71 |
Stavebně technologický projekt objektu knihovny / The library building technological projectBrandtner, Michal January 2018 (has links)
The subject of this final thesis is the building technological project of the library on the street of Kravi hora in the Brno. The final thesis includes a technical report, a coordination situation, a situation of the construction with wider relations with transport route links, a time schedule and financial plan of the construction, a site equipment project, a design of the main machines and mechanisms, a time schedule of the main building object, a supply plan and a plan for transport routes, a technological regulation for cast-in-place floor structure, a control and test plan, a health and safety plan at work on a construction site binding for a carcass, an itemized budget for carcass, a comparison of the solutions for realization of the cast-in-place floor structure and the technological regulation for technology of capture of rainwater for further use.
|
72 |
Galerie letecké techniky a tradic letectví na letišti Medlánky v Brně / Gallery aviation technology and traditions of aviation at the airport Medlánky in BrnoBlahová, Dagmar January 2016 (has links)
This thesis describes design gallery of aviation technology and traditions at the airport in Brno Part of my thesis is focused on urban solution of area layout its interconnections with near districts “Komín“ and “Medlánky“. There is new pedestrian, cycling paths, operational and logistic roads inside the complex layout. This design supposed to keep the two existing historic hangars and demolishing remaining buildings with subsequent completion of necessary objects. Priority and the main idea is to keep compositional and visual axis to ensure visual contact with all airport operational parts to ease of orientation. According to this principle is mass and platform solved with object “gallery”. This object in addition to the exhibition space is also used for administration and operation department of the gallery. In separate part there is ensured catering in form of restaurant with associated technical, operational and sanitary facilities. The gallery is designed to visually and physically separate section used by pilots and airport vehicles from visitors to avoid dangerous situation. Other buildings I have designed in my project are “the clubhouse”, airport administration, emergency accommodation, social activity space mainly designed for aircraft-model pilots and the air traffic control tower. These objects creates border between premises restricted for aero club and visitors.
|
73 |
Polyfunkční dům / Multifunctional buildingFazekas, Dávid January 2018 (has links)
The subject of the master's thesis is elaborate a project documentation to obtain a building permit for the multifunctional house. The proposed building is located in Štúrovo in the urban part of the polyfunctional area with predominant housing. The plot is slightly sloped. The building in question consists of five above-ground floors. The building is divided into a commercial zone, an administrative zone and a living area. The structural system of the building is cast-in-place reinforced concrete frame. The building is roofed with single-shell flat roof. In the preparation of the project documentation was used valid legislation, laws and technical norms. Drawings are made in program Nemetschek Allplan 2013, visualisation is SketchUp program.
|
74 |
Bytový dům "Za Pivovarem" Lázně Bohdaneč - stavebně technologický projekt / Construction Project - Apartment Building "Za Pivovarem" Lázně BohdanečVolf, Miroslav January 2018 (has links)
The aim of this diploma thesis is to process a building construction project for the apartment building “Za Pivovarem” in Lázně Bohdaneč. The building is designed as a four-floor object which has a flat roof, 24 apartments, 24 cellars, 10 garage stalls, 3 terraces that belong to the apartments on the 1st floor and enclosed balconies or balconies for the apartments in the above floors. The thesis focuses on the organization and preparation of the construction process. It contains a technological project for the cast-in-place reinforced concrete floors, which includes also drawings of formwork, a technical-economic balance sheet of the formwork costs and a calculation of the time for formwork removal, a technological project for anhydrite floors and inspection and test plans for both of the above mentioned building procedures, which are dealt with in a more detailed way. The implementation of other construction procedures is described in the preliminary design of implementation. Concerning the work safety, the plan of health and safety at work, focusing on work at heights and other dangers connected to work on the floor constructions, has been processed. Furthermore, there is a time and finance schedule for the whole construction, a construction site project, a set of main machines and mechanisms which includes a comparison of a mobile crane and a tower crane. In addition, broader transport relations have been assessed. The thesis also contains an instruction manual on the main object.
|
75 |
Stavebně technologický projekt administrativní budovy / Constructive technological project of an administrative buildingLačňák, Slavomír January 2018 (has links)
The final thesis is focused on construction of the main technological stages of the administrative building of the Vídeňská in Brno. The final thesis contains the object engineering report, technological study, technological report, design of construction machinery and their transport. It also includes control and test plan, detailed schedule, item budget, and device object design. Finally is a plan of safety measures on the building.
|
76 |
Polyfunkční dům / Multifunctional buildingVyhnálek, Lukáš January 2018 (has links)
Subject of this final thesis is to develop project documents of a new mixed - use building in Prague in Žižkov. The building has 5 above - ground and 2 underground floors. The last floor is partially receding and on the rest of the floor plan, there is a terrace. Automated parking system, cellars and technical background are situated on the second underground floor. On the first underground a above ground floor there is a café and on the second floor there are office spaces. The others floors are designed as residential. Structural sytem of building is cast in place concrete bearing wall system. Exterior building envelope is made of combination of contact thermal insulation system with ventilated facade with thermal insulation of mineral wool insulation. The roof of the building is designed as a nonwalkable warm flat roof.
|
77 |
Rezidence na Dlouhé - stavebně technologický projekt / Residence Dlouha - Building Contruction ProjectTeplý, Tomáš January 2018 (has links)
The subject of this diploma thesis is the building construction project of Residence Dlouha in Olomouc. It is an apartment building with two to four floors and a basement with garages. The diploma thesis contains a time and finance schedule, a site equipment project and technological procedure of a cast-in-place reinforced concrete floor and a green roof including a quality control. Moreover, a set of machines, usage options of a tower crane or a mobile crane and usage options of a mobile pump or a concrete container have been processed for this building. During the building process it is cared about work safety and environment protection.
|
78 |
Domov pro seniory, domov se zvláštním režimem / Senior centerTománková, Marie January 2019 (has links)
The subject of my diploma thesis is the design of a new building "retirement home", a home with a special regime, in the form of project documentation for the construction. The building is partly basement with four above-ground floors and covered by a single-layer flat roof. On the first floor there are common, operational spaces and spaces for commercial use. The other above-ground floors are identical and serve as an accommodation. There is mostly technical background in the basement. The construction system is a wall bi-directional of brick masonry elements, with the exception of basement masonry, which is made of reinforced concrete. The object is based on foundation pads and strips. Ceiling structures are monolithic reinforced concrete. The whole building is insulated by contact insulation and has a ventilated facade.
|
79 |
Příprava realizace výstavby Aktivního centra v Ratíškovicích / Preparation of the construction of the Active Center in RatíškovicePrágr, Michal January 2019 (has links)
The subject of my diploma thesis is preparation of realization of Active center. Diploma thesis includes technological regulation for concrete constructions and the roof, project of machine set, the inspecting and testing plans, plan of BOZP, the budget and the time table of main construction object. I alson did the project of the building site facilities and drawings needed.
|
80 |
Příprava realizace montované haly elektrárny v Mělníku / Preparation of the implementation of the prefabricated hall of the power plant in MělníkVondřejc, Adam January 2019 (has links)
The subject of this diploma thesis is the construction technological project of the implementation of the prefabricated hall of the power plant in Melnik. This thesis conatins a technical report, project of the site equipment with technical report, time and financial plan of the building, study for the realization of major technology stages, desingn of assembly machines, budget of object, technological specification of steel structure and cast-in-place constrution of pump pit, also monitoring and test plans.
|
Page generated in 0.0609 seconds