• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2
  • 1
  • Tagged with
  • 4
  • 4
  • 4
  • 4
  • 3
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Die voordeel wat doeltreffende en effektiewe toedeling van koste en produksie inhou vir prysdifferensiasie en die bestuur van trokdienste (Suid-Transvaal) as onderneming

29 September 2015 (has links)
M.A. (Economics) / The aim of this dissertation is to analyze industrial market demand in order to allow the management of Truck Services (Southern-Transvaal) to allocate cost and production efficiently and effectively. The implementation of a market driven capacity will ensure increased profit margins with expanded market shares. This is vital in an extremely competitive transport market ...
2

n Produksiekoste-ontleding van die private wynkelders in Suid-Afrika

Van Dyk, L. A. (Lodewyk August) 12 1900 (has links)
Thesis (MScAgric)--Stellenbosch University, 1969. / ENGLISH ABSTRACT: no abstract available / AFRIKAANSE OPSOMMING: geen opsomming
3

A costing system for the construction industry in Southern Africa

Mushonga, Evans 03 1900 (has links)
This research is based on the problem of allocating indirect overheads to construction projects in order to establish the performance of each project. Traditional costing (TC) systems and Activity-Based Costing (ABC) systems are both used for the allocation of overheads. Both primary and secondary data were used in this research. Primary data was collected by means of two questionnaires, one addressed to construction companies and the other to consultants. The sample of respondents was obtained from the register of contractors and construction industry companies. The researcher sent the links to the Lime survey by email to all respondents. The purpose of the literature review was to identify gaps and justify the need for this research. It considered existing findings by previous researchers. Primary data was therefore required to find answers specific to the problem of overheads allocation in the construction industry. According to the respondents, the use of TC systems produces distorted project cost results while ABC produces more accurate results when used in the construction industry. However, contractors had not adopted the ABC system but used TC systems despite their producing distorted project costs. It is recommended that both TC and ABC systems be used in the construction industry since they complement each other. Contractors may have to adopt the ABC system to enhance their decision-making while continuing to use the TC systems for external reporting. / Management Accounting / M. Com. (Accounting)
4

A costing system for the construction industry in Southern Africa

Mushonga, Evans 03 1900 (has links)
This research is based on the problem of allocating indirect overheads to construction projects in order to establish the performance of each project. Traditional costing (TC) systems and Activity-Based Costing (ABC) systems are both used for the allocation of overheads. Both primary and secondary data were used in this research. Primary data was collected by means of two questionnaires, one addressed to construction companies and the other to consultants. The sample of respondents was obtained from the register of contractors and construction industry companies. The researcher sent the links to the Lime survey by email to all respondents. The purpose of the literature review was to identify gaps and justify the need for this research. It considered existing findings by previous researchers. Primary data was therefore required to find answers specific to the problem of overheads allocation in the construction industry. According to the respondents, the use of TC systems produces distorted project cost results while ABC produces more accurate results when used in the construction industry. However, contractors had not adopted the ABC system but used TC systems despite their producing distorted project costs. It is recommended that both TC and ABC systems be used in the construction industry since they complement each other. Contractors may have to adopt the ABC system to enhance their decision-making while continuing to use the TC systems for external reporting. / Management Accounting / M. Com. (Accounting)

Page generated in 0.089 seconds