Spelling suggestions: "subject:"concrete bridge dock"" "subject:"concrete bridge dec""
21 |
PREDICTIVE ANALYTICS FOR HOLISTIC LIFECYCLE MODELING OF CONCRETE BRIDGE DECKS WITH CONSTRUCTION DEFECTSNichole Marie Criner (14196458) 01 December 2022 (has links)
<p> </p>
<p>During the construction of a bridge, more specifically a concrete bridge deck, there are sometimes defects in materials or workmanship, resulting in what is called a construction defect. These defects can have a large impact on the lifecycle performance of the bridge deck, potentially leading to more preventative and reactive maintenance actions over time and thus a larger monetary investment by the bridge owner. Bridge asset managers utilize prediction software to inform their annual budgetary needs, however this prediction software traditionally relies only on historical condition rating data for its predictions. When attempting to understand how deterioration of a bridge deck changes with the influence of construction defects, utilizing the current prediction software is not appropriate as there is not enough historical data available to ensure accuracy of the prediction. There are numerical modeling approaches available that capture the internal physical and chemical deterioration processes, and these models can account for the change in deterioration when construction defects are present. There are also numerical models available that capture the effect of external factors that may be affecting the deterioration patterns of the bridge deck, in parallel to the internal processes. The goal of this study is to combine a mechanistic model capturing the internal physical and chemical processes associated with deterioration of a concrete bridge deck, with a model that is built strictly from historical condition rating data, in order to predict the changes in condition rating prediction of a bridge deck for a standard construction case versus a substandard construction case. Being able to measure the change in prediction of deterioration when construction defects are present then allows for quantifying the additional cost that would be required to maintain the defective bridge deck which is also presented. </p>
|
22 |
Přemostění řeky Svitavy a tratě ČD v Blansku / Bridge crossing over Svitava river and railway track in BlanskoSmělíková, Petra January 2015 (has links)
The aim of the Diploma Thesis is elaboration of study of bridge crossing over the Svitava river and ČD railway track in Blansko. It concerns a five-pole steel beam road bridge with through-span which carries road of the third category. The static system of the construction is solved as solid-web beam of 1.3 meters height which is in three middle spans reinforced by truss construction with top chord and system of diagonals without verticals. The height of the main beam where reinforced by trusswork is 4.75 meters. The width of spans in the road axis is 18.5 + 30.525 + 44.4 + 30.525 + 18,5 metres. The bridge deck consists of steel cross beams bonded with reinforced concrete slab of 200 millimeters of thickness. The drive-through width of the roadway is 7.0 meters. The bridge is fitted with right-sided walkway placed on steel cantilevers. The walk-through width of the walkway is 3.0 meters. Material used is S355 Steel, C30/37 Concrete and S460 Steel which is used for marginal spans of the bridge. Load-bearing construction is assessed in compliance with current technical requirements laid down by European Directives, so called “Eurocodes”. The calculation of inner powers is performed using the Scia Engineer 2013.1 software.
|
23 |
Lávka mezi budovami. / The bridge among buildingsChaloupka, Petr January 2012 (has links)
This master's thesis deals with the designing of the appropriate supporting steel structure footbridge for pedestrians. The footbridge is used to connect two separate buildings (buildings D and Z at the Faculty of Civil Engineering Brno University of Technology). Four variants have been designed about solutions supporting steel structure. The final variant was prepared in detail and was carried out static assessment of the individual elements and selected details. The main supporting structure of this variant are two trusses. Diagonals of these trusses are designed linkage system of Macalloy 460. Bridge deck is designed of composite steel a concrete board with crossbars. The footbridge is designed as simple beam with an overhanging end. Length span is 34.8 m, length overhanging ends is 5.8 meters. The total length of the footbridge is 40.6 meters. Width of footbridge is 2.8 meters. Free width is 2 meters. In the cross point with the axis of local road is height of footbridge above ground 4.43 meters. Next to the building Z, there is a footbridge stored on a concrete support, near the building D, the footbridge is stored on a steel frame of support. The footbridge is deposited on elastomeric bearings. The footbridge is being protected from the weather. The sheating of the building is designed by Wictec 60 system. The master's thesis also contains drawing documentation of the proposed solution.
|
Page generated in 0.0784 seconds