• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 26
  • 1
  • 1
  • Tagged with
  • 28
  • 28
  • 24
  • 23
  • 20
  • 19
  • 15
  • 14
  • 12
  • 12
  • 12
  • 11
  • 10
  • 9
  • 8
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
21

Bytový dům v Uherském Hradišti / The apartment house in Uherské Hradiště

Kročová, Romana January 2014 (has links)
The topic of the thesis is the design of new residential building in Uherské Hradiště. The aim is to develop detailed documentation for construction. The work includes studies, drawings, text and part of the calculation. It is a detached residential building with ground plan dimensions of approximately 16,5 x 26,5m. The building has 4 floors and a flat roof. The building is made of ceramic bricks, ceilings are monolithic reinforced concrete. Roofing is made up of single shell flat roof. The building is located on undeveloped land in housing estates on flat terrain. Residential building contains 16 apartments. Part of the 1st floor is also 6 separate garage.
22

Bytový dům v Tišnově / The apartment house in Tišnov

Egerová, Tereza January 2014 (has links)
The topic of the thesis is the design of new residential building in Tišnově. The aim is to develop detailed documentation for construction. The work includes studies, drawings, text and part of the calculation. It is a detached residential building with ground plan dimensions of approximately 13.5 x 37 m. The building has 4 floors and a flat roof. The building is made of ceramic bricks, ceilings are monolithic reinforced concrete. Roofing is made up of single shell flat roof. The building is located on undeveloped land in housing estates on flat terrain. Residential building contains 12 apartments, one of which is completely wheelchair. There are also 6 separate garages on the first floor.
23

Bytový dům / Apartment building

Ondráčková, Andrea January 2017 (has links)
This diploma thesis describes of design a new residential building situated in Brno - Bystrc. It is a four storey building with a basement. House is designed from brick system and his roof is designed as single-flat roof. The roof above third floor is split in two parts where the first part is made as terrace and the second part is a vegetative green roof. The building is divided into two working parts. First part is used for housing. It consists of 40 housing units. . The last part of it is public garage. It is intended for users of residential units. The documentation of this project is elaborated with regard to contemporary Czech legislation and standards.
24

Bytový dům v Trutnově - stavebně technologický projekt / Apartment building in Trutnov construction technology project

Schreiber, Jiří January 2018 (has links)
In my master´s thesis I am talking about solution of building a top rough construction technology in a block of flats. The content of my thesis are mainly worked out technical regulations concerning monolithic ceiling constructions and vertical load bearing constructions. Regarding the phase of the top rough construction, also there are a proposition of a building site organization, a technical report about the building site organization, a technical report about a building-technological project, solution of construction orgaization, a timetable, an item budget and a proposition of machine compositions.
25

Rezidenční bydlení: bytový dům Žirovnice / Residential Housing: Zirovnice Apartment Block

Houška, Petr January 2013 (has links)
The diploma thesis is a project of an apartment block with a total number of 10 apartments. The building is located in the cadastral areas of Žirovnice 797154 on the numbers of parcels 653/1, 634/1, 634/2. The building is a five-storey building with four floors above the ground and one underground floor. Floors are designed as a brick system with the contact insulation. Underground floor consists of a reinforced concrete wall monolith which is based on the footings. Horizontal structures are made up of prefabricated ceramic system Miako and a reinforced concrete monolithic slab. The roof is flat and single-layer. The floors are connected by monolithic reinforced concrete staircase and an elevator which is located in the shaft.
26

Mateřská škola v Tišnově / Nursery school in Tišnov

Kerberová, Lenka January 2013 (has links)
The new building Nursery school is situated in Tisnov. Under the two storey building partialy runs basement. On the ground floor is located two departments nursery school with economic part. On the second floor is the classrooms and socialrooms. In the basement are mainly storerooms and utility rooms. The building is made of ceramic bricks and insulation contact system. The first storey is partly roofed with a flat roof and the second storey is sloped roof roofed. The building is constructed on footing foundations.
27

Centrum integrovaného záchranného systému / Centre of Integrated Safety System

Soukup, Ondřej January 2013 (has links)
It is a new Centre of the Integrated Rescue System to p No. 375/2 in the cadastral Sand 720755th The project documentation is conducted only for the fire station. that consists of three dilated from buildings. Building for day stay is three-storey, two-storey garage with workshops and drying storey tower. Brick construction system based on the footings. Horizontal structure prestressed panels are at SPIROLL. The roof is flat, single-layer and desk hunter cased. Concrete floors are connected by a staircase in the building for day stay and welded steel in the drying tower.
28

Horská chata / Chalet

Chovancová, Andrea January 2017 (has links)
The aim of this thesis is to design a mountain chalet. Chalet is intended for recreation and accommodation for 23 persons and is designed to gently sloping land in the village of Horní Bečva. The building has two floors without a basement. The main entrance to the building is from the southern side entrance for staff is on the eastern side and the other side entrance to the building is from the north. Part of the building for accommodation is situated on the 2nd floor. Perimeter and interior bearing walls are designed from brick blocks Porotherm in 2.NP then the inner walls of plasterboard. The construction of a roof over the main part of the building is made up of wooden roof purlin system, a roof over your wellness zone is flat vegetation, and the roof over the vestibule is flat with classical music. The main part of the building is covered with a gable roof with a slope of 35 degrees inclinations flat roof over the vestibule wellness zone and 3%.

Page generated in 0.1098 seconds