Spelling suggestions: "subject:"benefit:cost ratio"" "subject:"benefit:cost patio""
11 |
Hodnocení ekonomické efektivnosti a rizik projektů silnic na území Jihomoravského kraje / Evaluation of Economic Efficiency and Risks of Projects of Roads in South-Moravian RegionKovář, Jakub Unknown Date (has links)
This thesis deals with the issue of Evaluation of Economic Efficiency and Risks of Projects of Roads in South-Moravian Region. The first part of the thesis is theoretical. In the introduction defines the life cycle of an investment project. The studies and documentation of project are described. Furthermore, the thesis deals with the methodological evaluation of the effectiveness of public projects. The practical part of the thesis is aimed on the processing of economic and risk analysis. The evaluated project is the reconstruction of road and the construction of a new bridge structure on the road II/374 between the village Bílovice nad Svitavou and the town Adamov. The eCBA application was used to evaluate efficiency. A qualitative risk analysis of the project is carried out at the end of this thesis.
|
12 |
Hodnocení investičního záměru výstavby mateřské školy / Evaluation of Investment Plan of Kindergarten ConstructionJanusová, Barbora Unknown Date (has links)
The diploma thesis focuses on the evaluation of investment plan for the kindergarten construction, what is a public investment project. The first part of the thesis is the theoretical part, which discusses the theoretical basis of investments, investment plan, investment and public projects, investment decision - making and strategic planning. The theory part also describes the feasibility study and methods of project evaluation. Within the methods of project evaluation, the thesis deals with the Cost – Benefit analysis. The practical part of the thesis evaluates the investment plan named “Nástavba a přístavba mateřské školy Elišky Krásnohorské 15, Brno “, where is also performed the sensitivity analysis and qualitative risk analysis. The evaluation of investment plan for the kindergarten construction is performed in the eCBA application.
|
Page generated in 0.0735 seconds