Spelling suggestions: "subject:"army corp off engineers"" "subject:"army corp off ngineers""
1 |
Adapting Critical Chain Project Management to Army Engineer Construction ProjectsRohr, Eric E 01 April 2017 (has links)
For decades, Army Engineers have utilized the systems of the Critical Path Method (CPM) and multi-level Gantt chart planning system for its construction projects. While these methods are well accepted, they are not without their flaws. Research and literature in project management has given weight to several viable alternative options to planning projects. One such option, Critical Chain Project Management (CCPM), was developed to address the flaws of CPM by offering a holistic approach to project management based on strict resource control and the use of time buffers. This method attempts to eliminate multitasking and procrastination that can plague efficiency and offer managers more flexibly on tasks that otherwise had no leeway. CCPM may give project managers more flexibility and control while at the same time shortening the overall length of a project, saving time and money.
The purpose of this thesis was to address the time saving and resource management benefits of utilizing CCPM over CPM and analyze the viability of those benefits being applied to U.S. Army Corps of Engineers construction project planning. Through the use of surveys of Army Engineer project supervisors, several key factors that cause delays because of CPM were identified and rated. The validity of CCPM based solutions to the same issues were also assessed by Army project supervisors in the survey. Analysis of the survey results indicated that CCPM may offer solutions to major issues that Army project supervisors face.
|
Page generated in 0.0814 seconds