• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 949
  • 144
  • 58
  • 30
  • 23
  • 15
  • 13
  • 7
  • 5
  • 5
  • 5
  • 5
  • 5
  • 5
  • 5
  • Tagged with
  • 1487
  • 1487
  • 560
  • 229
  • 223
  • 174
  • 159
  • 149
  • 146
  • 144
  • 136
  • 133
  • 132
  • 106
  • 92
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
211

Challenges of the US construction industry in the 21st century

Barquero-Solano, Eduardo 05 1900 (has links)
No description available.
212

Analysis of some problems in the management and cost control of public sector construction projects in Nigeria

Dlakwa, Mohammed Musa January 1990 (has links)
Development is a difficult, painful and long-term enterprise. Not only because of world wide social and economic changes with extensive debts problems, inflation, recession and slow growth, but it is also a matter of finding the technically and economically optimum solution. Over the long-term, the challenge for developing countries is to use their limited resources more efficiently and more equitably through the management of all investment outlays in both the public and private sector. Construction is a major investment sector in Nigeria, attracting an average of over 60% of all capital investment, with over 70% of that 60% sponsored by the public sector. Construction projects handled by the public sector in developing countries are however fraught with problems, from inception through to completion and beyond. This is well known to members of the public sector agencies. Year after year, in good times and bad, development projects suffer from a host of problems: some of design; others of appraisal; and still others of implementation. Most construction projects are characterised by overruns in cost and time, and are sometimes halted altogether before completion. It is therefore necessary to understand the problems underlying the system being practised, to establish a realistic pattern, and to be able to interpret and correct any abnormalities. A lack of understanding of the constraints leads to unrealistic planning, and to later problems that may become insoluble. This research was therefore aimed at identifying these problems, many of which arise from attempts to implement a technology, in this case management technology, in a country other than the country of its origin. In a comparative study between Nigeria and Scotland a large number of public agencies which sponsor construction projects, and the contracting and consulting organisations that work for these agencies, were surveyed using both face-to-face interviews and the postal questionnaire technique. It was found that the major problems in Nigeria are: bureaucratic obstacles affecting timely payment to contractors; ambiguity in consultant/client contract agreements; lack of sufficient qualified professionals in the agencies; and lack of suitable information on which to base initial estimates. Recommendations for improving practice in Nigeria include: administrative reform of construction agencies to reduce the trammels of bureaucracy; a better system of funding by central Government; establishment of a construction cost information agency; and payment of competitive salaries to public sector professional staff. These changes, taking into account the cultural environment of Nigeria, should enable decisions to be made with greater certainty of outcome by all parties involved.
213

The impact of an responses to general duties in occupational safety and health legislation for the construction industry in Hong Kong :

Wong, Yum-Yin. Unknown Date (has links)
Thesis (PhDBusinessandManagement)--University of South Australia, 2004.
214

The effectiveness of project manager /

Chan, Yiu Ming. Unknown Date (has links)
Thesis (MAppSci in Project Management) --University of South Australia, 1992
215

A formal model of construction safety and health risk management /

Hallowell, Matthew R. January 1900 (has links)
Thesis (Ph. D.)--Oregon State University, 2008. / Printout. Includes bibliographical references (leaves 244-253). Also available on the World Wide Web.
216

Evaluation of techniques to reduce respirable dust exposure during asphalt-cutting

Lindquist, Jorgen. January 2007 (has links) (PDF)
Thesis PlanB (M.S.)--University of Wisconsin--Stout, 2007. / Includes bibliographical references.
217

A value management framework for systematic identification and precise representation of client requirements in the briefing process

Yu, Ann Tit-wan. January 2006 (has links)
Thesis (Ph.D.)--Hong Kong Polytechnic University, 2006. / Adviser: Geoffrey Q.P. Shen. Includes bibliographical references.
218

Strategic human resources management in a civil engineering/construction company /

Fung Leung, Pik-wah. January 1991 (has links)
Thesis (M.B.A.)--University of Hong Kong, 1991.
219

The relationship between project funding and construction systems /

Chan, Man-wai. January 1997 (has links)
Thesis (Ph. D.)--University of Hong Kong, 1998. / Includes bibliographical references.
220

The impact of noise controls on the construction industry /

Cham, Ho-leung. January 1993 (has links)
Thesis (M. Sc.)--University of Hong Kong, 1993.

Page generated in 0.1195 seconds