• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2
  • 2
  • Tagged with
  • 4
  • 4
  • 4
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Análise integrada do sistema energético urbano: estudo de caso da cidade de Porto Alegre / Integrated analysis of the urban energy system: case study of the city of Porto Alegre

Weber, Natália de Assis Brasil 20 March 2017 (has links)
Nos dias atuais as cidades são o epicentro de uma transformação energética, pois, são elas as principais consumidoras de matéria e energia. Energia fornecida, em sua maioria, através de um sistema convencional, centralizado e ineficiente. Dessa forma, são nos centros urbanos que poderão ser melhor implementadas estratégicas de eficiência energética e conservação de energia. Contudo, antes que os municípios se comprometam com novas iniciativas políticas e investimentos, o primeiro passo é melhorar a compreensão do sistema energético local. Por conseguinte, o objetivo central desta pesquisa é compreender de forma mais integrada o sistema energético de uma cidade através da aplicação de uma metodologia de análise. O município escolhido como estudo de caso é Porto Alegre, por ser uma cidade que se comprometeu em estabelecer mudanças para reduzir as emissões dos gases de efeito estufa, contudo, sem ainda possuir um plano de ação definido. A metodologia do trabalho é qualitativa e quantitativa e foi dividida em três etapas principais: a revisão bibliográfica, o desenvolvimento da metodologia de análise do sistema energético urbano e a aplicação da metodologia proposta. A revisão bibliográfica forneceu a base teórica para o desenvolvimento da metodologia de análise do sistema energético urbano. Esta metodologia prevê o levantamento de dados diversos que se complementam e, dessa forma, possibilitam uma análise integrada e mais aprofundada do sistema energético da cidade. Para tanto, a análise do sistema energético foi dividida em três etapas: caracterização municipal, análise da demanda de energia e levantamento da oferta das principais fontes energéticas locais. Para esta última etapa, visando um exercício concreto de avaliação, especificou-se o potencial de produção de eletricidade através do recurso solar. Os principais resultados da análise do sistema energético de Porto Alegre, entre os anos 2005 e 2014, destacam que o consumo de energia cresceu oito vezes mais que o aumento populacional e menos que a metade do PIB da cidade. Igualmente, no mesmo período, a frota de veículos, assim como o consumo de gasolina, aumentou 13 vezes mais que a população. Entre os setores econômicos analisados o setor transporte foi responsável, em 2014, pelo consumo de 60% da demanda final de energia da cidade. Nesse ano, a fonte de energia mais consumida foi a eletricidade, representando 28,1% do consumo final. Ainda analisando os dados de 2014, verificou-se que o consumo de eletricidade per capita de Porto Alegre pode ser considerado alto, 2,58 MWh/per capita, se igualando ao do Brasil e ao de alguns países desenvolvidos. Em relação ao potencial de produção de eletricidade, a partir da fonte solar, estimou-se um potencial de 2.549 GWh/ano, considerando todo o território da cidade, e de 772 GWh, considerando apenas o território que possuem edificações, aproximadamente 30% da cidade. Isto significa que se todos os consumidores residenciais e comerciais produzissem sua própria energia poderiam ser gerados 2.892 GWh por ano em Porto Alegre. Essa energia seria capaz de suprir 75,8% de toda a demanda de eletricidade da cidade em 2014. Ao final, ressaltou-se a importância de articular o planejamento energético ao planejamento urbano e ao plano de mobilidade urbana, uma vez que o sistema energético urbano está relacionado com os demais. / Nowadays cities at are the epicenter of an energetic transformation. Today, they are the main consumers of matter and energy. Most of that energy supplied through a conventional, centralized and inefficient system. Thus, it is in urban centers that strategic energy efficiency and energy conservation can be better implemented. However, before municipalities commit to new policy initiatives and investments, the first step is to improve understanding of the local energy system. Therefore, the central objective of this research is to understand in a more integrated way the energy system of a city through the application of a methodology of analysis of an urban energy system. The municipality chosen as a case study is Porto Alegre. It was chosen because is a city that has committed itself to establishing changes to reduce emissions of greenhouse gases, however, it does not have a defined plan of action. The methodology of the work is qualitative and quantitative and was divided into three main stages, among them: literature review, development of the methodology of urban energy system analysis, and application of the proposed methodology. The literature review provided the theoretical basis for the development of the methodology of analysis of the urban energy system. This methodology determines the collection of diverse data that complement each other and, thus, enable an integrated and more in-depth analysis of the city\'s energy system. In order to do so, the analysis of the energy system was divided into three stages: municipal characterization, analysis of the energy demand and survey of the supply of the main local energy sources. For this last stage, aiming a specific evaluation exercise, was specified the potential of electricity production through the solar resource.The main results of the analysis of the energy system of Porto Alegre, between 2005 and 2014, highlight that energy consumption grew eight times more than the population increase and less than half of the city\'s GDP. Also, in the same period, the car fleet grew 13 times more than the population. Among the economic sectors analyzed, the transportation sector was responsible for the consumption of 60% of the final energy demand of the city, in 2014. In that year, the most consumed energy source was electricity, representing 28.1% of final consumption. The per capita electricity consumption in Porto Alegre was considered high, 2.58 MWh/per capita, which equals that of Brazil and some developed countries. Regarding the potential for electricity production, it was determined a potential of 2,549 GWh/year (considering the entire territory of the city), and 772 GWh (considering only the territory that have buildings, approximately 30% of the city). This means that if all residential and commercial consumers produced their own energy could generate 2,892 GWh per year in Porto Alegre. This energy would be able to supply 75.8% of all city electricity demand. In the end, it was emphasized the importance of unifying the energy planning to the urban planning and to the urban mobility plan, since the urban energy system is related to both.
2

Decentralized Sustainable Energy Planning For Tumkur District, India

Hiremath, Rahul B 01 1900 (has links)
The energy-planning involves finding a set of sources and conversion devices so as to meet the energy requirements/demands of all the activities in an optimal manner. This could occur at centralized or decentralized level. The current pattern of commercial energy oriented development, particularly focused on fossil fuels and centralized electricity, has resulted in inequities, external debt and environmental degradation. The current status is largely a result of adoption of centralized energy planning (CEP), which ignores the energy needs of rural areas and the poor and has further contributed to environmental degradation due to fossil fuel consumption and forest degradation. CEP does not pay attention to the variations in socio-economic and ecological factors of a region, which influence success of any intervention. Decentralized energy planning (DEP) provides an opportunity to address the energy needs of poor as well as promote efficient utilization of resources. The DEP mechanism takes into account various available resources and demands in a region. DEP, in the Indian context, could be at several scales namely district, block, panchayats (cluster of villages) and village level. Energy planning at the village level is the lowest level of the application of decentralized planning principle. A village constitutes a cluster of households with distinct geographic boundary consisting of settlement, agricultural land, water bodies and any other land category, in most parts of India. Further, the village level plans must be prepared within the limits set by a panchayat, a block or a district level plans, for the sum total of various village plans must correspond to a panchayat (local council), block (or taluka), or district level plan. A panchayat is the lowest administrative unit consisting of a cluster of villages and an elected body to administer developmental activities. A block (or taluka) consists of a cluster of panchayats and a district consists of a cluster of blocks. The main hypothesis for this study is that centralized energy planning has lead to excessive dependence on fossil fuels and import of petroleum, leading to concerns on environment and energy security and finally neglect of the energy needs of the rural communities and poor in particular. DEP could meet the local energy needs particularly in rural areas, protect environment and promote a self reliant and sustainable energy path. In this study, methodology for adopting energy planning from grassroot or village to district level is explored. The study adopts and compares the DEP approach of moving from village (Ungra), to panchayat (Yedavani), to block (Kunigal) and finally to district (Tumkur) level. Aims and objectives of research . • To review energy planning approaches adopted in India . • To evaluate models and methods for DEP at different scales; Village, Panchayat, District and State levels . • To develop a sustainable and decentralized energy planning approach . • To analyze the sustainable decentralized planning approach using multiple objective goal programming model and develop sustainable energy mix for meeting energy needs at village, panchayat, block and district level . • To assess the implications of sustainable and decentralized energy planning from the context of socio-economic and environmental concerns. The central theme of the research work is to prepare an optimized area-based decentralized energy plan to meet the energy needs, incorporating all potential alternate energy sources and end-use devices at least-cost to the economy and environment. One of the environmental goals addressed is to minimize or avoid CO2 emissions to address climate change. Study area selected for DEP is Tumkur district of Karnataka state, India and the DEP is carried out for the year 2005 and 2020. Advanced operation research technique, goal programming, is used to solve the large and complicated energy system problem having multiple conflicting goals.
3

Análise integrada do sistema energético urbano: estudo de caso da cidade de Porto Alegre / Integrated analysis of the urban energy system: case study of the city of Porto Alegre

Natália de Assis Brasil Weber 20 March 2017 (has links)
Nos dias atuais as cidades são o epicentro de uma transformação energética, pois, são elas as principais consumidoras de matéria e energia. Energia fornecida, em sua maioria, através de um sistema convencional, centralizado e ineficiente. Dessa forma, são nos centros urbanos que poderão ser melhor implementadas estratégicas de eficiência energética e conservação de energia. Contudo, antes que os municípios se comprometam com novas iniciativas políticas e investimentos, o primeiro passo é melhorar a compreensão do sistema energético local. Por conseguinte, o objetivo central desta pesquisa é compreender de forma mais integrada o sistema energético de uma cidade através da aplicação de uma metodologia de análise. O município escolhido como estudo de caso é Porto Alegre, por ser uma cidade que se comprometeu em estabelecer mudanças para reduzir as emissões dos gases de efeito estufa, contudo, sem ainda possuir um plano de ação definido. A metodologia do trabalho é qualitativa e quantitativa e foi dividida em três etapas principais: a revisão bibliográfica, o desenvolvimento da metodologia de análise do sistema energético urbano e a aplicação da metodologia proposta. A revisão bibliográfica forneceu a base teórica para o desenvolvimento da metodologia de análise do sistema energético urbano. Esta metodologia prevê o levantamento de dados diversos que se complementam e, dessa forma, possibilitam uma análise integrada e mais aprofundada do sistema energético da cidade. Para tanto, a análise do sistema energético foi dividida em três etapas: caracterização municipal, análise da demanda de energia e levantamento da oferta das principais fontes energéticas locais. Para esta última etapa, visando um exercício concreto de avaliação, especificou-se o potencial de produção de eletricidade através do recurso solar. Os principais resultados da análise do sistema energético de Porto Alegre, entre os anos 2005 e 2014, destacam que o consumo de energia cresceu oito vezes mais que o aumento populacional e menos que a metade do PIB da cidade. Igualmente, no mesmo período, a frota de veículos, assim como o consumo de gasolina, aumentou 13 vezes mais que a população. Entre os setores econômicos analisados o setor transporte foi responsável, em 2014, pelo consumo de 60% da demanda final de energia da cidade. Nesse ano, a fonte de energia mais consumida foi a eletricidade, representando 28,1% do consumo final. Ainda analisando os dados de 2014, verificou-se que o consumo de eletricidade per capita de Porto Alegre pode ser considerado alto, 2,58 MWh/per capita, se igualando ao do Brasil e ao de alguns países desenvolvidos. Em relação ao potencial de produção de eletricidade, a partir da fonte solar, estimou-se um potencial de 2.549 GWh/ano, considerando todo o território da cidade, e de 772 GWh, considerando apenas o território que possuem edificações, aproximadamente 30% da cidade. Isto significa que se todos os consumidores residenciais e comerciais produzissem sua própria energia poderiam ser gerados 2.892 GWh por ano em Porto Alegre. Essa energia seria capaz de suprir 75,8% de toda a demanda de eletricidade da cidade em 2014. Ao final, ressaltou-se a importância de articular o planejamento energético ao planejamento urbano e ao plano de mobilidade urbana, uma vez que o sistema energético urbano está relacionado com os demais. / Nowadays cities at are the epicenter of an energetic transformation. Today, they are the main consumers of matter and energy. Most of that energy supplied through a conventional, centralized and inefficient system. Thus, it is in urban centers that strategic energy efficiency and energy conservation can be better implemented. However, before municipalities commit to new policy initiatives and investments, the first step is to improve understanding of the local energy system. Therefore, the central objective of this research is to understand in a more integrated way the energy system of a city through the application of a methodology of analysis of an urban energy system. The municipality chosen as a case study is Porto Alegre. It was chosen because is a city that has committed itself to establishing changes to reduce emissions of greenhouse gases, however, it does not have a defined plan of action. The methodology of the work is qualitative and quantitative and was divided into three main stages, among them: literature review, development of the methodology of urban energy system analysis, and application of the proposed methodology. The literature review provided the theoretical basis for the development of the methodology of analysis of the urban energy system. This methodology determines the collection of diverse data that complement each other and, thus, enable an integrated and more in-depth analysis of the city\'s energy system. In order to do so, the analysis of the energy system was divided into three stages: municipal characterization, analysis of the energy demand and survey of the supply of the main local energy sources. For this last stage, aiming a specific evaluation exercise, was specified the potential of electricity production through the solar resource.The main results of the analysis of the energy system of Porto Alegre, between 2005 and 2014, highlight that energy consumption grew eight times more than the population increase and less than half of the city\'s GDP. Also, in the same period, the car fleet grew 13 times more than the population. Among the economic sectors analyzed, the transportation sector was responsible for the consumption of 60% of the final energy demand of the city, in 2014. In that year, the most consumed energy source was electricity, representing 28.1% of final consumption. The per capita electricity consumption in Porto Alegre was considered high, 2.58 MWh/per capita, which equals that of Brazil and some developed countries. Regarding the potential for electricity production, it was determined a potential of 2,549 GWh/year (considering the entire territory of the city), and 772 GWh (considering only the territory that have buildings, approximately 30% of the city). This means that if all residential and commercial consumers produced their own energy could generate 2,892 GWh per year in Porto Alegre. This energy would be able to supply 75.8% of all city electricity demand. In the end, it was emphasized the importance of unifying the energy planning to the urban planning and to the urban mobility plan, since the urban energy system is related to both.
4

Distributed Bioenergy Systems For Expanding Rural Electricity Access In Tumkur District, India : A Feasibility Assessment Using GIS, Heuristics And Simulation Models

Deepak, P January 2011 (has links) (PDF)
Energy is an important input for various activities that provide impetus to economic, human and social development of any country. Among all the energy carriers, electricity is the most important and sought after energy carrier for its quality, versatility and ability to perform various technology driven end-use activities. Therefore access to electricity is considered as the single most important indicator determining the energy poverty levels prevailing in a country. Demand for electricity has increased significantly, especially in the developing countries, in recent years due to growth in population and intensification of economic activities. Therefore, providing quality and reliable electricity supply at low-cost has become one of the most pressing challenges facing the developing world. Although sufficient efforts have gone into addressing this issue, little progress has been made in finding a satisfactory solution in alleviating this problem. Currently, electricity supply is mostly dependent on centralized large-scale power generation. These centralized systems are strongly supply focused, fossil-fuel intensive, capital intensive, and rely on large-distance transmission and distribution systems. This results in electricity cost becoming unaffordable to the majority poor which comprises more than 70% of the total population in developing countries like India and the benefits of quality energy remaining with the rich, giving rise to inequitable distribution of energy. Continuous exploitation of fossil fuels has also contributed to local and global pollution. Therefore it is necessary to explore alternate means of providing energy access such that the energy carriers are clean, easy to use, environmentally benign and affordable to the majority of the rural poor. India is at a critical juncture of passing through the path of development. India is also in a unique position that its vast majority of rural population is energy poor which is disconnected from the electricity grid. In this context, the proposed research is an attempt towards developing a greater understanding on the issue of rural energy access and providing a possible solution for addressing this gap. This has been proposed to be achieved by adopting a decentralized energy planning approach and distributed energy systems mostly based on renewable energy sources. This is expected to reduce dependence on imported energy, promote self-reliance, provide economically viable energy services for rural applications and be environmentally safe. The focus is limited to biomass energy route which has many advantages; it is a geographically equitably distributed resource, geographical advantage of having potential to setup energy systems at any location where vegetation is present and not seasonal like other renewable energy technologies. A mathematical model-based approach is developed to assess the feasibility of such a proposal. Models are developed for performing biomass resource assessment, estimating end-use-wise hourly demand for electricity, performing capacity and location planning and assessing economic feasibility. This methodological framework was validated through a case study developed for the district of Tumkur in the state of Karnataka (a state in southern region of India). The literature survey was conducted exhaustively covering the whole span of supplyside and demand-side management of electricity systems, and grid-connected and stand-alone power generation systems, their technical, economic and environmental feasibilities. Literature pertinent to GIS applications in biomass assessment, facility location planning and scheduling models were also reviewed to discern how optimal capacity, location and economic dispatch strategy was formulated. Through the literature survey it was understood that there were very few attempts to integrate both demand-side management and supply-side management aspects in the rural energy context. GIS based mathematical models were sparsely used in rural energy planning and decision making. The current research is an attempt to bridge these gaps. The focus in this study is on effectively utilizing the locally available biomass resource. Assessment of Biomass Potential for Power Generation As a first step, the supply option was studied at village level by overlaying LULC (land use land cover) and village boundary GIS maps of Tumkur district. The result was fortified by the NDVI results from remote sensing images of land use pattern in Tumkur district. A detailed village-level assessment of wasteland potential was made for the entire district. The result showed which shows that in Tumkur district, roughly 17.3% of total geographical land was under exploitable wasteland. Using secondary data and literature, biomass potential indices were prepared for different wasteland types to determine the total biomass potential for power generation. The results based on the GIS data the assessment shows that Tumkur has roughly 17.3% of exploitable wasteland. A complete village-level annual power generation potential was assessed considering both energy plantations from wasteland, existing degraded forests and crop residues. Assessment of end-use-wise hourly Demand for Electricity at Village Level Household survey was conducted for 170 sample households randomly chosen from 15 villages, again randomly selected to represent different socio-economic categories. Using statistical tools like k-means clustering, one-way ANOVA and Tukey’s HSD test, first the households were classified into three economic categories to study the distribution of the households in each sample village. Later based on the number of households of each type in a village, the villages were further classified into five groups based on their socio-economic status. This was done to select the right representative per-household power demand for a village of any particular socioeconomic category. The representative per household power demand in each economic category along with secondary data helped in deriving the electricity daily load profiles for all the villages. Representative demand profiles were generated for different seasons across different sectors namely domestic, agriculture and industry sectors at the end-use level comprising of activities like home lighting, appliances, irrigation pump sets operation and small industry operations. Mathematical Modeling for Optimal Siting of Biomass Energy Systems Since the power has to be generated through biomass route, biomass may have to be transported over a large geographical area which requires efficient design of logistic systems. Apart from that, a major component of cost of biomass power is the cost of transportation of biomass from source to the power plant. Therefore it is important to determine the optimal siting of biomass energy systems to minimize the cost of transportation. Since these optimal locations are based on minimizing Euclidian distance, installing the power generation systems at these locations would also minimize total cost of local transmission and distribution. In order to locate the biomass energy system, K-medoid clustering algorithm was used to determine the optimal number of clusters of villages to minimize the Euclidean distance between the medoid of the cluster and the villages within the cluster, and minimize the total installed capacity to meet the cluster demand. The clustering algorithm was modified in such a way that the total capital cost of the power generation system installation was minimized. Since the total project cost not only depended on capital cost alone, but also on biomass transportation and power transmission costs, these costs were also included in the analysis. It was proposed to locate the energy systems at the medoids of the clusters. Optimal Capacity Planning Installing biomass power systems requires large investments. It is therefore necessary to reduce the peak demand to bring down the installed capacity required. This was achieved by developing heuristics to arrive at an optimal scheduling scheme of the end-use activities that would minimize the peak demand. The heuristics procedure was demonstrated on five representative villages, each from different economic category. The optimal demand profile was used as input in HOMER micro-energy system simulation software to perform a techno-economic analysis. The simulation facilitated a thorough economic feasibility study of the system. This included a complete analysis of the cash inflows and outflows, capital cost of the system, operation and maintenance cost, cost of fuel and estimation of total GHG emissions. There are many limitations in planning at village-scale. The results indicated that capacity planning done at the village level was prone to over-estimation of installed capacity of the system increasing the investment requirement, under utilization of the capacity and suffered from supply scarcity of biomass. This emphasized the need for looking at a bigger conglomerate of villages in other words cluster of villages. In the next step, the optimal capacity planning was performed for one of the clusters formed using the K-medoid clustering algorithm with the power generation system located at the medoid. For demonstrating the practical feasibility of extending the methodology to cluster level, a cluster with maximum number of villages was chosen from the optimal cluster set in the k-medoid algorithm output. The planning was conducted according to the socioconomic category of the villages in the cluster. Economic implications of Stand-alone (SA) vs Grid-connected (GC) Mode of Operation Other important question that was answered in this analysis was a comparison of GC systems with SA systems. Since extension of grid to a village that is not electrified involved drawing high voltage transmission lines from the nearest grid point, installation of distribution transformers and low transmission lines within the village for distribution. Since these involve high costs it was necessary to study whether or not it is feasible to extend the grid or install a stand-alone system. This question was answered by the breakeven distance for which grid extension becomes more economical than a SA system. For each village breakeven distance varied with the total installed capacity and the operational costs. This helped to compare the GC systems vis-à-vis SA systems from the point of view of economic feasibility. Summary It is necessary that planning and strategies be rational and reasonable for effectively assuaging the rural electrification imbroglio. The current study has highlighted the importance of integrating both demand-side-management and supply-sidemanagement of energy systems in the context of planning for power generation and distribution in rural areas. The key findings in the current study are: • The study showed the feasibility of biomass power systems in meeting the rural electricity needs. • Biomass assessment results showed that, if the power demand could be brought down by replacing the existing appliances with efficient ones (ex. compact fluorescent lamps and improved irrigation pump set valves), Tumkur district has enough biomass potential to meet both the current as well as increased future demands for electricity. • The optimal number of clusters minimizing total capital cost of biomass energy systems, transportation cost of biomass and distribution cost of power, was 96 for Tumkur district. For Kunigal block, the optimal number of clusters was 37 and 32 for supply and demand scenarios 1(BAU -Business As Usual) and 2 (with 10% increase in cropland and 20% increase in demand). • The optimal capacity planning emphasized the importance of clustering of villages for minimizing the total installed capacity. The result also showed that the breakeven distance was the determining factor about the choice of GC vs SA systems. The main contributions of this thesis are: i. Hourly demand pattern was studied to estimate the aggregate demand for electricity at village level for different sectors across various seasons. ii. Village-wise biomass resources potential for power generation was assessed iii. Optimal locations for siting biomass energy systems were identified using k-medoid clustering algorithm iv. An optimal scheduling of end-use activities was planned using heuristics method to minimize the installed capacity v. Optimal location, scheduling plan of end-use activities and optimal capacity were determined for individual villages as well as village clusters vi. The economic implications of grid extension vis-à-vis stand-alone mode of operation of the installed biomass energy systems were studied The generalized, multipronged approach presented in this thesis to effectively integrate both demand-side management and supply-side management in rural energy planning can be implemented for any rural region irrespective of the location. The results emphasized that for efficient demand-side and supply-side management, it is important to plan for clusters of villages than at the individual village level. The results reported in this thesis will help the policy and strategy makers, and governments to achieve rural electrification to a satisfactory extent to ensure continuous, uninterrupted and reliable power supply by determining the clustering strategy, optimal cluster size, optimal scale and siting of decentralized biomass power generation systems.

Page generated in 0.0877 seconds