Spelling suggestions: "subject:"budget estimation"" "subject:"eudget estimation""
1 |
Computerised analyses of estimating inaccuracy and tender variability : causes, evaluation and consequencesAbdel-Razek, Refaat Hassan January 1987 (has links)
The two elements of a tender sum are the cost estimate and the mark-up. Variations in tenders can be attributed to inaccuracy in the estimate and variations in the applied mark-up. The weaknesses of current published literature are that the causes of the inaccuracy in the estimate or the variability in a mark-up are not defined in such a way that they can be analysed and evaluated. The inaccuracy of a cost estimate results from combining the inaccuracy of its constituent elements. Thus the inaccuracy of each element needs to be evaluated. The consequences of estimating inaccuracy and mark-up variability are inadequately described in current literature, which tends to assume that mark-up variability is negligible. This research addresses these weaknesses.
|
Page generated in 0.0979 seconds