• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 20
  • Tagged with
  • 23
  • 23
  • 15
  • 10
  • 6
  • 6
  • 6
  • 6
  • 5
  • 4
  • 4
  • 4
  • 3
  • 3
  • 3
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

The control of building costs: a study of thedocumentation required, with special reference to Hong Kong.

Bunting, Archibald Alexander. January 1970 (has links)
published_or_final_version / Architecture / Master / Master of Architecture
2

Parametric cost estimating model for conceptual cost estimating of building construction projects

Phaobunjong, Kan 28 August 2008 (has links)
Not available / text
3

Cost analysis; a method for obtaining costs of construction work and compilation of the data for estimating

McEver, William Lenton 05 1900 (has links)
No description available.
4

Construction price forecasting: an empirical study on improving estimating accuracy for building works

Ng, Yuen-yuen., 吳淵源. January 1995 (has links)
published_or_final_version / Real Estate and Construction / Master / Master of Science in Construction Project Management
5

An integrated model of computer-aided cost estimating/scheduling in construction management

Appau, Kwaku Addae 12 1900 (has links)
No description available.
6

Causes and effects of cost underestimation on construction projects in South Africa

Awosina, Abiodun Emmanuel January 2017 (has links)
Thesis (MTech (Construction Management))--Cape Peninsula University of Technology, 2017. / The South African construction industry is faced with challenges which contribute to unsuccessful project delivery. Cost underestimation have negative contribution to construction projects, the effects and causes of cost underestimation have not been adequately explored with the objective of providing mitigating mechanisms. This study is aimed at investigating factors which contribute to cost underestimation, the prevalence of cost underestimation in relation to causes and effects of cost underestimation, with the final objective to establish mechanisms for efficient mitigation of cost underestimation. The study review literatures relating to cost estimation, and additional data were collected in form of a structured questionnaire. The questions highlight the following areas; project planning, method and techniques, and tools as factors contributing to cost underestimation; scope changes and risk associated with specialized building works as prevalence of cost underestimation; planning stage, design and material changes risk due to unforeseen factors as causes of cost underestimation; loss of reputation, exposure to risk and financial loss as effects of cost underestimation; and design requirements, effective techniques and planning as cost underestimation mitigation mechanism. A total of one hundred and forty two (142) emails were sent via the survey website to the selected respondents and seventy four (74) responses were received. A quantitative approach was used and a convenient purposive sampling of respondents was used by handpicking the respondents from the available register of the South African Council for Quantity Surveying Professions (SACQSP) and the general building contractors registered with Construction Industry Development Board (CIBD), construction professionals working in quantity surveying practice and construction firms within and around Cape Town.
7

Construction Systems for Detached, Single-story Concrete Block Houses in Florida: Current Practices, Costs and Potential Innovations

McDonald, Randolph DeShields 01 January 1973 (has links) (PDF)
Concrete block single-story detached homes are popular residences in Florida, but construction materials and methods must undergo changes to combat rising prices and material shortages. Those systems with the greatest pressure of price or material shortage will change first. When current costs and methods are examine, it is found that two systems, roof and exterior walls, have the greatest need for changes in the immediate future; and one system, thermal insulation, needs an empirical study. The roof is of materials which are in short supply and rapidly increasing in cost. The study concludes that, with present cost trends, metal frame members for the roof or a reinforced concrete slab roof are feasible alternatives. The exterior walls have excessive labor costs, and the feasible alternative may be cast-on-site masonry tilt-up panel walls. Power prices, electrical and fuel, create a need to establish new guidelines for the extent of home thermal insulation. The heat gains and losses are examined to direct future studies of the home's thermal insulation problems. The concrete block home will continue to be viable if the necessary innovations are implemented to reduce cost rate of increase and to reduce operating and maintenance costs.
8

Hong Kong government's construction price estimating methodology

Pang, Wai-shing, Wilson., 彭偉成. January 1996 (has links)
published_or_final_version / Real Estate and Construction / Master / Master of Science in Construction Project Management
9

Evaluation of the cost estimating systems

Choi, Ming-hang, Edmund., 蔡銘鏗. January 2001 (has links)
published_or_final_version / Real Estate and Construction / Master / Master of Science in Construction Project Management
10

A study of the cost management process and estimation techniques for estimating building services installations in the buildingconstruction industry

Wu, Kin-kwong., 吳健光. January 1998 (has links)
published_or_final_version / Architecture / Master / Master of Science in Construction Project Management

Page generated in 0.0824 seconds