Spelling suggestions: "subject:"distribuição bnormal bivariada"" "subject:"distribuição bnormal univariada""
1 |
Avaliação de uma Classe de Coe cientes de Correlação sob Normalidade BivariadaXavier, Cleber Martins 19 February 2014 (has links)
Submitted by Etelvina Domingos (etelvina.domingos@ufpe.br) on 2015-03-12T19:15:11Z
No. of bitstreams: 2
license_rdf: 1232 bytes, checksum: 66e71c371cc565284e70f40736c94386 (MD5)
DISSERTAÇÃO Cleber Martins Xavier.pdf: 17520287 bytes, checksum: d1c8c426b43447666fa634742f058bf5 (MD5) / Made available in DSpace on 2015-03-12T19:15:11Z (GMT). No. of bitstreams: 2
license_rdf: 1232 bytes, checksum: 66e71c371cc565284e70f40736c94386 (MD5)
DISSERTAÇÃO Cleber Martins Xavier.pdf: 17520287 bytes, checksum: d1c8c426b43447666fa634742f058bf5 (MD5)
Previous issue date: 2014-02-19 / CAPES / O coe ciente de correlação é uma medida que permite mensurar a dependência
entre duas variáveis. Na literatura estatística existem diversos coe cientes de
correlação, como por exemplo o de Pearson (Pearson, 1931 e Pearson, 1932), Kendall
(Kendall, 1938) e Spearman (Spearman, 1904) que são usados sob diferentes
condições dos dados. Nesta dissertação discutimos sobre o coe ciente de correlação
generalizado proposto por Chinchilli et al. (2005), o qual é obtido através de estat
ísticas U. Este coe ciente tem como casos especiais o coe ciente de correlação
de Pearson e de Kendall. Neste trabalho foram desenvolvidos estudos de simulação
a m de avaliar o comportamento do coe ciente de correlação generalizado em pequenas
e grandes amostras e sob diferentes cenários que incluem amostras normais
bivariadas, amostras bivariadas contaminadas e perturbadas. Por m, utilizando um
banco de dados real de microarrays usamos o coe ciente de correlação generalizado
na construção de uma rede de relevância.
|
2 |
Alocação de Medidores para a Estimação de Estado em Redes Elétricas InteligentesRaposo, Antonio Adolpho Martins 26 February 2016 (has links)
Made available in DSpace on 2016-08-17T14:52:40Z (GMT). No. of bitstreams: 1
Dissertacao-AntonioAdolphoMartinsRaposo.pdf: 6219934 bytes, checksum: 92f0e1fb7c3d703fcf27aae305b549f2 (MD5)
Previous issue date: 2016-02-26 / Coordenação de Aperfeiçoamento de Pessoal de Nível Superior / To plan and operate properly a Smart Grid (SG), many new technical considerations in the context of distribution systems, must be considered, for example: stability (due to installation of Distributed Generation (DG), the load and generation dispatch, management of energy storage devices and the assessment of the impact of electric vehicle connection on the distribution system. The main prerequisite for many of these new functions in the distribution system control center is to determine the electrical network state (magnitude and angle of nodal voltages) in real time from measurement devices installed in it. In the transmission system control centers, this task is performed by the state estimation tool. Thus, the Distribution System State Estimation (DSSE) is one of the cornerstones for the implementation of a SG. The presence of a small number of measurements can make the grid unobservable in the context of the DSSE. That is, the state variables (magnitude and angle of the node voltages of all bus) can not be determined from a set of measurements by a state estimator. Due to this, it is usually added a large number of pseudo measurements to the existing measurement plan to ensure observability and to enable the DSSE. A drawback with this strategy is that the accuracy of the estimated state is compromised due to the fact that the errors associated with the pseudo measurements are considerably higher than those relating to real measurements. Consequently, it is necessary to allocate meters (voltage magnitude, active and reactive power flows, current magnitudes, etc.) to guarantee the accuracy of the DSEE. The meter placement problem for the state estimation in the transmission networks is usually carried out with the objective of assuring the observability. On the other hand, the meter placement for the EERD aims to minimize probabilistic index associated with the errors between the true and estimated state vectors. An important component of the method used to solve the meters placement problem is a probabilistic technique used to estimate the objective function. Due to the nonlinear nature of DSSE problem, the best option has been to use the Monte Carlo Simulation (MCS). A disadvantage of the MCS to estimate the objective function of the allocation problem is its high computational cost due to the need to solve a nonlinear state estimation problem for each sample element. The main objective of this dissertation is to propose a probabilistic techniques to improve the computational performance of existing methodologies for meter placement without reducing the accuracy of the estimated ix state. This compromise has been established using two strategies. In the first one, a linear model is used to estimate the state and the MCS is applied to determine the risks of the objective function. In the second one, a closed analytical formula is used to determine the risks based on the linearized model. Furthermore, the improved versions of the meter placement algorithms proposed in this dissertation consider the effect of the correlation among the measurements. The proposed meter placement algorithms were tested in the British distribution system of 95 bus. The tests results demonstrate that the introduction of the proposed strategies in a meter placement algorithm significantly reduced its computational cost. Moreover, it can be observed that there were improvements in accuracy in some cases, because the risk estimates provided by MCS are not accurate with small samples. / Para planejar e operar adequadamente uma Rede Elétrica Inteligente (REI), muitas novas considerações técnicas, no âmbito de sistemas de distribuição, devem ser apreciadas, por exemplo: a estabilidade devido a instalação de Geração Distribuída (GD), o despacho de carga e geração, o gerenciamento de dispositivos de armazenamento de energia e a avaliação do impacto da conexão de veículos elétricos na rede de distribuição. O principal pré-requisito para muitas destas novas funções do centro de controle do sistema de distribuição é a determinação do estado da rede elétrica (módulo e a fase das tensões nodais) em tempo real a partir de dispositivos de medição nela instalados. Em centros de controle de sistemas de transmissão esta tarefa é realizada por ferramentas de estimação de estado. Desta forma, a Estimação de Estado em Redes de Distribuição (EERD) é um dos alicerces para a implantação de uma REI. A presença de um número reduzido de medições pode tornar a rede elétrica não observável no âmbito da EERD. Isto é, as variáveis de estado (módulo e fase das tensões nodais em todas as barras) não podem ser determinadas a partir de um conjunto de medições por um estimador de estado. Devido a isto, geralmente adiciona-se um grande número de pseudo-medições ao plano de medição existente para assegurar a observabilidade e viabilizar a EERD. Um problema com esta estratégia é que a precisão do estado estimado é comprometida devido ao fato de que os erros associados com as pseudo-medições são consideravelmente maiores do que aqueles referentes às medições reais. Consequentemente é necessário alocar medidores (magnitude das tensões, fluxos de potência ativa e reativa, magnitude das correntes, etc.) para garantir a precisão do EERD. O problema de alocação de medidores para a estimação de estado em redes de transmissão é, geralmente, realizado com o objetivo de assegurar a observabilidade. Por outro lado, a alocação de medidores para EERD é realizada visando minimizar índices probabilísticos associados com os erros entre os vetores de estado estimado e verdadeiro. Um componente importante do método usado para resolver o problema de alocação de medidores é a técnica probabilística usada para estimar a função objetivo. Devido à natureza não-linear do problema de EERD, a melhor opção tem sido utilizar a Simulação Monte Carlo (SMC). Uma desvantagem da SMC para estimar a função objetivo do problema de alocação é o seu alto custo computacional devido a necessidade de resolver um problema de estimação de estado não-linear para cada vii elemento da amostra. O principal objetivo desta dissertação é propor técnicas probabilísticas para melhorar o desempenho computacional de metodologias existentes para alocação de medidores sem sacrificar a precisão do estado estimado. Este compromisso foi estabelecido usando-se duas estratégias. Na primeira, um modelo linearizado é usado para estimar o estado e a SMC para determinar os riscos da função objetivo. Na segunda, uma fórmula analítica fechada é usada para determinar os riscos com base no modelo linearizado. Além disso, as versões melhoradas dos algoritmos de alocação propostos nesta dissertação consideram o efeito da correlação entre as medições. As metodologias de alocação propostas foram testadas no sistema de distribuição britânico de 95 barras. Os resultados dos testes demonstraram que a introdução das estratégias propostas em um algoritmo de alocação de medidores reduziu significativamente o seu custo computacional. Além disso, pode-se observar que ocorreram melhorias na precisão em alguns casos, pois as estimativas dos riscos fornecidas pela SMC não são precisas com pequenas amostras.
|
Page generated in 0.0719 seconds