foundation in the local geology shows that it is almost always the 3rd geotechnical category, or foundation of complex structures in difficult geological conditions below the water table. The entire area belongs to Alpine-Dinaric tectonic area. The rock foundation is composed of complexes of flysch sediments Eocene age at which mounted files of recent marine sediments in the area widely submerged river valley fluvial sands and gravels. From the geotechnical point of view it is interesting site, where most buildings were based on a layer of soft marine sediments, where it is through the creation of special methods implemented in the establishment of deep-level endurable layers of gravel and sand of the river Rižana or at the level footingwall flysch. Set of marine sediments near the port Koper,...
244

Príprava realizácie polyfunkčných domov v Bratislave / Preparation for the implementation of the multifunctional buildings in Bratislava

Janíček, Peter January 2022 (has links)
This diploma thesis deals with the preparation of the implementation of multifunctional buildings in Bratislava. These are three detached multi-storey apartment buildings connected by a joint basement. The diploma thesis includes a technical report to the construction technological project, a study of the implementation of main technological phases, solving of broader relations of transport routes with the design of supply routes, a time schedule and a financial plan of the object, a detailed time plan for the rough substructure and rough superstructure, a building site equipment project, a machine assembly design and its assessment, a technological regulation for monolithic structures, a control plan and test plan for monolithic structures, a specification of the time period of the removal of the formwork of monolithic structures, an occupational safety and health plan and selected points of the LEED certification. The thesis also includes a plan for securing resources for the rough structure with added schedules of workers, machines and building materials, a cost estimation budget of selected technological processes, a noise study, and a financial analysis of the expected investment profit.
245

Tunel Blanka: Inženýrskogeologické problémy a rizika ražby / The Blanka tunnel, geological hazadrs and problems during boring

Sedláček, Václav January 2016 (has links)
The Blanka tunnel has two boring sections: Brusnice tunnel and Královská obora tunnel. Both tunnels were boring in difficult geologycal conditions, but the geology conditions of these tunnels are not same. Also they had not the same hazards during boring. There was used a spectrum of different technical works with hazard reduction purpose and safety process of boring. There were three serious accidents, wnich everyone made a creater on the surface, but they have not the same causes. This text has a task to describe a geological survey before and during the boring of both tunnels. How other reasons affected the process of boring? How the tunnels were bored? What events preceded the everyone of three major failure? This text does not deal with economical things of boring and effects of specific personal influence on the process of boring. Key words Tunnel, excavation, Blanka, Brusnice, Letná, Stromovka park, Vltava river, underground water, geology, ordovik, New Austrian Tunnelling method, pilot tunnel, calotte, bench, bottom, arche, bolt, lining, grouting, collapse of ceiling, failure, tube, shale, quarzite, soil, loess, ballast, clay
246

Penzion / Apartment hotel

Prívara, Marek January 2013 (has links)
The subject of this thesis was to develop project documentation for building construction. It is a new four-storey house with restaurant, situated on the outskirts of the village Bridges at Jablunkova. The building is brick, has a two-level gable and shed roof, consisting of wood roof system. Slope of the parcel on which the house is located, allows the building of the plant into the ground. Because of this it is possible to enter it, either the main entrance to the first floor or building around and over the summer terrace come directly to the restaurant on the second floor. Above it are two more floors for hotel guests only, a total of 10 accommodation units with its own bathroom.
247

Městský okruh Blanka, tunel Královská obora - ražená část, stavebně technologická příprava stavby / City circle road Blanka, tunnel Královská obora - mined section, preparation and building construction technology

Kobielusz, Petr January 2013 (has links)
My thesis is focused on process preparation and building construction technology of primary lining road tunnel, implemented in city part of Troja in the capital city Prague. Specifically it is a part of tunnel complex Blanka. The name of this part is Kralovská obora. If the all tunnel parts are built this tunnel complex Blanka can be complemented to already opened tunnels Zlíchovský, Mrázovka and Strahovský which are the part of city traffic circle. This technology preparation includes schedules and financial plans of the building, technological prescription for the primary tunnel lining, safety plan, control and trial/test plans, environmental plan, project of construction site, design of the main working machines, items budget of the north tunnel tube, coordination situation plan with wider relationships transport routes and technical report of building technological project.
248

Bytový dům / Residential Building

Uhlíř, Karel January 2013 (has links)
Diploma thesis develops comprehensive documentation of the new building construction of residential house on the level of the implementation of the project construction. Proposal emphasizes layout of linked to ensure the technical design, structural, fire safety, protection against noise, energy saving, safety in use. Work is performed in an electronic format using AutoCAD and Microsoft Word (PDF Creator).
249

Rekonstrukce a přístavba Městského muzea Česká Třebová - příprava realizace a řízení stavby / Reconstruction and exctension of the City Museum Česká Třebová

Strnadová, Lenka January 2014 (has links)
Master thesis solves construction and technological project which deals with data processing, documentation and technological processes of building reconstruction and extension realization in Muzeum of Česká Třebová. The work contains technological building study, assessment of relationships to the wider transportation routes, time and financial plan, building-site organization project, design of the main building machines and mechanisms, technological prescriptions for excavation work and micropile injection, occupational safety and health protection management, project calculation budget.
250

Stavebně technologický projekt výstavby sportovní haly / Construction technological project of sports hall construction

Tkáč, Jiří January 2022 (has links)
The thesis deals with Komenského Street sports hall construction in Lysá nad Labem. Although partially dealing with construction of all parts, in detail it studies gym construction, focusing on time management, technology and resources of implementation. The thesis is divided into the drawing and text parts. The former includes site facilities design and building situation. The latter consists of the main part construction project implementation study, itemized budget, time schedule, technological regulations, inspection and testing plan for the implementation of the main construction part 1st floor reinforced concrete columns and walls, construction machines and mechanisms design as well as time and financial schedule.

Page generated in 0.0741 seconds