Spelling suggestions: "subject:"1degree off adjustment"" "subject:"1degree oof adjustment""
1 |
Estudo do impacto da incorporação de usinas hidrelétricas a fio d’água no sistema interligado nacionalGomes, Rafael de Oliveira 02 August 2012 (has links)
Submitted by Renata Lopes (renatasil82@gmail.com) on 2017-04-20T19:23:49Z
No. of bitstreams: 1
rafaeldeoliveiragomes.pdf: 1378975 bytes, checksum: acfbbb683eac1c9cda51ec90f2c5c8a6 (MD5) / Approved for entry into archive by Adriana Oliveira (adriana.oliveira@ufjf.edu.br) on 2017-04-24T16:51:01Z (GMT) No. of bitstreams: 1
rafaeldeoliveiragomes.pdf: 1378975 bytes, checksum: acfbbb683eac1c9cda51ec90f2c5c8a6 (MD5) / Made available in DSpace on 2017-04-24T16:51:01Z (GMT). No. of bitstreams: 1
rafaeldeoliveiragomes.pdf: 1378975 bytes, checksum: acfbbb683eac1c9cda51ec90f2c5c8a6 (MD5)
Previous issue date: 2012-08-02 / O Plano Decenal de Expansão de Energia (EPE, 2010) apresenta a expansão da oferta
(ainda não contratada) 100% atrelada à geração de energia baseada em fontes
renováveis: hidrelétricas, eólicas e termelétricas com queima de biomassa. O incentivo a
uma maior participação de fontes renováveis na matriz energética é uma atitude
louvável do governo brasileiro que, de alguma forma, tenta minimizar a expansão
contratada nos leilões de energia nova até o ano de 2008, fortemente baseada em
termelétricas a óleo combustível. A maioria das hidrelétricas viáveis para o período está
localizada na Região Amazônica e devido a restrições socioambientais não há previsão
de implantação de usinas com reservatórios de regularização das vazões afluentes.
A maior participação de hidrelétricas de grande porte sem reservatórios implica em
consequências diversas para a operação do Sistema Interligado Nacional (SIN), tais
como: menor manobra para controle de cheias; maior exigência dos reservatórios; e
maior despacho termelétrico para atender às exigências sazonais da carga. Além disso,
impactos comerciais podem ser vislumbrados, como maior volatilidade do Preço de
Liquidação de Diferenças, aumento dos riscos hidrológicos de usinas participantes do
MRE e maior despacho de usinas termelétricas por ordem de mérito econômico.
O presente trabalho analisa problemas como a diminuição da capacidade de
regularização plurianual dos reservatórios e a necessidade do aumento da participação
térmica a fim de conservar a segurança energética do SIN. Utiliza o modelo NEWAVE
para examinar diversos cenários de vazões afluentes, baseadas em séries hidrológicas
históricas e sintéticas, analisando panoramas futuros e desdobramentos do mercado de
energia. Ademais, realiza estudos quanto à opção da expansão da oferta de energia por
grandes hidrelétricas a fio d’água em detrimento de usinas com reservatórios de
regularização, para isso realiza simulações modificando as características físicas da
UHE Jirau de forma a comparar os resultados entre as alternativas. / The Ten-year Plan for Expansion of Energy (EPE, 2010) presents the expansion of offer
(not auctioned) 100% tied to power generation based on renewable sources: hydro, wind
and thermal power plants with biomass burning. Encouraging greater participation in
renewable energy sources is a commendable attitude of the Brazilian government that
somehow tries to minimize the expansion contracted in the auctions of new energy by
the year 2008, based heavily on fuel oil fired plants. Most hydroelectric ventures
considered viable for the period is located in the Amazon region and due to social and
environmental restrictions there is no provision for deployment of power plants with
reservoirs of regularization of inflows.
The high participation of large hydroelectric without reservoirs implies in several
consequences for the operation of the National Interconnected System (SIN), such as
reduced availability of maneuvers for flood control; a higher demand of the existing
reservoirs; and order more frequently thermoelectric power plants to achieve the
seasonal demands of the load. Moreover, trade impacts can be envisioned, such as
increased volatility of the Settlement Price Differences, increased risks of hydrological
plants participating in the MRE and higher order of power plants in order of economic
merit.
This paper analyzes problems such as decreased ability to multi-annual adjustment of
the reservoirs and the need for increased participation in order to conserve thermal
energy security of the SIN. Uses NEWAVE model to examine different scenarios of
inflows based on historical hydrological series and synthetic overviews analyzing future
market developments and energy. Moreover, studies carried out on the option of
expanding the supply of energy by large dams to trickle over plants with reservoirs of
regularization, for it carries out simulations by modifying the physical characteristics of
UHE Jirau in order to compare the results among the alternatives.
|
Page generated in 0.0814 seconds