Spelling suggestions: "subject:"goal lines anda mining -- managemement"" "subject:"goal lines anda mining -- managementment""
1 |
Long-term scheduling in underground coal mining using mixed binary programmingWest-Hansen, Jan January 1989 (has links)
Recognizing the complexity of coal mining management, e.g., the scarcity of financial resources and the high level of uncertainty, a mixed binary programming model has been developed as an aid for generating production schedules which maximize the associated net present value.
Defining the mine layout as a precedence network, with the nodes representing mining blocks, a solution procedure is developed, based on Benders' partitioning scheme. That is, the procedure iterates between two problems, namely, the master (primal) problem, solved by a combination of heuristic and exact methods, and the subproblem (dual problem), solved partly by inspection and partly as a minimal cost network flow problem. The heuristic methods are based on improvements of existing algorithms for scheduling precedence-related jobs on m processors.
Computational experiences are presented and the procedure is demonstrated on a mining case. / Ph. D.
|
2 |
Guidelines for the usability evaluation of a BI application within a coal mining organizationJooste, Chrisna 07 April 2014 (has links)
Business Intelligence (BI) applications are consulted by their users on a daily basis. BI information obtained assist users to make business decisions and allow for a deeper understanding of the business and its driving forces. In a mining environment companies need to derive maximum benefit from BI applications, therefore these applications need to be used optimally. Optimal use depends on various factors including the usability of the product. The documented lack of usability evaluation guidelines provides the rationale for this study. The purpose is to investigate the usability evaluation of BI applications in the context of a coal mining organization. The research is guided by the question: What guidelines should be used to evaluate the usability of BI applications. The research design included the identification of BI usability issues based on the observation of BI users at the coal mining organization. The usability criteria extracted from the usability issues were compared and then merged with general usability criteria from literature to form an initial set of BI usability evaluation criteria. These criteria were used as the basis for a heuristic evaluation of the BI application used at the coal mining organization. The same application was also evaluated using the Software Usability Measurement Inventory (SUMI) standardised questionnaire. The results from the two evaluations were triangulated to provide a refined set of criteria. The main contribution of the study is the heuristic evaluation guidelines for BI applications (based on these criteria). These guidelines are grouped in the following functional areas: visibility, flexibility, cognition, application behaviour, error control and help, affect and BI elements. / Information Science / M.Sc. (Information Systems)
|
3 |
Guidelines for the usability evaluation of a BI application within a coal mining organizationJooste, Chrisna 07 April 2014 (has links)
Business Intelligence (BI) applications are consulted by their users on a daily basis. BI information obtained assist users to make business decisions and allow for a deeper understanding of the business and its driving forces. In a mining environment companies need to derive maximum benefit from BI applications, therefore these applications need to be used optimally. Optimal use depends on various factors including the usability of the product. The documented lack of usability evaluation guidelines provides the rationale for this study. The purpose is to investigate the usability evaluation of BI applications in the context of a coal mining organization. The research is guided by the question: What guidelines should be used to evaluate the usability of BI applications. The research design included the identification of BI usability issues based on the observation of BI users at the coal mining organization. The usability criteria extracted from the usability issues were compared and then merged with general usability criteria from literature to form an initial set of BI usability evaluation criteria. These criteria were used as the basis for a heuristic evaluation of the BI application used at the coal mining organization. The same application was also evaluated using the Software Usability Measurement Inventory (SUMI) standardised questionnaire. The results from the two evaluations were triangulated to provide a refined set of criteria. The main contribution of the study is the heuristic evaluation guidelines for BI applications (based on these criteria). These guidelines are grouped in the following functional areas: visibility, flexibility, cognition, application behaviour, error control and help, affect and BI elements. / Information Science / M.Sc. (Information Systems)
|
Page generated in 0.2169 seconds