291 |
The perceived value of facilities, curriculum and knowledge received by baccalaureate construction alumni from the University of Wisconsin-StoutLentz, Keith A. January 1998 (has links) (PDF)
Thesis--PlanB (M.S.)--University of Wisconsin--Stout, 1998. / Includes bibliographical references.
|
292 |
The recognition of costs in different phases of completion of a construction contractLe Roux, Felix. January 2006 (has links)
Thesis (MSc. (Construction Management)) -- University of Pretoria, 2006. / Abstract in English. Includes bibliographical references.
|
293 |
A computer simulation analysis of alternative methods of accounting for utility construction work in progressQuick, Gordon Douglas, January 1974 (has links)
Thesis--University of Florida. / Description based on print version record. Typescript. Vita. Bibliography: leaves 312-314.
|
294 |
A model for work function characteristics-based prioritization of technologies for captial projectsWon, Seungwon. January 2002 (has links) (PDF)
Thesis (Ph. D.)--University of Texas at Austin, 2002. / Vita. Includes bibliographical references. Available also from UMI Company.
|
295 |
A feasibility analysis of using B.O.T. in the management of public fill in Hong Kong /Wong, Kwok-hung, Gray. January 2002 (has links)
Thesis (M.P.A.)--University of Hong Kong, 2002. / Includes bibliographical references.
|
296 |
The use of tropical hardwood in Hong Kong's construction industry and the possible alternatives /Wong, Chor-tung. January 1994 (has links)
Thesis (M. Sc.)--University of Hong Kong, 1994. / Includes bibliographical references.
|
297 |
The role of finance in competitiveness of indigenous contractors in Hong KongChan, Yee Man Theresa. January 2008 (has links)
Thesis (Ph.D.)--Hong Kong Polytechnic University, 2008. / Adviser: Y.H. Chiang. Includes bibliographical references.
|
298 |
Leadership in project managementXiong, Riyue. January 2008 (has links)
Thesis (M. S.)--Building Construction, Georgia Institute of Technology, 2009. / Committee Chair: Roper, Kathy; Committee Member: Ashuri,Baabak; Committee Member: Thomas, Linda. Part of the SMARTech Electronic Thesis and Dissertation Collection.
|
299 |
Influence factors of engineering productivity and their impact on project performanceLiao, Pin-chao, January 1900 (has links)
Thesis (Ph. D.)--University of Texas at Austin, 2008. / Vita. Includes bibliographical references.
|
300 |
Life cycle assessment in the construction industryYiu, W. Y. January 2001 (has links)
Thesis (M.Sc.)--University of Hong Kong, 2001. / Includes bibliographical references (leaves 66-69) Also available in print.
|
Page generated in 0.0208 seconds