• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2
  • 1
  • Tagged with
  • 3
  • 3
  • 3
  • 3
  • 2
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

A Computational Model for Optimal Dimensional Speed on New High-Speed Lines

Yousefi Mojir, Kayran January 2011 (has links)
High Speed Lines (HSL) in rail passenger services are regarded as one of the most significant projects in many countries comparing to other projects in the transportation area. According to the EU (European Council Directive 96/48/EC,2004) , high-speed lines are either new-built lines for speeds of 250km/h or greater, or in some cases upgraded traditional lines. At the beginning of 2008, there were 10,000 km of new HSL lines in operation, and by taking into account the upgraded conventional lines, in total, there were 20,000 km line in the world. The network is growing fast because of the demand for short travelling time and comfort isincreasing rapidly. Since HSL projects require a lot of capital, it is getting more important for governments and companies to estimate and to calculate the total costs and benefits of building, maintaining, and operating of HSL so that they can decide better and more reliable in choosing between projects. There are many parameters which affect the total costs and benefits of an HSL. The most important parameter is dimensional speed which has a great influence on other parameters. For example, tunnels need larger cross section for higher speed which increases construction costs. More important, higher speed also influences the number of passengers attracted from other modes of transport. Due to a large number of speed-dependant parameters, it is not a simple task to estimate an optimal dimensional speed by calculating the costs and benefits of an HSL manually. It is also difficult to do analysis for different speeds, as speed changes many other relevant parameters. As a matter of fact, there is a need for a computational model to calculate the cost-benefit for different speeds. Based on the computational model, it is possible to define different scenarios and compare them to each other to see what the potentially optimal speed would be for a new HSL project. Besides the optimal speed, it is also possible to analyze and find effects of two other important parameters, fare and frequency, by cost-benefit analysis (CBA). The probability model used in the calculation is based on an elasticity model, and input parameters are subject to flexibility to calibrate the model appropriately. Optimal high-speed line (OHSL) tool is developed to make the model accessible for the users.
2

Posouzení efektivnosti vybrané veřejné stavební zakázky / Evaluation of Efficiency of Selected Public Construction Order

Pavelek, Jan January 2017 (has links)
This thesis is focused on the revitalization of brownfield implemented through public producrement and selected in the city of Brno. The theoretical part includes basic concepts that explain the issue of brownfields, public procurement, and more specifically the assessment of their economic efficiency. The practical part is focused on the specific case of brownfield revitalization through public procurement including its economic assessment. The use of econimic analysis, namely Cost Benefit Analysis (CBA), will be utilized to assess the effectiveness, and socio-economic impacts will also be determined. The purpose of the second part is to determine whether the revitalization thus made more economically advantageous for the city of Brno.
3

Eknomické posouzení projektu realizovaného obcí / Economic Assessment of the Project Realized by Municipality

Vybíhalová, Michaela January 2017 (has links)
The diploma thesis deals with an issue of assessment economic effectiveness of public project which is realized municipality. This thesis is divided into theoretical and practical part. The theoretical part describes a cost-benefit analysis and another methodology for economic assessment of the project. In the practical part is processed case study on a particular public project.

Page generated in 0.611 seconds