Spelling suggestions: "subject:"buildings - china - long long."" "subject:"buildings - china - long hong.""
161 |
Crews facilities complex for Cathay Pacific Airways at Chek Lap Kok Airport梁碧盈, Leung, Pik-ying, Blanche. January 1995 (has links)
published_or_final_version / Architecture / Master / Master of Architecture
|
162 |
A place for art: dissolution of boundariesLau, Pui-chuen, Lisa., 劉佩荃. January 2001 (has links)
published_or_final_version / Architecture / Master / Master of Architecture
|
163 |
Property management and property value of high-rise private residential buildings in Hong KongLam, Sze-nok, Candy., 林詩諾. January 2003 (has links)
published_or_final_version / Housing Management / Master / Master of Housing Management
|
164 |
A community for studentsChan, Kwan-fong, Florence., 陳群芳. January 1998 (has links)
published_or_final_version / Architecture / Master / Master of Architecture
|
165 |
Adaptable home: a sustainable alternative to housing in Hong Kong and Pearl River DeltaYick, Sin-yan, Jamie., 易倩昕. January 2004 (has links)
published_or_final_version / Architecture / Master / Master of Architecture
|
166 |
Redevelopment of Yeung Uk Road complex: market as activity generatorNip, Wing-ki, Vicky., 聶詠祺. January 2001 (has links)
published_or_final_version / Architecture / Master / Master of Architecture
|
167 |
The Japanese Consulate and the Japanese Cultural CentreIto, Hikoko., 伊藤彥子. January 1996 (has links)
published_or_final_version / Architecture / Master / Master of Architecture
|
168 |
Communal school village in Telegraph BayChung, Lai-shun, Nelson., 鍾禮信. January 2002 (has links)
published_or_final_version / Architecture / Master / Master of Architecture
|
169 |
A Chinese government building in Hong KongMong, Ka Sing January 1987 (has links)
This thesis proposes a Chinese government building in HONG KONG reflecting the contemporary social, economic and political situation. It includes three parts: First, the study of the building systems of the building which reflect the symbolic idea of a gateway in the Central Business District of Hong Kong; second, the proposal to connect the existing system of elevated footbridges in the urban fabric of CBD in Hong Kong; Third, the implementation of this project by an advanced computer graphics workstation IBM 5080 with the softwares CADAM and ISD.
In this way, the results are elucidated by a series of computer drawings which not only exemplify the architectural design process but also act as guidelines for students interested in computer-aided design. / Master of Architecture
|
170 |
Ma On Shan Community Centre and LibraryWong, Wai-lam, William, 黃偉霖 January 2000 (has links)
published_or_final_version / Architecture / Master / Master of Architecture
|
Page generated in 0.1196 seconds