Spelling suggestions: "subject:"bridges productionsection scheduling."" "subject:"bridges productionisation scheduling.""
1 |
Highway bridge construction production rates for time estimationHuh, Youngki, O'Connor, James Thomas, January 2004 (has links)
Thesis (Ph. D.)--University of Texas at Austin, 2004. / Supervisor: James T. O'Connor. Vita. Includes bibliographical references. Also available from UMI.
|
Page generated in 0.1052 seconds