Spelling suggestions: "subject:"contractswithin"" "subject:"contracts.in""
1 |
A study of contracting systems in construction industry in Hong KongYan, Chi-ming., 甄子明. January 1985 (has links)
published_or_final_version / Business Administration / Master / Master of Business Administration
|
2 |
Policy, law and private economic rights in China : the doctrine and practice of law on economic contracts /Potter, Pitman B. January 1986 (has links)
Thesis (Ph. D.)--University of Washington, 1986. / Vita. Bibliography: leaves [607]-630.
|
3 |
The relation between the effectiveness of performance assessment scoring system (PASS) and the attitudes of assessorsTsang, Wai-man, Malcolm., 曾煒民. January 2002 (has links)
published_or_final_version / Real Estate and Construction / Master / Master of Science in Construction Project Management
|
4 |
The impact of the interdisciplinary efforts on the receptivity of guarantee maximum price (GMP) projectTing, Wah, 丁華 January 2006 (has links)
published_or_final_version / abstract / Architecture / Master / Master of Science in Interdisciplinary Design and Management
|
5 |
An analysis of Mainland China's export to Hong Kong since 1950Hung, Chiu-ling., 洪昭陵. January 1968 (has links)
published_or_final_version / Economics / Master / Master of Arts
|
6 |
The bidding strategy for Hong Kong Housing Authority maintenance contractsCheung, Tim-Yan, Eric., 張天恩. January 1999 (has links)
published_or_final_version / Real Estate and Construction / Master / Master of Science in Construction Project Management
|
7 |
Competitive tendering in construction: a study of some theoretical bidding models and their application in thelocal construction industryMa, Ho-yin., 馬浩然. January 1987 (has links)
published_or_final_version / Surveying / Master / Master of Science
|
8 |
Bidding strategy: the consultants' perspectiveTang, Wing-hung, 鄧永雄 January 2004 (has links)
published_or_final_version / abstract / toc / Real Estate and Construction / Master / Master of Science in Construction Project Management
|
9 |
Competitive bidding strategy for construction projects.January 1997 (has links)
by Asano Masashi. / Thesis (M.B.A.)--Chinese University of Hong Kong, 1997. / Includes bibliographical references (leaves 97-98). / ABSTRACT --- p.ii / TABLE OFCONTENTS --- p.iii / LIST OF ILLUSTRATIONS --- p.iv / LIST OF TABLES --- p.v / ACKNOWLEDGEMENTS --- p.vi / Chapter / Chapter I. --- INTRODUCTION --- p.1 / Chapter II. --- METHODOLOGY --- p.7 / Chapter III. --- PROFIT MARGIN ANALYSIS --- p.22 / Chapter IV. --- SENSITIVITY ANALYSIS --- p.39 / Chapter V. --- COST ESTIMATE ANALYSIS --- p.48 / Chapter VI. --- INDUSTRY PROFITABILITY ANALYSIS --- p.76 / Chapter VII. --- CONCLUSION --- p.87 / APPENDIXES --- p.89 / BIBLIOGRAPHY --- p.97
|
10 |
Contractor selection systems for design-build projectsPalaneeswaran, Ekambaram. January 2000 (has links)
published_or_final_version / Civil Engineering / Doctoral / Doctor of Philosophy
|
Page generated in 0.0671 seconds