• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 32
  • 26
  • 5
  • 5
  • 5
  • 5
  • 5
  • 5
  • 5
  • 1
  • 1
  • Tagged with
  • 79
  • 79
  • 48
  • 37
  • 34
  • 30
  • 26
  • 24
  • 23
  • 22
  • 19
  • 17
  • 17
  • 16
  • 16
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
51

Komorový most přes rychlostní komunikaci / Bridge formed by cell box girder across the expressway

Klein, Vojtěch January 2017 (has links)
The aim of this thesis is to design a bridge over an expressway and a railway. There have been designed three alternatives. For detailed solving was chosen variant transferring directionally divided communication by two identical bridges, formed by a cell box girder. The thesis includes drawings, representation of the construction process, visualisations and a structural analysis. Designing and checks were carried out according to European standarts.
52

Most 203 na dálnici D1 v Považské Bystrici / Bridge No. 203 on the highway D1, Považská Bystrica

Mudrík, Marián January 2022 (has links)
The diploma thesis deals with alternative design of bridge on highway D1 near Považská Bystrica. Bridge is designed as composite steel-concrete bridge with 6 spans in length 35,7m + 42m + 42m + 42m + 42m + 35,7m. Overall length of superstructure of the bridge is 241m. Construction material used in design is steel S355, concrete C35/45 and reinforcing steel bars are grade B500B. Calculation of superstructure of two variants was performed in preliminary design. First variant is twin-girder structure system and box-girder structure system is second variant. Selected twin-girder bridge was developed in more complex structural design report. Direct erection in place with temporary piers was selected as assembly method of steel structure. Slab concreting will be done by mobile formwork. The design and calculation of the bridge structure was carried out according to valid European design codes. The diploma thesis includes engineering report, structural design report of variants, structural design report of final variant, bill of quantities of assembly parts and drawing documentation.
53

Komorový most / Box girder bridge

Vostal, Lukáš Unknown Date (has links)
The subject of this thesis is the design of a prestressed box girder construction with several spans. Two variants are designed and for detailed solving was chosen the variant of the box girder. The length of loadbearing structure is 212 m, the longest span has 60 m. The calculation of load effects is done by software Scia Engineer 19.1. Drawing part is done by software Allplan Engineering 2021. The thesis includes drawings, representation of the construction proces, visualization and a structural design. Designing and assessments were made according to currently valid European standarts.
54

Structural Condition Assessment Of Prestressed Concrete Transit Guideways

Shmerling, Robert Zachary 01 January 2005 (has links)
Objective condition assessment is essential to make better decisions for safety and serviceability of existing civil infrastructure systems. This study explores the condition of an existing transit guideway system that has been in service for thirty-five years. The structural system is composed of six-span continuous prestressed concrete bridge segments. The overall transit system incorporates a number of continuous bridges which share common design details, geometries, and loading conditions. The original analysis is based on certain simplifying assumptions such as rigid behavior over supports and simplified tendon/concrete/steel plate interaction. The current objective is to conduct a representative study for a more accurate understanding of the structural system and its behavior. The scope of the study is to generate finite element models (FEMs) to be used in static and dynamic parameter sensitivity studies, as well load rating and reliability analysis of the structure. The FEMs are used for eigenvalue analysis and simulations. Parameter sensitivity studies consider the effect of changing critical parameters, including material properties, prestress loss, and boundary and continuity conditions, on the static and dynamic structural response. Load ratings are developed using an American Association for State Highway Transportation Officials Load and Resistance Factor Rating (AASHTO LRFR) approach. The reliability of the structural system is evaluated based on the data obtained from various finite element models. Recommendations for experimental validation of the FEM are presented. This study is expected to provide information to make better decisions for operations, maintenance and safety requirements; to be a benchmark for future studies, to establish a procedure and methodology for structural condition assessment, and to contribute to the general research body of knowledge in condition assessment and structural health monitoring.
55

Předpjatý komorový most / Prestressed box girder bridge

Štíchová, Kateřina Unknown Date (has links)
The subject of this diploma thesis is the design of a load–bearing structure, whitch is situated in the extravillain between the town of Chomutov and the village Křimov. Main purpose of this structure is to pass a roadway I/7 across the valley. There are three options of design and one of them – the prestressed box girder bridge with slanted walls is chosen for more detailed elaboration. The major load–bearing structure is five–span with lenghts 46.50 + 58.00 + 58.00 + 58.00 + 46.50 m, made of post–tensioned nad cast–in–place concrete. The total lenght of load–bearing structure is 269.00 m and the width of load–bearing structure is 13.50 m, the bridge is straight in plan. The structure is analyzed by several computational models, which are designed in Scia Engineer 20.0 software. The structure is analysed in longitudinal and cross directions. The assessments of load state limit and usability limit state are made according to valid standards. This thesis also included time dependent analysis (TDA), that takes construction stage analysis into account.
56

Návrh silničního ocelobetonového komorového mostu na obchvatu Bludova / Design of steel-concrete composite structure of road box girder bridge on by-road of Bludov

Kuba, Michal January 2018 (has links)
The aim of this work is design and assessment of the box-girder road bridge on by-road of Bludov. Bridge is designed as composite steel concrete bridge with 5 spans with distances between supports of 31,25 m; 40,0 m; 60,0 m; 60,0 m and 40,35 m. Main bearing structure is designed as open steel box-girder with reinforced concrete deck. Box girder is braced with longitudinal and transversal bracings. Main structure is separated for each traffic direction. The bridge crosses river Morava and railway in 2nd and 3rd span, respectively. The category of road I/44 is S 21,5/100. The height of steel box girder is designed as 2,5 m. Bridge will be built by incremental launching method, with in-situ casted concrete deck afterwards. The bridge is designed according to current standards. Supporting elements are designed from steel of class S 355 and concrete of class C35/45.
57

Dálniční komorový most / Highway box girder bridge

Ondrůšková, Kamila January 2018 (has links)
The subject of the diploma thesis is the bridging design of the valley and Doľanský potok on the D1 motorway in the section Jánovce - Jablonov in Slovakia. Three variants of bridging have been designed and then compared. A post-tensioned construction of the box girder cross section was chosen as the most suitable variant, which was further checked. The static calculation was drawn up according to European standards.
58

Mostový jeřáb jednonosníkový / Bridge crane one-girder

Chroust, Martin January 2018 (has links)
The focus of this thesis is the construction of a single girder overhead crane. The goal is to render a crane construction according to preset parameters. The parameters include a lifting power of 8,000 kg, a 10,000 mm reach, a 2,400 mm wheelbase and a stroke of 8,000 mm. The thesis includes brief theoretical research focused on overhead cranes, their various types and description of their main components. Brief description of chosen parameters for the construction itself follows. The description of chosen parameters includes calculations of strain acting during operation, technical and stability parameters, essential for the construction. All calculations were made with regard to valid Czech technical standards and specialized literature which focuses on the construction of cranes and their parts. Finally, the thesis is extended by the required technical drawings.
59

Ocelová konstrukce silničního mostu / Steel construction of the road bridge

Kloda, Petr January 2019 (has links)
The aim of the master thesis was a design of the steel-concrete composite road bridge for a main road in Ostrava. The part of the design was a variant design of the bridge which has theoretical spans equal to 44 m + 55 m + 44 m. Total span of the bridge is then 143 m. Two variants of the bearing steel structure are compared in the preliminary structural design, in the first one a twin-girder is designed and in the second one a box-girder bridge is assessed. The width of the bridge is 14 m and a launching of the bridge without temporary supports is chosen as the assembly method. The design of the bridge structure was carried out according to the valid standard ČSN EN. The final thesis contains variant design, structural design report, where a bill of quantities is stated, engineering report and drawings.
60

Most přes železniční trať / Bridge ower railway line

Prekop, Michal January 2020 (has links)
Diploma thesis is focused on a design of the road bridge of the category S7,5 in cadastral territory of a municipality Polanka nad Odrou. Three preliminary studies have been proposed. Box girder beam with a slant walls were selected for more detailed processing. Construction of the bridge is going to be build by time-dependent analysis on a solid formwork. The calculation of load is done by using computer software Midas Civil 19 v 2.1. and Scia Engineer 19.1. Selected preliminary was assessed according to the recent Europan standards.

Page generated in 0.0402 seconds