Spelling suggestions: "subject:"devevelopment anda planning"" "subject:"devevelopment ando planning""
61 |
L'identità culturale e lo sviluppo socio economico della regione Serrana nello stato di Espìrito Santo in Brasile. Una strategia per il governo della trasformazione territoriale / Cultural Identity and Socio-Economic Development of theSerrana Region in the State of Espírito Santo, Brazil. A New Strategy for the Governance of The Region's Land Use TransformationRABELLO LYRA, ANA PAULA 13 July 2007 (has links)
Nell'ultimo decennio il processo di sviluppo insediativo ha avuto un impatto rilevante sul territorio della regione di montagna dello Stato di Espírito Santo. Di conseguenza occorre una pressione sull'economia, sull'ambiente e sull'identità culturale della regione. Il contributo di questa ricerca è il suggerimento di uno strumento per il governo della trasformazione del territorio serrano all'associazione per lo sviluppo sostenibile della regione di montagna dello Espírito Santo; un approccio orientato ad utilizzare meglio le risorse del paesaggio culturale della regione per apportare migliorie alla qualità complessiva del territorio Serrano. / The impact of the new rural space developments on spatial quality in the Espírito Santo State mountain region has been intensified in the past decade. It brings pressure to bear on the economy, the environment and the cultural identity with consequences to the health and safety of the region. This research contribution is the suggestion of an additional action programme to the 'Espírito Santo mountain region sustainable development association' ADEMES. A development-oriented approach addressed to make a better use of the Serrana Region's cultural landscape to improve the quality of its changing rural space.
|
62 |
Curriculum construction in the Indonesian pesantren: a comparative case study of curriculum development in two pesantrens in South KalimantanRaihani January 2001 (has links) (PDF)
This study aims at investigating similarities and differences in the curriculum development processes in two selected pesantrens in South Kalimantan, Indonesia. The research explores the involvement of key stakeholders in the curriculum development processes and the curriculum itself. The study is a qualitative approach, which, in collecting the data, employs in-depth interviews with the kyais (leaders), ustadzs (teachers), and santris (students); observation on the pesantrens’ daily life and classroom activities; and relevant documentation. The findings suggest that there are similarities and differences in both pesantrens in the curriculum development processes. Both pesantrens can be classified as Site-Based Managed Schools in which all interactions of the members are permeated with some values. However, Pesantren A has a rather collaborative and goal-oriented curriculum development process, while Pesantren B tended to conduct a single-handed and content-oriented one. The curriculum of Pesantren A is a subject-based curriculum accommodating both religious and non-religious disciplines in relatively the same proportion, whereas that of Pesantren B is a kitab (book)-based curriculum accommodating largely religious disciplines. Overall, it was found that both pesantrens need to conduct more collaborative and systematic curriculum processes. To do so, since ustadzs have a significant influence on the curriculum, there is a need for well-directed and organised professional development programs focusing on pedagogical issues. There is also a need to set some indicators for curriculum evaluation based on the context of Islamic education and immediate societal demands.
|
63 |
San Diego growth wars : a critique of public participation in California land use politics /Troutman, Philip Parke. January 2004 (has links)
Thesis (Ph. D.)--University of California, San Diego, 2004. / Vita. Includes bibliographical references (leaves 529-554).
|
64 |
An assessment of community participation in Non-Governmental Organizations (NGOs) development projects in Zimbabwe: the case of Bulilima and Mangwe Districts, Matabeleland SouthMoyo, Phoebe Michelle Zibusiso Sandi January 2012 (has links)
Since the mid 1970s there has been an increasing effort to adopt community participation as a necessary instrument for people driven development. NGOs and governments have come to use this participatory approach not only to empower local people, but also to give them a platform to plan and implement their own development projects. However in Zimbabwe, the government has failed to fund most projects and it has created a gap for NGOs to provide most, if not all services in rural communities. NGOs have been seen as better institutions to facilitate development projects and to engage local people to actively participate in development issues. Community participation is a central component in development projects as the projects respond to the people’s needs and that local people are in full control and ownership of these projects. This study is an assessment of community participation in NGO development projects in Zimbabwe. The study investigates the extent of community participation in development projects and it is guided by the Participatory Development (PD) theory. Research findings reveal that community participation is minimal in development projects of Bulilima and Mangwe districts in Zimbabwe. Local people are just passive participants of the development projects who are told what to do. The local people’s contributions and influences are sidelined in the planning and decision-making processes; instead these are made by the rural elite who plan and make decisions on behalf of the local people. It is the view of this study that the purpose of community participation is to create opportunities for local people to participate in planning, decision making, implementation, allocation and distribution of resources. The development projects should be responsive to the people’s needs. Similarly, participatory development just like community participation is a process whereby communities are given the opportunity to determine their future in terms of their needs and resources. In this regard, it is relevant that rural communities actively participate in planning, decision making, implementation, monitoring and evaluation of development projects. By so doing, the projects become not only successful but also sustainable.
|
65 |
An assessment of the challenges and implications of community participation in the formulation of Lesotho Land Bill 2009Modia, Teboho Edward January 2011 (has links)
This study focused on community participation in relation to policy formulation in Lesotho. It paid particular attention to whether the Lesotho community participated in the formulation of the Lesotho Land Bill 2009. Literature related to the concept of participatory development, community participation and policy formulation was reviewed. From the literature, it was clear that the attainment of effective community participation in policy formulation is not something that can take place overnight and this makes community participation a crucial aspect of any development project. The study used the qualitative approach to provide more information and detailed examination of community participation in the formulation of the Lesotho Land Bill 2009. This approach adopted the case study design. The data was collected using focus groups, interview schedule and document analysis. The study found that the government did not consult widely on the Bill before it was enacted into an Act of parliament. Therefore, it recommends that the government of Lesotho should involve all relevant stakeholders to participate in policy formulation. This will help to establish a link between the government and civil society stakeholders at local levels, for participatory policy-making to be effective.
|
66 |
Mega-project planning and economic welfare : a case study of British Columbia's North East Coal ProjectKnight, Nancy January 1990 (has links)
This research investigates the characteristics of natural resource mega-project planning processes. The implications of staple theory and selected characteristics of natural resource mega-projects are used to construct eleven characteristics of such planning processes. Staple theory suggests that optimistic expectations will be a fundamental characteristic of resource development planning in Canada, and that the state's role will be to facilitate, rather than evaluate, staple production. The size, complexity, visibility, and meaning of mega-projects may create momentum around them that weakens rational analysis and stampedes the planning process. Overall, the planning process may focus on narrow, technical issues concerned with constraints facing the mega-project. Alternatives may not be considered, overly optimistic expectations may not be checked, and risk and uncertainty may be inadequately addressed.
These proposed planning process characteristics are investigated in a case study of British Columbia's North East Coal Project (NECP). The institutional structure of the planning and implementing organizations are investigated, and the major planning issues are identified. The expectations generated within the planning process regarding the mega-project's contribution to regional economic growth and development, and its economic viability are reviewed, and then evaluated by comparing them to information available at the time from sources within the planning process and from sources outside the planning process, and to actual outcomes.
The case study findings support many of the eleven proposed characteristics of natural resource mega-project planning processes. The NECP's public planning process focused on identifying and overcoming constraints that would prevent the mega-project proceeding, and on minimizing the costs of the public sector's infrastructure responsibilities in the mega-project. The terms of reference for the various Sub-Committees requested analyses of constraints in most cases. The absence of a Regional Development Sub-Committee in the organization of the planning task force suggests that longer term planning issues were not perceived to be as important as the infrastructure issues. Sixty percent of the official public planning budget was allocated to transportation and townsite studies. The mandate, structure and operations of the government's implementing organization focused on controlling project costs. Finally, the benefit-cost analysis of the mega-project did not consider any alternatives to the NECP.
The expectations regarding the NECP's contribution to regional economic growth and development were overly optimistic given the information available at the time, and far exceed the actual outcomes to date. The NECP stabilized the South Peace region during the recession of the early 1980s, and produced some growth in employment, population, and income levels. Also, education levels increased and some entrepreneurial development occurred. However, the mega-project did not alleviate the unemployment situation in the region, did not improve the distribution of income, and it did not diversify the regional economic structure. Despite the early planning emphasis given to the opportunities that the NECP could provide to members of regional target groups such as Natives and women, few individuals from these groups obtained mining employment. In 1986, most of the direct economic benefits associated with the NECP, such as the new employment opportunities, high incomes, and training opportunities, had been captured by in-migrants to the region.
The expectations regarding the NECP's economic viability were also overly optimistic given information available at the time. The possibility of capital cost overruns were not considered despite ample indication that they were highly probable. Continuing high prices were assumed despite historical evidence that periods of high prices had been consistently followed by sustained periods of low prices, and expert advice that structural forces would contribute to a continual decline in the Japanese demand for metallurgical coal. The pre-project analysis projected that the NECP's net present value would be $464 million (1980$C), but the ex post analysis suggests that the NECP will generate $955 million (1980$C) in net economic losses for the Canadian economy.
The overly optimistic expectations regarding the NECP's economic viability were formed early in the planning process and were based on a period of enormous increases in metallurgical coal prices. As market conditions changed, the group within the planning task force responsible for the NECP's economic evaluation lowered their expectations, but their concerns were apparently insufficient to counter the momentum that had been established around the NECP. This momentum was reinforced by the meaning attached to the NECP, which was portrayed as a fundamental component of BC's economic development strategy.
Risk and uncertainty were inadequately addressed within the planning process and within the technical analyses of this mega-project's regional economic impacts and economic viability. No sensitivity analyses were completed in the analysis of the NECP's regional economic impacts. The sensitivity analyses in the pre-project benefit-cost analysis all considered positive adjustments to the base case scenario, save one. Problems of geological uncertainty, and the lack of experience of the project proponents in coal mining were ignored.
Mega-project planning processes must be carefully designed to counter the characteristics suggested by this research. At a minimum, a full public review of the mega-project should be conducted before the decision to proceed is taken. Consideration should be given to developing a formal, required mega-project planning process based on the two-tiered structure. The first tier would include a policy assessment addressing broad questions such as alternative regional development strategies. If the outcome of the first tier was a decision to proceed with a mega-project, the second tier would address mega-project planning and regulatory issues such as infrastructure options and impact management strategies. / Applied Science, Faculty of / Community and Regional Planning (SCARP), School of / Graduate
|
67 |
Zvýšení efektivity personální práce společnosti Karlova pekárna s.r.o. / Increasing of Effectiveness of Personal Management in Karlova Pekárna Ltd. CompanyBerková, Aneta January 2011 (has links)
This diploma thesis provides a detailed analysis of human resources in the Karlova pekárna Ltd. company with the aim of decreasing the employee fluctuation. The analytical part contains information concerning the external and internal company environment and results of a sociological survey conducted among the company employees. The data obtained from the survey serve as a basis for change proposals related to the working environment, appraisal, motivation and career growth area.
|
68 |
Extending Technology Roadmap through Fuzzy Cognitive Map-based Scenarios: The Case of the Wind Energy Sector of PakistanAmer, Muhammad 09 May 2013 (has links)
In this modern era, energy is a key element required for sustainable development and prosperity of a society. Pakistan is an energy deficient country facing problems due to the shortage of over 4000 MW of electricity. The national energy sector is heavily dependent on imported fossil-fuel resources. The energy crisis is negatively affecting all economic and business activities, and it is widely recognized as a severe obstacle to growth and poverty reduction in the country. Establishment of wind farms can help to overcome the energy crisis.
In this research, a national level wind energy roadmap is developed through scenario planning. Multiple future scenarios are developed using the fuzzy cognitive maps (FCM) approach. This research has extended technology roadmapping through FCM-based scenario analysis. Building scenarios with FCM is a very new approach, and for the first time FCM-based scenarios are developed for the wind energy sector of Pakistan. Based on these multiple scenarios, a technology roadmap has been developed. This research approach is applied to the wind energy sector of Pakistan as a case study.
This approach has been used to establish objectives and national targets of the roadmap. Then in a systematic way, critical roadmap barriers are identified against each scenario, and appropriate action items have been proposed to overcome barriers and promote deployment of wind energy projects in Pakistan. The objectives and targets of the roadmap have been translated into action items. The technology roadmap has four layers: strategic objectives, targets, barriers, and action items. Expert panels have been utilized to develop scenarios and technology roadmaps. Validation of this research is also carried out using experts. This new approach has helped to develop a robust roadmap and enabled anticipation of a wide range of possible future outcomes.
This research fills an important gap by combining scenario planning and technology roadmapping techniques in future studies, and it has enhanced flexibility of the developed roadmap. Moreover, for the first time multiple and plausible FCM-based scenarios are developed, which combine the benefits of both qualitative and quantitative analysis. Moreover, the technology roadmap for the wind energy sector of Pakistan is developed with a comprehensive study of practical obstacles and barriers towards deployment of wind energy technology. The research findings suggest that policy, financial, economic, lack of competition with conventional power plants, and technical are the most critical barriers towards deployment of wind energy projects in the country. Appropriate action items required to overcome the roadmap barriers against each scenario are also proposed in the developed roadmap. The experts also assigned responsibilities for the key roadmap action items to the major stakeholders.
|
69 |
Participativní přístupy a městský rozvoj. Případová studie z Amsterdamu. / Participatory approaches and urban development: A case study of AmsterdamMirmohammad Sadeghi, Fariba January 2021 (has links)
in English Amsterdam is a unique combination of hydraulic engineering and built environment, urban design and city image, multiculturalism and neoliberalism, toleration and integration, commerce and business, culture and identity, individualism, and public decision-making among European cities. This thesis tries to explore Amsterdam's urban development in the contexts of urban planning, decision making, institutional policies and public participation. Moreover, this research studies the image of Amsterdam as a UNESCO world heritage site, the history of its urban development, its demography and immigrant population, and its municipal structure. The municipality of Amsterdam as the main actor of urban planning and development policies is studied for answering the research question: How does the municipality involve citizens in its urban development projects? To answer this question, of the seven districts of Amsterdam, the youngest district with the highest number of urban renewal projects is chosen: The Nieuw- West district, which is also the greenest and second-largest district of Amsterdam. By using content analysis from the municipality's website project information and Arnstein's ladder of participation in the methodology, the public participation framework and function is studied. The urban...
|
70 |
Scalar politics : sustainability planning under Localism and the delivery of London's Olympic legacyHoolachan, Andrew January 2017 (has links)
This thesis seeks to address a research gap concerning the relationship between the Localism Act 2011 and planning’s central purpose of achieving sustainable development. In addition it uses a physical example in urban space to illustrate the main arguments, and in doing so adds to the growing literature on the various outcomes since the Localism Act was enforced across England in 2011. The thesis asks four inter-related questions: Firstly, regarding the theoretical bases of sustainability and localism from the various ontologies of ‘scale’ and ‘the natural’; secondly, regarding the general conflicting assumptions within localism and sustainable development; thirdly, regarding the ways in which sustainable development is inherently multi-scalar; and lastly how our case study example highlights the need for policy-makers to examine the often overlooked trade-offs which exist in normative sustainable development models. The thesis also demonstrates the role that site-specific research can play in grounding theoretical and policy discussions. The research is situated in the rapidly changing sub-region of East London, particularly in the shadow of the 2012 Olympic regeneration of Stratford and the Borough of Newham. We take the example of a failed upgrade due the Localism Act, of a multi-scalar and multi-functional ‘Greenway’ to consider the relationship between localism and sustainable urbanism in the context neo-liberalism. Methods comprise site-based analysis in the form of walking, photography and note-taking, the analysis of national, metropolitan and local planning documents, as well as interviews with officials related to policy and design in the area and local residents. The research finds that national and metropolitan conceptions of sustainable development are weighted differently to those at local scales. In addition the Localism Act exacerbates planning capacities between Local Authorities and the communities they serve. There are some opportunities for neighbourhood planning but these are dependent on local capacities, widening already-existing socio-spatial inequalities. The thesis concludes by destabilising the widely used idea of sustainable development as a ‘balance’ between social, economic and environmental needs. Viewing sustainability through a scalar lens, in our case using a physical site and the policy of Localism, we are able to reveal the material differences between sustainable development agendas which have been criticised for masking over conflict in a post-political manner for the continuation of ‘status quo’ economic development trajectories.
|
Page generated in 0.1637 seconds