31 |
Life cycle costing analysis and its application in the design of South Australian buildings /Atkinson, David A Unknown Date (has links)
Thesis (MAppSc (Project Management))--University of South Australia, 1995
|
32 |
The determination of equivanlent value in life-cost studies: An intergrated approach.Langston, Craig Ashley January 1994 (has links)
University of Technology, Sydney. Faculty of Design, Architecture & Building. / Past analyses of design solutions for building projects have concentrated on initial capital costs, often to the extent where the effects of subsequent operating costs are completely ignored. However, even in cases where a wider view of cost has been adopted, the discounting process has commonly disadvantaged future expenditure so heavily as to make performance after the short term irrelevant to the outcome, resulting in projects which display low capital and high operating costs to be given favour. Thus design solutions that aim to avoid repetitive maintenance, reduce waste, save nonrenewable energy resources or protect the environment through selection of better quality materials and systems, usually having a higher capital cost, are often rejected on the basis of the discounting process. Furthermore, the formulation of the discount rate has normally lacked rigour and has often resulted in an assumed rate that has implied profit and risk and has ignored taxation. Discounted present value is a measure of equivalence for time-phased costs and benefits derived from consideration of the theoretical investment return, preferably after tax. As it takes account of the cost of money, discounting can be described as leading to the determination of equivalent value using an investment-based or capital productivity approach. It is hypothesized and verified that the value of future costs and benefits is additionally susceptible to fluctuations in their base worth over time as reflected by changes in incremental escalation and the affordability of goods and services between present and future generations. Making adjustments for changes in worth may thus be described as contributing to the determination of equivalent value using a prosperity-based or time preference approach. The analysis of Australian sectorial income and expenditure data over a forty-year period shows that affordability changes can be measured and represented as an index. The discount rate is identified as a combination of the real weighted cost of capital, differential price level changes and diminishing marginal utility, where the latter is depicted by changes in the affordability of goods and services. This results in a composite discount rate that encompasses project-related, product-related and investor-related attributes. Tangible (financial) costs and benefits are discounted by this rate while intangible (environmental and social) costs and benefits are left as real value. Recommendations concerning the determination of equivalent value should ensure that the future operating performance of projects is more equitably assessed and that sustainable development remains an achievable objective in life-cost studies.
|
33 |
Navy positive displacement pump standardization study /Cohen, Ed (Edward I.) January 1994 (has links)
Report (M.S.)--Virginia Polytechnic Institute and State University, 1994. / Vita. Abstract. Includes bibliographical references (leaves 97-100). Also available via the Internet.
|
34 |
On reliability estimation of large electronic systemsSardesai, Shailesh. January 1997 (has links)
Thesis (M.S.)--Ohio University, August, 1997. / Title from PDF t.p.
|
35 |
Four-stage activity-based costing (ABC) system modeling and computer-based application designZhu, Jianxin, January 1999 (has links)
Thesis (M.S.)--West Virginia University, 1999. / Title from document title page. Document formatted into pages; contains xiv, 129 p. : ill. (some col.). Vita. Includes abstract. Includes bibliographical references (p. 127-128).
|
36 |
Design and development of a target-costing model for machiningKokatnur, Ameet. January 2004 (has links)
Thesis (M.S.)--West Virginia University, 2004. / Title from document title page. Document formatted into pages; contains viii, 138 p. : ill. (some col.). Includes abstract. Includes bibliographical references (p. 69-72).
|
37 |
Activity-based costing at colleges and universities understanding, communicating and controlling costs associated with educating different student groups /Evans, Thomas Matthew. Lasher, William F. January 2004 (has links)
Thesis (Ph. D.)--University of Texas at Austin, 2004. / Supervisor: William F. Lasher. Vita. Includes bibliographical references. Also available from UMI.
|
38 |
The requirements for acquisition and logistics integration : an examination of reliability management within the Marine Corps acquisition process /Norcross, Marvin L. January 2002 (has links) (PDF)
Thesis (M.S. in Management)--Naval Postgraduate School, December 2002. / Thesis advisor(s): Brad Naegle, Keebom Kang. Includes bibliographical references (p. 144-152). Also available online.
|
39 |
Development of an integrated project-level pavement management model using risk analysisReigle, Jennifer A., January 2000 (has links)
Thesis (Ph. D.)--West Virginia University, 2000. / Title from document title page. Document formatted into pages; contains xii, 210 p. : ill. (some col.). Vita. Includes abstract. Includes bibliographical references (p. 205-209).
|
40 |
Activity-based costing and management total quality management solution to quality cost shortcomings of the traditional cost accounting systems /Narong, David Kongpiwatana. January 1900 (has links)
Thesis (M.S.)--California State University, Dominguez Hills, 2008. / Adviser: William Trappen. Includes bibliographical references.
|
Page generated in 0.022 seconds