1 |
Modern building services for listed historic buildings : problems & riskHillier, Justine Fern January 2004 (has links)
The English Heritage Press Office has estimated that listed buildings represent a finite cultural resource of approximately 6% of England's building stock. Many of these listed buildings are historic. It is often necessary to find an appropriate use for them, in order to preserve them for future generations. Many, not threatened by obsolescence, require upgrading to comply with statutory regulations. Others are improved to provide the occupants with twenty-first century standards of environmental comfort, lighting and power, sanitation, security and communications systems. The revitalisation or upgrading of property is commonly accepted as refurbishment. The study initially focused on the refurbishment of listed historic buildings - the enquiry was then narrowed to investigate the integration of modern building services into listed historic buildings. This element of the refurbishment process was identified as an area that frequently constitutes a considerable proportion of the contract sum. A naturalistic form of enquiry was used to elicit information that would contribute to the body of knowledge on this area of building conservation work. Refurbishment characteristics pertaining to the process of integrating modern building services into listed historic buildings were identified and rated for frequency of occurrence and degree of difficulty. An evaluation of perceptions and attitudes to adverse events, that posed risk in the process, was also undertaken. Practitioners from the Construction Industry then described both success and problem factors encountered in this element of building conservation. Having built up a picture of the process, based on the experiences of the constituent members of the project team, three individual projects were studied to gain further insight into the project and what might be considered as 'repetitive essentials'. To facilitate analysis the elicited data was assigned to the most appropriate choice from eight different project categories. These categories were employed as a way of recording the data throughout all stages in the research enquiry. The study concludes by outlining a model, based on these project categories, which could be developed to provide a common project framework. A key function of such a project framework would be to promote understanding through improved communication and integrated teamwork. The study concludes by recommending areas worthy of further research relating to the project framework, the project team and risk in listed historic buildings.
|
2 |
An evaluation of the risks in estimating and tendering for refurbishment workQuah, Lee Kiang January 1988 (has links)
This study has been motivated by the lack of research in the substantial and grow1ng refurbishment sector of the United Kingdom construction industry. The reasons for inexplicably higher variability in tender bids for refurbishment work when compared to new work was investigated. This phenomenon had led to a claim by a large body of contractors that they were exposed to higher risks in such projects. The research involved the joint support of a confederation of contractors and a large number of individual contractors. The methodology adopted consisted of structured interviews with individual contractors as a means of obtaining basic information on the refurbishment industry and the particular problems that contractors have in tendering for such work. This qualitative information was augmented by quantitative information derived from measuring the bidding performance of contractors utilising two unique interactive data bases created from primary data obtained from both sets of collaborators. The first data base consisting of tender bids for a very large sample of refurbishment projects, providing global variability measures which served as indicators of the risk and uncertainty in the pr1ce prediction process. The second data base consisted of detailed tender build-ups of competing contractors for a smaller sample of refurbishment projects drawn from the maln sample; variability measures in this case isolated the main components of risk in the tender bids. The most variable main cost component in the tender was the Priceable Building Work, followed by Preliminaries, Mark-up, Dayworks and Fixed Price Allowances. The variability in Priceable Building Work and Preliminaries is founded ln poor and unsuitable tender documentation and the high reliance upon domestic sub-contractors quotations included in the tender. Variability ln mark-up has its origins ln the different perceptions of risk and in the competitive mix in tendering, in terms of specialism and size of competitors. The investigation into the confidential cost and price information within this study has also provided insights into comparative pricing methods and bidding strategies which have never previously been obtainable. It has at the same time, provided answers to many of the unresolved questions overhanging past research studies in estimating and tendering. The study concludes with a proposal for an optimal method of allocating or sharing the risk associated with the uncertain nature and unpredictable costs of refurbishment work. It also draws attention to the fact that objective statistical measurements of variability for the purposes of determining risk and uncertainty can only provide part of the information. There is a need to conduct behavioural studies on the perceptions and evaluation of the risks in estimating and tendering for construction work.
|
3 |
Use of BIM for the optimal management of existing buildings / Utilisation du BIM pour une gestion optimale des bâtiments existantsAlileche, Lyes 13 November 2018 (has links)
Ce travail de thèse porte sur l'utilisation de la maquette numérique du bâtiment (BIM) pour l'optimisation de la gestion des bâtiments existants, en particulier le logement social. Ces bâtiments sont caractérisés par le vieillissement, les faibles performances énergétiques et le faible revenu des locataires dans le cas des logements sociaux. Les gestionnaires de ces bâtiments souffrent d’un manque de données concernant le patrimoine, ce qui peut entraîner des décisions inefficaces.La thèse présente d’abord les défis de la gestion technique de patrimoine, puis elle explique comment le BIM pourrait aider à relever ces défis en créant une plate-forme comprenant les informations sur le bâtiment et ses équipements ainsi que l'historique et la maintenance. Les avantages du modèle BIM sont illustrés à travers deux cas études : une résidence de logement social comprenant 50 appartements et un bâtiment de recherche sur le campus scientifique de l'Université de Lille.Le rapport de thèse est organisé en quatre parties.La première partie comprend l’état de l’art concernant les méthodes actuelles de gestion technique de patrimoine et l’apport du BIM à cette gestion.La deuxième partie décrit les étapes réalisées pour construire le modèle BIM d’une résidence de logement social. La troisième partie décrit l'implémentation du BIM pour optimiser la gestion des installations et la maintenance des bâtiments.La dernière partie décrit le développement d'un modèle BIM dynamique par la combinaison du model BIM et les données de confort et de consommations collectées avec des capteurs. Ce modèle sert à informer en temps réel les usagers et les gestionnaires. / This research concerns the use of the Building Information Modeling (BIM) for the optimal management of existing buildings, in particular social housing buildings. These buildings are characterized by aging, poor energy performances and tenant’s low-income. The building managers suffer from lack of data concerning the buildings asset which could lead to poor operating decisions.The thesis discusses how the BIM could help to meet existing buildings challenges by the creation of a friendly comprehensive system including information about the building and equipment as well as the maintenance. The benefits of the BIM model are illustrated through two case studies, which concern a social housing residence and a research building respectively.This thesis is composed of four parts. The first part includes a literature review concerning the current methods of facility management, and the role of BIM in improving this management.The second part describes steps carried out to realize the BIM model of an existing social housing residence which includes 50 dwells.The third part describes the use of BIM to optimize facilities management and building maintenance. The last part describes the development of a dynamic BIM model using the as built BIM and real time data collected with sensors to inform users and managers about energy consumption and abnormal events.
|
4 |
Υπέρυθρη θερμογραφία ως εργαλείο μη καταστροφικού ελέγχου σε θέματα ενδιαφέροντος πολιτικού μηχανικούΔερμιτζάκης, Νικόλαος 28 August 2007 (has links)
Είναι γενικώς αποδεκτό ότι η φροντίδα και η υποστήριξη των παλαιών κατασκευών σκυροδέματος ή λιθοσωμάτων είναι το θέμα-κλειδί του τρέχοντα αιώνα. Οι παλαιές αυτές κατασκευές είτε είναι απαρχαιωμένες είτε είναι λειτουργικά ανεπαρκείς, ενώ σε κάποιες άλλες περιπτώσεις έχουν υποστεί βλάβες, οπότε υπάρχει ανάγκη αντικατάστασης ή αποκατάστασης τους.
Καθώς η αντικατάσταση, όμως, είναι πρακτικά αδύνατη, τίθεται θέμα αποκατάστασης της ήδη υπάρχουσας κατασκευής και σε πολλές περιπτώσεις και ενίσχυσης της. Εκτός των συμβατικών μεθόδων αποκατάστασης και ενίσχυσης, τα τελευταία χρονιά έχουν αναπτυχθεί νέες μέθοδοι ενίσχυσης, μια εκ των οποίων είναι αυτή που κάνει χρήση σύνθετων ίνο-οπλισμένων πολυμερών (FRP-Fiber Reinforced Plastics). Τα σύνθετα FRP πλεονεκτούν σε σχέση με τα συμβατικά υλικά σε αρκετά σημεία, όπως η μικρότερη διάβρωση από τις περιβαλλοντικές συνθήκες, πράγμα που αυξάνει το χρόνο ζωής τους και μειώνει την ανάγκη για τη συντήρηση τους. Ο κυριότερος, όμως, λόγος μελέτης τους αλλά και η ανάγκη για την εξέλιξη τους είναι η υψηλή αντοχή τους σε σχέση με το βάρος τους, γεγονός που τα κάνει πολύ πιο εύχρηστα.
Ο πιο πρόσφορος τρόπος ελέγχου και αποτίμησης σε περιπτώσεις ενίσχυσης με σύνθετα FRP είναι με μη καταστροφικές μεθόδους αποτίμησης. Σε αυτή την περίπτωση τα σύνθετα FRP επιθεωρούνται τόσο κατά την εφαρμογή τους όσο και κατά τη διάρκεια ζωής τους για τυχόν ατέλειες στην επικόλληση αλλά και για βλάβες που μπορεί να επέλθουν, ώστε να αναγνωριστούν και να γίνουν οι κατάλληλες διορθωτικές ενέργειες ή να αντικατασταθεί η υπάρχουσα ενίσχυση.
Σκοπός της εργασίας αυτής είναι η ανάδειξη των μη καταστροφικών μεθόδων αποτίμησης ως ένα πολύ χρήσιμο και αποδοτικό εργαλείο στα χεριά του πολιτικού μηχανικού. Προς αυτή την κατεύθυνση ακολουθούν τα εξής: Στο 1ο Κεφάλαιο αναφέρονται οι βασικές μη καταστρεπτικές μέθοδοι ελέγχου, οι βασικές αρχές λειτουργίας και ο αντίστοιχος εξοπλισμός τους. Έπειτα, στο 2ο και στο 3ο Κεφάλαιο δίνεται αναλυτικά η θεωρία της υπέρυθρης θερμογραφίας, ο αντίστοιχος εξοπλισμός και κάποιες πειραματικές δοκιμές εργαστηρίου. Στο 4ο κεφάλαιο περιέχονται εφαρμογές υπέρυθρης θερμογραφίας (IR-infrared thermography) πεδίου σε έργα πολιτικού μηχανικού και εφαρμογές σε θέματα θερμομόνωσης. Τέλος, στο 5ο και τελευταίο Κεφάλαιο της εργασίας αυτής αναφέρονται τα συμπεράσματα που εξάγονται. / -
|
5 |
Stadt als Schule: Nachbarschaftszentrum & Gemeinschaftsschule an der alten Feuerwache in Anger-Crottendorf, LeipzigBrecht, Norma 14 April 2020 (has links)
In der alten, leer gewordenen Feuerwache im Leipziger Osten soll ein Nachbarschaftszentrum entstehen. Gleichzeitig plant die Stadt auf dem frei gewordenen Grundstück eine Schule. Das vorliegende Werk stellt einen Lösungsansatz für diesen Nutzungskonflikt vor, in dem architektonisch, städtebaulich und pädagogisch Synergien geschaffen werden sollen. Nach dem Vorbild der Freinet-Pädagogik wurde eine Gemeinschaftsschule am Standort der alten Feuerwache in einem Neubau geplant, während das Nachbarschaftszentrum im Bestandsgebäude der alten Feuerwehr Platz findet. Durch einen gemeinsamen Hof, zusammen genutzte Werk- und Sportstätten sowie einen gemeinsamen Mittagstisch wird die Schule zur Stadt geöffnet und die Nachbarschaft zur Schule. So wird Stadt zur Schule.:1 AUFGABE ... 5
Zur Lösung eines Nutzungskonflikts
2 DER ORT ... 11
Anger-Crottendorf'sches Allerlei - das Stadtbild und seine Bewohner_innen
3 RAUMPROGRAMM ... 19
Drei Akteure formulieren das Raumprogramm
4 BESTAND ... 25
Die alte Feuerwache und deren Nebengebäude
5 ENTWURF ... 31
Die Stadt als Schule
5.1 KONZEPT. Die Stadt als Schule
5.2 STÄDTEBAU. Zur Stadt öffnen, Plätze definieren
5.3 RAUMORGANISATION. Horizontal und vertikal
5.4 BAUKONSTRUKTION. Raster Tragwerk
5.5 GESTALTUNG. Fassade und Ansichten
5.6 MODELLE
6 FAZIT ... 63
Wenn drei sich streiten
QUELLEN ... 66
|
6 |
Contribution à l’étude du patrimoine bâti. Méthodes de diagnostic des pathologies des structures et moyens de restauration : Etude de cas. Site archéologique Volubilis au Maroc / Contribution to the study of the built heritage. methods of diagnosis of pathologies of the structures and means of restoration : Case study. The archaeological site of Volubilis in MoroccoAalil, Issam 05 December 2017 (has links)
La restauration du patrimoine bâti est une exigence pour assurer sa pérennité. Le site archéologique Volubilis au Maroc, classé patrimoine mondial de l’UNESCO depuis 1997, nécessite des travaux de restauration. L’objectif de cette thèse est de déterminer les causes de dégradation de ses pierres, et de proposer des mortiers pour la restauration de ses monuments. Dans un premier temps, une caractérisation multi-échelle a été réalisée sur les trois faciès de la calcarénite, la pierre la plus prépondérante du site. Elle a révélé que malgré la composition minéralogique similaire des trois faciès, ils présentent des propriétés hydriques, thermiques et mécaniques dissemblables et des durabilités contrastées vis-à-vis de la cristallisation de sel. Des essais non destructifs permettraient de distinguer les trois faciès en estimant leurs porosités et leurs coefficients de capillarité. Dans un second temps, une étude de diagnostic a révélé la présence l’halite et du gypse dans la majorité des pierres altérées par des détachements et des pertes de matière. Ces sels proviennent des mortiers avoisinants, utilisés pendant les interventions antérieures. De plus, l’altération des calcarénites non contaminées est vraisemblablement due à des contraintes thermiques. Dans la dernière partie, nous avons formulé des mortiers à base de chaux, du sable et de la poudre de brique à l’aide de la méthode des plans de mélanges. Cette démarche permettrait de déterminer des mortiers compatibles à la pierre calcarénite. / The restoration of the built heritage is mandatory to ensure its sustainability. The archaeological site of Volubilis in Morocco, registered on the UNESCO World Heritage list since December 1997, requires restoration works. The main objective of this thesis is to determine the causes of stones’ deterioration and to propose mortars for restoration of its monuments. Firstly, a multi-scales characterization study was carried out on the three facies of the calcarenite, the main building stone in the site. It showed that despite their similar mineralogical composition, the three facies have dissimilar hydric, thermal and mechanical properties and they are quite different in terms of durability against salt crystallization. Besides, non-destructive testing could be used to distinguish the three facies by estimating their porosities and their coefficients of capillarity. Secondly, a diagnosis study revealed the presence of halite and gypsum in most deteriorated stones affected by detachment and loss of material. These salts originated from neighboring mortars, used during the previous interventions. In addition, the deterioration of uncontaminated calcarenites is likely due to thermal stresses. In the last part, we formulated mortars using lime, sand and the brick dust using the mixtures method. This approach would determine compatible mortars to the stone calcarenite.
|
7 |
Διάγνωση και διατύπωση προτάσεων για την αποκατάσταση του ιερού ναού του Αγίου Δημητρίου στην Θωκνία ΜεγαλόποληςΠετράκος, Κωνσταντίνος 10 August 2011 (has links)
Αντικείμενο της διπλωματικής εργασίας που ακολουθεί είναι η διάγνωση των προβλημάτων και η διατύπωση προτάσεων για τη συντήρηση και αποκατάσταση του Ιερού Ναού του Αγίου Δημητρίου που βρίσκεται στο χωριό Θωκνία, του δήμου Μεγαλόπολης, του νομού Αρκαδίας με σκοπό τη συνδρομή μιας ακόμα έρευνας για την μελέτη της παραδοσιακής αρχιτεκτονικής. Για τις ανάγκες της διπλωματικής εργασίας έγινε πλήρης αποτύπωση του μνημείου και του αμέσου περιβάλλοντος χώρου του. / --
|
Page generated in 0.0358 seconds