Spelling suggestions: "subject:"5construction industrycontract"" "subject:"5construction subcontracting""
1 |
A study into the labour sub-contracting system practised by the building service contractors in Hong Kong: research report.January 1980 (has links)
by Chan Kin-Chung and Pau Koon-To. / Thesis (M.B.A.)--Chinese University of Hong Kong, 1980. / Bibliography: leaves 73-74.
|
2 |
Development of Previously Disadvantaged Individual subcontractors in Public Private partnershipsMokoala, Joseph Rapula January 2017 (has links)
Thesis is submitted in partial fulfilment for the degree of Master of Science in Building to the Faculty of Engineering and the Built Environment, School of Construction Economics and Management at the University of the Witwatersrand, Johannesburg, 2017 / Public Private Partnerships (PPPs) are an innovative method to deliver infrastructural projects without government having to use public funds for funding capital projects. This innovative method has been adopted worldwide and has yielded the intended results, more especially in European countries. This innovative method provides government with an opportunity to focus on governing and take advantage of skills and funding from the private sector to fund capital-intensive infrastructural projects.
Within the South African context, all PPPs are required to comply with the requisites of the BEE Code of Good Practice for PPPs, which states that 10% of the bid weight will be allocated for compliance in terms of BEE. Over the years, this requirement has been met for the majority of PPP projects that reached financial close and complied with the requirements promulgated by the South African Government as a tool to promote, develop and empower up-and-coming entities.
The aim of this study was to investigate the economic advancement occasioned by PPPs on Previously Disadvantaged Individuals (PDI) subcontracting. This was attained through the use of a case study method as a result of the type of questions and objectives to be met.
The study revealed that PPP projects are compliant with the BEE Code of Good Practice for PPPs. However, the requirements are not specific and clear in the PPP agreement to facilitate better monitoring and evaluation.
Keywords: Previously Disadvantaged Individuals, Subcontracting, Black Economic Empowerment, Public Private Partnerships / XL2018
|
3 |
Coordination problems in fast track commercial constructionWhite, Andrea Dickenson January 1980 (has links)
Thesis (M.S.)--Massachusetts Institute of Technology, Dept. of Civil Engineering, 1980. / MICROFICHE COPY AVAILABLE IN ARCHIVES AND ENGINEERING. / Bibliography: leaf 84. / by Andrea Dickenson White. / M.S.
|
4 |
A study of sub-contracting system and its impact on construction health and safety in Hong Kong陳健旋, Chan, Kin-shuen, Martin. January 1997 (has links)
published_or_final_version / Real Estate and Construction / Master / Master of Science in Construction Project Management
|
Page generated in 0.1387 seconds