• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2
  • Tagged with
  • 3
  • 3
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Laboratory Testing of Precast Bridge Beck Panel Transverse Connections for Use in Accelerated Bridge Construction

Porter, Scott D. 01 May 2009 (has links)
Precast concrete bridge deck panels have been used for decades to accelerate bridge construction. Cracking of the transverse connection between panels is a common problem that can damage deck overlays and cause connection leaking leading to corrosion of lower bridge elements. To better understand the behavior of bridge deck transverse female-to-female connections, shear and moment lab testing were performed at Utah State University for the Utah Department of Transportation. Two existing UDOT connections were tested, a welded stud connection and a post tensioned connection. A variation of the welded connection using rebar was also tested. In addition, two new curved bolt connections were tested as a new method of post tensioning a connection. The manner of connection cracking and associated cracking loads were recorded along with the ultimate connection capacities. The connections were also tested in a low cycle, high amplitude cyclical shear test. Lab testing showed that the welded stud connection had the lowest moment capacity. It also showed that the welded rebar connection had significantly higher strength than the welded stud connection with higher cracking and ultimate loads. Curved bolts were also shown to be a good way to post tension a connection with similar moment capacities as the post tensioned connection. Longer curved bolts were found to perform better than shorter curved bolts.
2

Documentation of the rapid replacement of four GDOT bridge decks

Umphrey, Joshua Matthew, Ramey, George E. January 2006 (has links) (PDF)
Thesis(M.S.)--Auburn University, 2006. / Abstract. Vita. Includes bibliographic references (p.200).
3

Ultra-High Performance Concrete Bridge Applications in Ohio

Barnard, Elné 23 May 2022 (has links)
No description available.

Page generated in 0.0531 seconds