Spelling suggestions: "subject:"civil engineering contracts"" "subject:"zivil engineering contracts""
1 |
The study of criticality : an investigation based on network theory into the relationship between time and cost in civil engineering bridgeworks contracts and the measurement of the effects of changeSmith, N. J. January 1986 (has links)
No description available.
|
2 |
Sources, causes and minimisation of contractual claims in civil engineering projects in Hong Kong /Yogeswaran, Kumaru. January 1998 (has links)
Thesis (Ph. D.)--University of Hong Kong, 1998. / Includes bibliographical references.
|
3 |
Adverse effects in civil engineering contracts in Hong Kong arising from the confidential nature of arbitrationHarris, Geoffrey S. January 2006 (has links) (PDF)
Thesis (M.A.)--City University of Hong Kong, 2006. / "Master of Arts in arbitration and dispute resolution, LW6409 Research project" Title from PDF t.p. (viewed on May 22, 2007) Includes bibliographical references.
|
4 |
Alternative dispute resolution in Hong Kong Government civil engineering works contractsChan, Yuen Wah. January 2007 (has links) (PDF)
Thesis (M.A.)--City University of Hong Kong, 2007. / "Master of Arts in arbitration and dispute resolution, LW 6409A dissertation." Title from PDF t.p. (viewed on Apr. 1, 2008) Includes bibliographical references.
|
5 |
Sources, causes and minimisation of contractual claims in civil engineering projects in Hong KongYogeswaran, Kumaru. January 1998 (has links)
published_or_final_version / Civil and Structural Engineering / Doctoral / Doctor of Philosophy
|
6 |
The capacity of emerging civil engineering construction contractorsRamokolo, Bruce Sabelo Mpumelelo January 2009 (has links)
Construction management competencies are essential to realise sound practices among and to realise optimum performance by, inter alia, emerging civil engineering contractors. Such competencies enable a clear focus on the business of construction and the management of projects, with increased efficiency and reduced costs as a benefit. The objective of the MSc (Built Environment) treatise study were to determine the current practices and performance of emerging civil engineering construction contractors operating in the Nelson Mandela Bay Metropole. The descriptive method was adopted in the empirical study. The salient findings of the study are: most of the emerging civil engineering construction contracting organisations lack construction management competencies; construction resources are inappropriately managed leading to construction failures; most of the emerging civil engineering construction contracting organisations lack adequate supervision resulting to poor workmanship; there is a shortage of skilled labour amongst emerging civil engineering construction contractors; procurement processes are inappropriate leading to under capacitated emerging civil engineering construction contracting organisations being awarded contracts; most emerging civil engineering construction contracting organisations lack the requisite aptitude for construction; there is a lack of capacity at all management levels of emerging civil engineering construction organisations in managing the business of construction and that of projects; the nine functions of organisations are not comprehensively represented, and self-ratings indicate inadequacy relative to the management function of control, and relative to certain activities of the organising function. Conclusions include that emerging civil engineering construction contracting organisations need to be comprised of technical teams that possess adequate competencies and that use the construction technology to its full use enabling their organisations to stay abreast of their competitors. Recommendations that can contribute towards improving the status quo include: formal civil engineering and construction management education, resources must be present and training should be promoted throughout the industry at all levels of management to ensure proper supervision and correct use of adequately trained labour, skilled or semi-skilled, incapacitated emerging civil engineering construction contractors should be awarded contracts through appropriately and structured procurement procedures, adequate aptitude in construction should be promoted and enhanced in order to realise conceptualisation and visualisation capabilities, comply with legislation, maintain records and communicate using state of the art technology, optimally manage the finances, have the requisite resources and undertake the work efficiently, interact with the respective publics, and market the organisation to ensure sustainability thereof.
|
Page generated in 0.121 seconds