• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 3159
  • 2037
  • 2036
  • 957
  • 305
  • 210
  • 148
  • 83
  • 70
  • 70
  • 66
  • 53
  • 51
  • 42
  • 41
  • Tagged with
  • 10963
  • 1902
  • 1771
  • 1160
  • 1101
  • 999
  • 916
  • 850
  • 840
  • 811
  • 719
  • 700
  • 676
  • 612
  • 611
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
481

The influence of extrusion processing and formulation on form-stable phase change material

Estep, Gregory Dale. January 2010 (has links) (PDF)
Thesis (M.S. in civil engineering)--Washington State University, August 2010. / Title from PDF title page (viewed on July 28, 2010). "Department of Civil and Environmental Engineering." Includes bibliographical references (p. 24-26).
482

Tracking the location of materials on construction projects

Song, Jongchul, Haas, Carl T. January 2005 (has links) (PDF)
Thesis (Ph. D.)--University of Texas at Austin, 2005. / Supervisor: Carl T. Haas. Vita. Includes bibliographical references.
483

Der GMP-Vertrag aus bauvergaberechtlicher Sicht /

Mantler, Mathias. January 2004 (has links)
Dissertation Koln, Universität, 2003. Zugl.: Köln, Universiẗat, Diss., 2003 u. d. T.: Der GMP-Vertrag als neue Vertrags- und Wettbewerbsform aus bauvergaberechtlicher Sicht. / Includes bibliographical references (p. 187-204).
484

Aggregates in self-consolidating concrete

Koehler, Eric Patrick. January 1900 (has links)
Thesis (Ph. D.)--University of Texas at Austin, 2007. / Vita. Includes bibliographical references.
485

The transmission of pressure in the dry pressing of typical building brick and fire brick mixes as affected by the degree of pressure, physical character of mix ingredient, and the moisture content of the mix

Page, George Ava. January 1930 (has links) (PDF)
Thesis (B.S.)--University of Missouri, School of Mines and Metallurgy, 1930. / The entire thesis text is included in file. Typescript. Illustrated by author. Title from title screen of thesis/dissertation PDF file (viewed November 20, 2009)
486

Connection limit states design teaching aid /

Kerr, Robert A., January 1994 (has links)
Report (M. Engr.)--Virginia Polytechnic Institute and State University, 1994. / Vita. Abstract. Includes bibliographical references (leaves 137-138). Also available via the Internet.
487

Design of an integrated passive and active double facade system for UK offices

Kilaire, Aneel January 2012 (has links)
The Egan Report, changes to Part L Building regulations, and the importance of office workers is challenging designers to improve the construction process, reduce operational carbon emissions, and enhance occupant comfort for office buildings in the United Kingdom. This thesis proposes a double skin facade system with integrated environmental systems to overcome these challenges. The Facade deals with a number of conflicting requirements and a single-storey, naturally ventilated cavity, unitised Double Facade has been proposed to resolve them. The two key determinants for the Active Environmental System have been prefabrication and operational carbon emissions. To address these issues a decentralised system, comprising of a Reversible Air Source Heat Pump, Heat Exchanger, Active Beam and Active Trench is proposed, and integrated into the Double Facade. A key part of the design process has been working with industrial partners to develop the design and realise a full-scale prototype. This has been tested and evaluated in terms of key aspects of the comfort, weather and aesthetic performance. An appraisal of the product demonstrates that it achieves proof of concept; it is highly prefabricated and enhanced occupant comfort and carbon emissions targets can be met.
488

Golvavjämningsmassor

Persson, Sofia January 2017 (has links)
För att få plana golv att använda som golvyta eller lägga en annan golvyta på är olika avjämningsmassor en lösning. Med ett brett utbud av avjämningsmassor och svårigheter med att fördela avjämningsmassan jämt utöver en yta krävs en bred kunskap inom området. Vilka material, tillbehör och vilken typ av avjämningsmassa som används beror på vilken situation som är aktuell. Momentet för golvavjämning är ett fysiskt krävande arbete för kroppen, då det innefattar mycket tunga lyft och arbete i ställningar som inte är ergonomiska. Rekab Entreprenad AB har i skrivande stund inte all kunskap som behövs för att utföra och planera avjämningsarbete trots en bred kompetens inom företaget. Erfarenheter från tidigare utförda arbeten har inte dokumenterats och kunskapen har inte förts vidare. Att hyra in ett annat företag för att utföra momentet golvavjämning är något Rekab vill undvika eftersom det med rätt kunskap är mer ekonomiskt att utföra själv. Syftet med denna rapport är att underlätta för kommande personal på Rekab Entreprenad som skall genomföra momentet golvavjämning. Målet är att sammanställa en lättförståelig beskrivande manual om vad som är viktigt under arbetsberedning, arbetsmiljö, genomförande och erfarenhetsåterföring av momentet golvavjämning. Teorin visade att arbetsberedning, arbetsmiljö, produktion och erfarenhetsåterföring är alla fyra viktiga delar i en process. I arbetsberedningen sker all den planering som krävs inför produktion. När väl momentet kommer i produktion skall allt material, alla verktyg och personerna som behövs för att genomföra momentet finnas till hands. En väl genomförd arbetsberedning gör att produktionen får ett bra flöde och ger därför ett bättre resultat. Alla moment har arbetsmiljörisker som måste undvikas i den mån som går. Många risker går att undvika med hjälp av planering och noggrann riskundersökning där blandanat val av maskiner kan minska vibrationsrisken. Erfarenhetsåterföring sammankopplar hela projektet för att till nästa gång samma projekt eller delar i projekt skall förbättras, bli mer effektiv och därmed dra ner kostnaderna för projektet. En beskrivande manual för golvavjämning framtogs genom dialoger och diskussioner med Rekabs personal som varit involverade i arbetet. Information hur anställa tycker att dagsläget fungerar analyserades, det gav en fördjupning av vad de anställda tycker och tänker. För denna rapport ansågs det vara ett mer passande sätt att arbeta på än genom intervjuer eller enkätundersökningar då det ger snabbare svar och en mer öppen dialog kan hållas. När olika synvinklar på hur ett moment av golvavjämning genomförs sammanställdes resultatet av rapporten. I manualen presenteras alla de fyra olika delarna som beskrivits i teorin specifikt för momentet golvavjämning. Vad som är viktigt att tänka på, hur genomför man detta moment och vad som bör tas med i planerings samt erfarenhetsåterföring. Även om manualen följs noggrant och varje steg får den tid som krävs är resultatet varierande. Mycket handlar om övning och rutin av momentet. Byggtiden för ett helt projekt är lång och därför uppkommer momentet golvavjämning cirka en gång per år och svårigheter med att få övning och rutin i arbetet sker. Till skillnad från en firma som endast arbetar med golvavjämning och utför arbetet dagligen får mer övning och därför kan leverera ett bättre resultat. / To get a flat surface on the floor to either use it as the actual floor area or to put another floor finish on top of the surface, different grading masses is a solution. With a wide selection of grading masses and the difficulties to distribute the grading masses evenly across an area it demands a wide knowledge in the field. Which material, accessories and which type of grading mass which will be used depends on the current situation. The work stage for floor grading is physically demanding work for the body, because it involves heavy lifting and working in a position that is not ergonomic. Rekab Construction (Entreprenad) AB doesn’t have all the knowledge necessary to perform and plan floor grading-work even though there is a wide knowledge within the company. Experiences from previously performed work has not been documented for the knowledge to be passed on. To hire in another company to perform floor grading is something Rekab wants to avoid since it is economical to perform by yourself with the right knowledge. The purpose with this rapport is to make it easier for the future staff at Rekab Construction who will perform floor grading. The goal is to put together a comprehensible descriptive manual for a person without prior knowledge, know what is required and the important parts during job planning, work environment, execution and experience feedback for the work stage floor grading. The theory shows that the job planning, work environment, production and experience feedback are all important steps in a process. During the job planning stage, all the planning required for the production is done. When that stage comes during the production, all the material, tools and the people needed should be available. A well-made job planning creates a good flow in the production which leads to better results. Every part of the building process has safety risks which needs to be minimized. Most safety risks are avoidable with the help of planning and accurate risk study to be prepared for when they do appear. Other causes and problems such as noise, there is auxiliary tools like ear protection. Experience feedback connects the whole project to improve future similar projects, be more efficient and thus reduce the expenses for the project. A descriptive manual for floor grading was developed through dialogues and discussions with Rekab’s staff who are involved in the work. Information how the employees think about the current situation is and works are analyzed, which gives an insight into what the employees think. For this report, it was considered a more appropriate way of working than interviews or questionnaires as it provides faster answers and a more open dialogue can be held. When different viewpoints of how one element of screed performed, the results were compiled. The manual presents all the four different parts described in the theory specifically for the momentary floor grading. What is important to think about, how this element is carried through and what should be included in planning and experience feedback. Even though the manual is followed carefully, and every step gets the time it demands, the result is varied. Much is about practicing it and getting routine for floor grading. The construction period for a whole project is long therefor the momentary floor grading occurs once a year, which makes it hard to practice it and get a routine for it. Unlike a company that only works with floor grading and doing it daily which leads to getting more exercise and therefore can deliver a better result.
489

Energieffektivisering vid renovering av Lamellhus på Mariehemsvägen / Energy efficiency in the renovation of Lamellhus on Mariehemsvägen

Abed, Ahmed Ghafel January 2018 (has links)
I Sverige byggs det mer än någonsin och hustillverkningen går framåt. Samtidigt ökar medvetenheten kring byggnaders energianvändning och dess medföljande påverkan på klimat och hållbarhet. Därför höjer Boverket ständigt kraven på nyproducerade och renoverade byggnaders energiprestanda. Enligt nuvarande krav från Boverket (BBR, 2017) får primärenergitalet för flerbostadshus högst vara 85 kWh per kvadratmeter tempererad golvyta och år. Detta gäller även enligt kommande krav år 2021, men med skillnaden att U-värdet kommer att minska 0,4 till 0,35 W/m2 K vilket innebär att flerbostadshus måste byggas på ett mer effektivt sätt för att minska energianvändningen. En stor del av nybyggnationer och nyrenoverade flerbostadshus måste därefter genomföra energieffektiviserande åtgärder på sina byggnader för att uppfylla kommande krav. Detta examenarbete har genomförts i samarbete med Rikshem AB och undersöker vad för effekt olika energieffektiviserande åtgärder har för påverkan på deras Lamellhus. Syftet är att teoretiskt minska Lamellhusets specifika energianvändning från 187,4 till 70 kWh/m2 Atemp, år och därmed reducera primärenergitalet tillräckligt för att uppfylla kommande krav enligt BBR nära-nollenergibyggnad. För att teoretiskt sänka specifik energianvändning och därmed primärenergital kommer projektet genom manuella beräkningar och med hjälp av datorverktyg undersöka olika energieffektiviserande åtgärder på husets konstruktion och installationssystem. Resultaten visar att åtgärderna på fastigheten klimatskal är tillräckliga för att uppfylla kraven. Om alla åtgärder enligt paket 1 eller 2 på konstruktionen kombineras kommer att specifik energianvändning enligt BBR 16 (2010) ligga på 83-94 kWh/m2 Atemp, år och enligt primärenergital BBR 25 (2017) ligger på 68-77 kWh/m2 Atemp, år. Resultaten visar även på hur stor del av en byggnads energianvändning som ventileras ut. Att byta ut ventilationssystemet från F-system till FTX-system på referenshuset i grundfallet, är den åtgärd som ger en av de största effekterna, med en värmebesparing (25,5-26,7 %). I kombination FTX-systemet med fjärrvärme kan specifik energianvändningen minskas så långt som möjligt. Om åtgärden med FTX-system tillämpas tillsammans med befintlig fjärrvärme och alla åtgärder på konstruktion enligt paket 1 eller 2 ger detta en minskning på cirka (70-75 %) jämfört med grundfallhuset vilket motsvarar 42-51 kWh/m2 Atemp, år enligt BBR 16 och enligt BBR 25 är siffrorna ännu lägre. Om beräkningen tar hänsyn till köldbryggor och luftläckage i huset kommer resultatet att öka. Resultaten visar även på att en sådan investering återbetalar sig efter 15-16 år. Att ta hänsyn till kalkylränta på 5 % är det lönsamt över 30-31 år eller mer, men med en kalkylränta på 8 % förlorar man lönsamheten. / In Sweden more houses than ever before are being built, and the house production is moving forward. At the same time, awareness of the energy use of buildings and its accompanying impacts on climate and sustainability are increasing. Therefore, Boverket constantly raises the demands for the energy performance of newly built and refurbished buildings. According to current requirements from Boverket (BBR, 2017), the primary energy value for apartment buildings may not be more than 85 kWh per square meter of tempered floor space and year. This also applies according to future requirements in 2021, but with the difference that the average U-value will decrease from 0.4 to 0.35 W/m2 K which means that apartment buildings must be built in an efficient way to reduce energy use. A large part of new construction and newly refurbished apartment buildings must then implement energy efficiency measures on their buildings to meet future requirements. This degree project has been carried out in collaboration with Rikshem AB who wants to investigate the impact of various energy efficiency measures on their apartment building ”Lamellhus”. The aim is to theoretically reduce apartment buildings ”Lamellhusets” specific energy use from 187,4 to 70 kWh/m2 Atemp, year and thus reduce the primary energy enough to meet future requirements according to BBR near-zero energy building. To theoretically reduce specific energy use and thus primary energy value, the project through manual calculations and with the help of computer tools examined various energy efficiency measures on the building's construction and installation system. The results show that the measures on the property climate shell are sufficient to meet the requirements. If all the measures according to package 1 or 2 on the design are combined, specific energy use according to BBR 16 (2010) will be at 83-94 kWh/m2 Atemp, year and the primary energy value according to BBR 25 (2017) will be at 68-77 kWh/m2 Atemp, year. The results also show how much of a building's energy use is ventilated. Replacing the ventilation system from F-systems to FTX-systems on the reference house in the base case, is the measure that gives one of the greatest impacts with a heat saving of (25.5-26.7%). In combination FTX-system with district heating, specific energy consumption can be reduced as low as possible. If the operation with the FTX-system is applied together with the existing district heating and all measures on the construction according to package 1 or 2, this gives a reduction of approximately (70-75 %) compared to the base case corresponding to 42-51 kWh/m2 Atemp, year according to BBR 16 and according to BBR 25, the figures are even lower. If the calculation considers thermal bridges and air leakage in the house, the result will increase. The results also show that the investment repays itself after 15-16 years with a simplified payback. With a calculation rate of 5 %, it is profitable over 30-31 years or more, but with a calculation rate of 8 % it is not profitable.
490

Application of design for manufacture principles to building design and construction

Fox, Stephen John January 2001 (has links)
The aim of this thesis is to answer the two research questions: how can design for manufacture be applied during building component design and building design?; and how can the application of design for manufacture be successful in improving the productivity and quality of building component production and building construction? These two questions emerged during exploratory research focused on the use of design to improve construction industry productivity and quality. Subsequent review of manufacturing literature revealed that the two key principles of design for manufacture are standard production design improvement rules and standard production design evaluation metrics. Review of construction literature, and a survey involving over one hundred and fifty industry practitioners, revealed that, whilst rules and metrics for building components and buildings do not currently exist, there are no fundamental reasons why they could not be developed and applied successfully. These findings led to the generation of the research hypothesis: design for manufacture principles can be applied successfully to building components and buildings. The research hypothesis was tested by two interventions, action research within a private business which manufactures and installs building components, and a case study with a multi-national company which designs and constructs buildings. These interventions resulted in significant business benefits. Further, they confirmed that it is both technically feasible and economically viable to apply rules and metrics to building component design and building design, and that doing so can improve the productivity and quality of building component production and building construction. Following analysis of research findings, strategic plans were developed for the successful application of rules and metrics. These were validated through interviews with senior construction industry practitioners. Contributions to knowledge include the strategic plans for successful application of rules and metrics. These cover the full range of organisations working in the construction industry and, together with the detailed descriptions of the interventions, offer practical guidance for industry practitioners seeking to improve productivity and quality. The research also makes a contribution in the area of research methodology. It has shown that threats to research validity in the construction industry can be counteracted by applying a quasi-experimental perspective to action research interventions and case studies.

Page generated in 0.0355 seconds