Spelling suggestions: "subject:"clothing grade productionsection planning."" "subject:"clothing grade productionisation planning.""
1 |
Designing a fabric planning process for low volume orders in apparel industry /Chan, Hoi Ying. January 2007 (has links)
Thesis (M.Phil.)--Hong Kong University of Science and Technology, 2007. / Includes bibliographical references (leaves 103-106). Also available in electronic version.
|
Page generated in 0.1621 seconds