• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 144
  • 13
  • 8
  • 8
  • 1
  • Tagged with
  • 177
  • 177
  • 128
  • 112
  • 96
  • 81
  • 78
  • 76
  • 72
  • 69
  • 47
  • 41
  • 40
  • 32
  • 31
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
121

Administrativní budova s provozními sklady - stavebně technologický projekt / Administrative building with operational warehouses - construction technology project

Hirsch, Roman January 2020 (has links)
The focus of this thesis is on the description of realization of administrative building with operational warehouses in Brno. The thesis consists of report on construction and technology, study of the realization of the main technological stages, technical report on site technologies, technical report on wider transportation connections, proposal for the machinery assembly, time schedule, detailed budget, technological guidelines for rein-forced concrete ceiling, control and exam plan for reinforced concrete, report on safety and health protection on construction site, environmental requirements, and in lastly also comparisons of material of contact thermal insulation system, crane proposal, noise study. The thesis consist 15 annexes.
122

Administrativní budova / The administrative object

Kučera, Filip January 2020 (has links)
The final thesis deals with design of new administrative object. The administrative object is located in edge part of Znojmo city. The building is situated in built-up area, which is used for housing and services. The building is accessible as a detached house on a slightly sloping territory. It is a four-storey house with a cellar, terminated by a warm flat roof, which has three-storey and basement. On the above ground floors are located offices and their associated spaces, staff facilities and toilets. On the third floor there is a terrace for employees’ stay in the summer months. On the third floor there is a collective garage with twenty parking spaces too. The individual floors are accessed via the main staircase and elevator. The building is designed as reinforced precast concreate frame and is based on prefabricated reinforced concrete foundation pads. The infill and internal wall are designed from the Porotherm building system.
123

Dům pro seniory ve Velkém Poříčí / Retirement center in Velké Poříčí

Vondrová, Michaela January 2020 (has links)
It is about new-built Retirement center standing alone in the cadaster unit of the town Velké Poříčí. The building has four- floors without basement. It is located in flat terrain near the river in quiet location. The house is built as letter L form. The Retirement center is adapt for disabled people. In the first floor is dining room, doctor´s office, part for employees and technical facilities for house. In the second and third floors are apartments. There are 12 single rooms for one person, 6 single rooms for pair with sleeping in one room and 4 apartments for couple with separated bedroom. In the fourth floor is access to roof terrace. The structural systém of the building is composed of precast concrete frame by Prefa, infill wall from ceramic masonry. Vertical structures are built by prestressed concrete floor slab Spiroll. The building has ventilated facade with mineral wool with facade cladding. The roof is warm flat roof with half intensive green roof.
124

Administrativní budova / Office Building

Světlík, Adam Unknown Date (has links)
The subject of diploma thesis is the elaboration of project documentation of an office building in the northern part of the city of Brno-Medlánky. The office building is designed as a four-storey, without basement. The roofs are flat, and the facade is designed as a glazed curtain wall. The operation of the office building is divided into an administrative part, a commercial part and a cafe. The individual operations do not intersect. Next to the building is a parking lot for customers and employees. The structural system of the building is RC frame with reinforced concrete walls. The internal walls are made of aerated concrete and acoustic lime-sand blocks. The partitions are precast plasterboard. The ceilings are cast-in-place reinforced concrete slabs. The floors are heavy floating with hot water underfloor heating. Most of the flat roofs are green. The drawing part was processed in Revit and AutoCAD.
125

Městský dům - architektura kombinace funkcí / City House – Mixet Use Architecture

Martochová, Jana January 2013 (has links)
The theme of my disseration is an architecture study of multifunctional building which is surrounded by the streets Vranovská, Cejl and Jana Svobody and by the embankment of the river Svitava. Objective of the study was to design a building that would utilized the space of the plot effectively. The result of design is the construction which is characterized for its inner semi-public atrium space with link to the bank of Svitava and street Jana Svobody. It is five-storey house. In the first two stories there are different feature amenities (kindergarden, office building, restaurant, café, media library, gallery and other shops), and senior house. In the third floor and above there are designed flats for living. The part of the living area was also creating of new kind of housing called co-housing. The building has a basement, which is mostly for parking. The construction of the building is from monolithic reinforced concrete frame, horizontal structure consists of beamless slabs. Due to the huge area of the building, the facade is designed from the different kinds of materials: white plaster, light gray sheet metal, anthracite metail mesh and glass fiber.
126

Polyfunkční dům / Multifunctional building

Václ, Jan January 2013 (has links)
The thesis deals with new building of the basement multifunctional building with flat roof in town Klatovy. The building has four aboveground and one underground floor. The whole building offers barrier free access. The entrance to the residental part of the building and the stores are on the east side. The entrance to the wine is situated on the west. There are collective garages on the first basement floor. On the first abovegroung floor are selling space, a wine and technical facilities of the building. On the second floor one flat for disabled people and five flats. Six flats are situated od third floor and four flats on fourth floor. The combined construction is made from support system Porotherm and reinforced concrete. The building is based on grillage base from reinforced concrete. The structure of ceiling is made from reinforced concrete. Two elevators and two reinforced concrete monollithic staircases can be found in the building. The roof over the whole building is single-layer with aggravating gravel. The parking is situated in the undergroung part and on the plot belonging to the building and is designed for physiccally disabled people.
127

Saleziánské středisko / Salesian Centre

Podolanová, Paulína January 2013 (has links)
The master's thesis deals with new construction Salesian center, which contents a leisure center and Church of Mary Help of Christians. The building is designed as two separate units divided with dilatation cleft. One building is reinforced concrete frame fill with masonry POROTHERM Profi 40, the second object was built from POROTHERM Profi 40. The whole building has a basement, the basement is designed as a monolithic reinforced concrete construction. Basement is insulated with extruded polystyrene thickness of 150 mm, upper building is insulated EPS polystyrene 70 mm thick and 100 mm thick ETICS system. The roof on both buildings is flat, smaller building is covered with vegetation roof, concrete frame is covered with a flat roof with asphalt sheets. There are prepared the study, complete design documentation, technical expertise, heat, fire safety solution construction including fire management and technical drawings, basic acoustic calculations of structures, the reverberation time in the nave of the church. Drawings were prepared using AutoCAD 2009 and technical expertise using Heat 2011 and Area 2011.
128

Logistické centrum / Logistic Centre

Hrobař, Pavel January 2013 (has links)
This thesis deals with proposal detached three-storey office building, which consists of the brick section and monolithic reinforced concrete frame. The building is covered with a flat roof. The design focus is on the overall consistency between spatial, structural, static, fire safety, acoustic and thermal technical requirements. Documentation is prepared for the building construction. The graphical part of documentation has been processed in the AUTOCAD software.
129

Polyfunkční dům / Multifunctional House

Šimek, Pavel January 2014 (has links)
Master´s thesis is designed as a complete documentation of a multifunctional house. The multifunctional house is located in the town Nová Paka and functionally designed as a restaurant, garages and 8 flats. Built-up area is 886.95 square meters. The building is covered with a flat roof. The supporting structure is designed prefabricated reinforced concrete frame. Infill walls are made of clay blocks Porotherm. The house is insulated contact system ETICS. The thesis contains a static layout, fire safety, energy saving and safety in use. Drawings were processed with software for design - ArchiCAD.
130

Wellness centrum Jinačovice, stavebně technologická příprava stavby. / Wellness centre Jinačovice, civil technological project.

Rada, Stanislav January 2014 (has links)
The subject of this thesis is also dealt with construction of the second phase of the congress and wellness centre in Jinačovice. The work includes technical report, time and financial plan, project site equipment, technical regulations, inspection and test plans, implementation of technology water impermeable concrete

Page generated in 0.0575 seconds