• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 14
  • 4
  • Tagged with
  • 21
  • 21
  • 21
  • 17
  • 14
  • 14
  • 11
  • 10
  • 9
  • 9
  • 8
  • 8
  • 8
  • 8
  • 8
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
21

Dálniční vícepolový most / Multi-span highway bridge

Doležal, Lukáš January 2022 (has links)
The subject of diploma thesis is designing multi-span highway bridge over Řepovský potok valley, dirt roads and biocorridor. Three variants of bridge were designed and one of them – box girder 10 span bridge, has been chosen. Bridge deck is made from cast in place post tension prestressed beam. Load-bearing structure is concreting step by step on fixed and moving support. Total length of bridge is 560 m. The analysis of structure was projected on several computational models. They have been made in software Midas Civil and SCIA Engineer 18.1. The assessments of ultimate limit state and serviceability limit state were made in all steps of building in longitudinal and cross direction. In the analysis in longitudinal direction is included the time dependent analysis. Structural design was made in software MS Excel according to valid standards. Finally, drawing documentation and visualization were made.

Page generated in 0.0466 seconds