Spelling suggestions: "subject:"last In place"" "subject:"last In glace""
121 |
Stavebně technologický projekt přípravy a realizace Domova pro seniory Žacléř / Construction project for implementation of Retirement home ŽacléřBonaventura, Pavel January 2022 (has links)
The aim of this diploma thesis is to prepare the construction of a Home for the Elderly in Žacléř. The work deals with technical regulations for the dismantling of asbestos roofing, demolition work and monolithic structures. For these regulations, a time plan for the implementation of monolithic structures, a control and test plan for monolithic structures, an itemized budget and a time and financial plan - object-oriented will be prepared. Furthermore, this work contains the coordination situation of the construction with broader transport relations, the design of the assembly machine, the report for the construction site equipment with drawings of the construction site equipment for individual technological regulations and last but not least the health and safety plan and assessment of construction noise. As part of the diploma thesis, several appendices were prepared for this stage, such as crane assessment, details of monolithic stair arms, noise wall scheme, budget for construction site equipment, environmental plan, ceiling and wall formwork scheme and staff balance for selected stages.
|
122 |
Stavebně technologický projekt výrobní haly v Sudoměřicích / Construction technological project of the production hall in SudoměřiceKolacia, Tomáš January 2022 (has links)
The subject of the diploma thesis is construction-technological solution for realization of the production hall with administrative part in Sudoměřice. Parts of the thesis are the technical report for the construction-technological project, a study of the realization of the main technological stages of the building, the solution of the wider transport route links, where I designed and assessed selected transport routes. The other parts of the diploma thesis are design of a site equipment with the technical report of the site equipment, design of the main building machines and mechanisms. The time and financial plans of objects are elaborated, followed by the detail time schedule of the realization of the main building obejct with a workers needs diagram and the item budget of the main building object with the bill of quantities. For the proces of the realization of the reiforced concrete prefabricated construction, the technological regulation for the assembly of elements with usability of the mobile crane, was made. In the diploma thesis, the technological regulation for the reiforced concrete cast-in-place columns and bond beams, was also prepared. Due to the high demands on the quality of the construction, the control and test plans for the assembly of the reiforced concrete prefabricated elements and for the cast-in-place columns and bond beams, were also prepared. Within the environmental protection, the requirements for the certification LEED 2009 Core & Shell, were processed.
|
123 |
Nová Jižní čtvrť a její propojení s řekou Svratkou / New South District and its Connection to SvratkaNedbalová, Monika January 2019 (has links)
Brno has been considering moving the Main railway station for several decades. Countless urban plans have been done through several competitions, the new South District, which will be located north direction of today's Dolní nádraží station in the future. The architectural study, which was the subject of this diploma thesis, designs multifunctional object called Platform. The building could become part of the emerging South District. The base for the architectural study of the Platform was urban concept of South District designed by me as a pre-diploma thesis. The significance of the South District is comparable to the new Main Railway Station in Vienna surrounded by new district. Those opportunities were the foundation for designing compact urban structure with great variability of public spaces and buildings themselves. The new building is located on the Route of experiences, which is an alternative lane to the main boulevard from the Main Station to the centre of Brno. That starts at the railway station, leads through South District and its main square, the waterfront, through the islands of Svratka, to the park next to the river. Lane continues to the rediscovered railway viaduct and further to today's Main railway station. The viaduct was an inspiration for the architectural design, in the sense of material and shape. The mass of the building itself is divided horizontally into two parts. The lower, heavy masonry brick part of the market is visually separated from the upper objects that seem to levitate above the market. These three upper masses grow from the green roof of the market. Their function is already evident due to their facades. Upper part belongs to the two apartment buildings with a regular grid of south-west orientated windows and one coworking facility located in the northern corner of the Platform. The location of the building is significant. The views from the Platform are amazing - one side there is the Svratka River with island
|
124 |
Příprava realizace rozhledny Kelčský Javorník, Rajnochovice / Preparation of the implementation of Kelčský Javorník Lookout Tower, RajnochoviceVokurek, Kamil Unknown Date (has links)
This diploma thesis is based on preparation of the implementation of Kelčský Javorník Lookout Tower in Rajnochovice. The main idea of the lookout tower constructing is to increase the local tourism. Diploma thesis assesses the whole project and it is focused on the foundation of the rough lower construction and also on assembly of the higher construction. Planning was assessed in terms of time, finance and in terms of the use of material resources. The quality of construction will be ensured by created inspection and test plans. To increase the overall service life of the structures, a scheduled maintenance schedule was designed. A variant solution of electricity supply was proposed, which will shorten the construction time, reduce the total construction costs and the overall maintenance of the building during its lifetime.
|
125 |
Příprava realizace polyfunkčního domu v Pardubicích / Realization of a polyfunctional building PardubiceVýborný, Václav January 2016 (has links)
The main contens of the thesis is solving a construction-technological project substructure and the upper shell construction of a polyfunctional building in Pardubice. Excavation and foundation work are done in section A and B1 and B2. Drilled piles are foundation of a polyfunctional building. Drilled piles are support of reinforced concrete grillage, which are from strips foundation and foundation pads. Cast-in-place concrete frame is a form of load-bearing structure, which contens plate ceilings, pillars and walls. Peripheral masonry is from hellow clay blocks, which are between cast-in-place concrete frame. Diploma thesis includes technical report, plan of building side, schedule and the budget of the building, technological instructions, radon prevent, control and testing plan, safety, balance resources, selected constructional details, machinery composition, bill of quantities.
|
126 |
Budova občanské vybavenosti / Civic amenities buildingBaroň, Alexandr Unknown Date (has links)
The first part of this diploma thesis is to design an energy-efficient hotel with restaurant and car parking. The second part is also to create an assessment of the energy performance of the building and usage of energy from renewable sources. Hotel is designed with the idea of „smart buildings“ which means, that all the technological background is controlled by the main computer, which also harvests data to achieve a minimum energy use and financial demand and maximum comfort and safety at the same time by controlling the connected technology. By placing on a sloped terrain in the center of Brno, the basement floor can be used as car parking. The roof of this building is flat, green, with modifications for placing solar panels, whose design is part of this work. The third part of this diploma thesis is the spatial acoustics of the conference room on the first ground floor.
|
Page generated in 0.0587 seconds