41 |
Wellness Hotel / Wellness HotelKašpárová, Darina Unknown Date (has links)
The subject of the diploma thesis is to elaborate the project documentation of a newbuilt wellness hotel located in the village of Lipno nad Vltavou. The building is designed as a non-basement one with three floors. It is visually divided into several parts. On the first floor there are two operational parts – a wellness and a restaurant. On the second and third floor there are small apartments for temporary guests' accommodation. The building foundations are made of concrete and reinforced concrete. The load-bearing structure is made of aerated concrete blocks and sand-lime blocks. The ceiling structures are made of cast-in-place reinforced concrete. The roof of the first floor is designed as a one-layer flat extensive green roof. The roofing of a main reception is designed by a sloping roof and the third floor as three adjoining sloping roofs. These roofs are formed by a system of aerated concrete roof panels and a water-dissipating layer of folded sheet metal. The building is insulated with an external thermal insulation composite system (ETICS). The part of the facade consist of facade cladding strips and part of the render of light color.
|
42 |
Novostavba hotelu u Přehrady / Hotel "U Prehrady"Černý, Dávid January 2018 (has links)
The subject of this diploma thesis was to process the study and the design documentation for a newly built hotel in Brno, in city district “Kníničky” near the artificial dam “Přehrada” in a rest area. The hotel will serve as temporary accommodation for up to 64 hotel guests in single, double and four bed rooms. The object also contains training rooms, offices, a meeting room, a café, a small grocery store and a restaurant with kitchen. Parking is possible in one of the two mass garages and there is an outdoor parking possibility in front of the hotel too. The building has a cast-in-place concrete frame with longitudinal beams and sway bracings. The external wall consists of aerated concrete bricks with contact thermal insulation system ETICS (insulation material mineral wool), the ceilings will be cast-in-place reinforced concrete ceilings and the roof flat green roof or flat roof with gravel on it above the 5th floor. The foundation construction consists of reinforced concrete foundation strips, which expand to foundation pads under the load-bearing columns and will be supported by piled foundations under the most exposed elements. As long as the hotel is situated into a fairly steep slope, the vertical alignment of some building parts is various so part of the project is the design of landscaping works. Design documentation was processed using the program AutoCAD 2017, the study and the visualization using both SketchUp 2015, LayOut 2015 and Lumion 5.
|
43 |
Vliv provzdušnění a ošetřování na vývoj modulu pružnosti betonu / Influence of Air Entrainment and Curing on Development of Elastic Modulus of ConcreteBartulíková, Radka January 2013 (has links)
Master's thesis deals with influence of various factors on the concrete compressive strength and modulus of elasticity. This work concentrates mainly on the influence of early curing and air entrainment of concrete. One part of this work is the evaluation of laboratory measurement, which was carried out on cubes of standard and norm prisms. The development of elastic moduli was monitored in time to 730 days of age with respect to air entrainment and curing conditions. The second part of the experiment deals with a comparison of theoretical creep curves depending on the value of the modulus of elasticity based on different standards. Again, the air entrainment effect and influence of initial conditions are reflected.
|
44 |
Modernizace bytového domu Vlhká 22, Brno / Modernization of apartment house Vlhká 22, BrnoNeduchal, Zbyněk January 2020 (has links)
The diploma thesis processes project documentation in the stage of construction for modernization of an apartment house near the center on the street Vlhká 22 in Brno. The building is divided into four residential floors and nonresidential basement and attic. On the first floor there are two residential units and the other four residential units. The foundation structures are made of solid bricks. The vertical load-bearing and non-load-bearing structures are also made of solid bricks. Exceptionally drywall partitions. In the basement, the ceiling structures are made of brick barrel vaults, above the above-ground floors there are wooden beamed ceilings. The roof structure of the building is made of purlin system with standing stool and covering of ceramic roof tiles. Three additional housing units will be built in the attic. In the basement, the masonry will be undercut by a chain saw, partly by pressure grouting and partly by a new layer with a waterproofing layer. All wood-beamed ceilings will be replaced with prefabricated ceiling beams with aerated concrete inserts without overhead slab. The garden part of the building will be insulated with mineral wool. The roof structure will be constructed from the street side as a shed roof and in the garden part a flat roof with a gradient layer of expanded polystyrene thermal insulation and a waterproofing layer of thermoplastic poleolefin.
|
Page generated in 0.0314 seconds