1

Gestão de execução do portfólio de obras de planejamento das empresas distribuidoras usando modelagem de financiamento. / Implementation of portfolio management works planning distribution companies using modeling funding.

David, André Luís de Castro 09 May 2013 (has links)
Este trabalho tem como objetivo descrever a implantação de um modelo para obtenção de sucesso na execução de obras oriundas do Planejamento de Distribuição, de forma a obter os benefícios integrais que as mesmas devem trazer tanto ao sistema elétrico como também à vida técnica e financeira da Distribuidora. Além de dotar as Distribuidoras de um mecanismo que possa atuar na otimização de seus custos, necessidade fundamental antes da publicação da Medida Provisória nº 579 de 11 de setembro de 2012 que dispõem sobre - Concessões de Geração, Transmissão e Distribuição de energia elétrica, sobre a redução de encargos setoriais, sobre a modicidade tarifária - que pressionam ainda mais as Distribuidoras na busca de soluções inovadoras e de impacto para buscar o equilíbrio de caixa. Considerando que o modelo atual de contratação de obras leva as Distribuidoras a não conseguirem executar toda a programação recomendada pelo Planejamento em função da falta de materiais ou por problemas vinculados à contratação das obras, não são obtidos os benefícios que a Distribuidora teria com a sua execução, pelo contrário, os atrasos causam prejuízos, atendimento deficiente, degradação da rede, etc. Desta forma o processo de gestão proposto é utilizado em um conjunto de obras determinadas pelo Planejamento, incluindo a definição dos materiais para a execução das mesmas. Os pontos importantes deste processo seriam a estrutura de contratação utilizando financiamento, além do repasse da responsabilidade de boa parte da cadeia de valor da gestão dos materiais para as empresas executoras dos serviços de obras, possibilitando a Distribuidora obter vantagem na alavancagem financeira, reduções de custos em sua estrutura, além de redução das perdas de não execução do Plano de Obras definido pelo Planejamento. Este processo de gestão busca mecanismos que possam alavancar a execução dos projetos que utilizam recursos de curto prazo já que a maioria dos projetos dura em média de 6 a 12 meses, salientando-se que ao se buscar novos mecanismos, as empresas distribuidoras conseguem reduzir seu desembolso de curto prazo, reduzir custos de estoques, contratação de pessoal, impactando tanto nos custos fixos como nos variáveis dentro da organização, e com isso obtendo equilíbrio no resultado do seu EBITDA (earnings before interest, taxes, depreciation and amortization). Principalmente após a publicação da MP Nº 579, ficou evidente, a necessidade de se buscar opções adequadas para atender o mercado de distribuição que tem dentro das novas premissas regulatórias, a imperiosa restrição de custos sejam eles de natureza operacionais ou econômicos. No modelo proposto foram utilizados dados e informações da modelagem executada em uma empresa de Distribuição do setor elétrico Brasileiro. Foi possível através desta modelagem, mostrar os benefícios tanto para os Stakeholders, as partes interessadas, empregados, investidores, como para os Shareholders, acionistas. É importante saber que a estruturação deste modelo proposto requer a utilização de ampla gama de instrumentos financeiros, comerciais, legais e técnicas para mitigação de riscos e um rigoroso controle dos fluxos financeiros para os empreendimentos necessários pela Empresa. / This research aims to describe the implementation of a model to succeed in the execution of works derived from Distribution Planning, in order to achieve the full benefits they could bring both to the electrical system as well as to the technical and financial life of the power distribution company (PDC); these benefits are defined, a priori, by the planning area. Besides providing the PDCs with a mechanism that can act to optimize their costs, a fundamental need before the publication of Provisional Measure No. 579 of September 11th, 2012, which provides about Generation Concessions, power Transmission and Distribution, the reduction of sector charges, the tariff affordability, Pushing PDCs further towards finding innovative solutions and impact to seek cash balance. Considering that the current model of contracting works leads the PDCs to fail to perform the whole schedule recommended by Planning due to the lack of materials or problems related to contracting works, the PDCs would not obtain the benefits expected with their execution; delays thus cause losses, inadequate service, network degradation, etc. Thus, the proposed management process is used in a number of works determined by Planning, including the definition of materials for their execution. The important points of this process would be the hiring structure using financing, along with the transfer of the responsibility for a large share of the materials management value chain for companies executing the works, allowing PDCs to take advantage from financial leverage, cost reductions in their structure, and reducing losses for not executing the work plan defined by Planning. This management process seeks mechanisms that can leverage the execution of projects that use short-term funds since most projects last about 6 to 12 months, noting that when seeking new mechanisms, distribution companies can reduce their short-term disbursement, reduce inventory costs, staffing, impacting both the fixed and the variable costs within the organization, thereby achieving balance in its EBITDA yield (earnings before interest, taxes, depreciation and amortization). The publication of MP Nº 579 made even more evident the need to find suitable options to meet the distribution market that has the overriding cost constraint, be they operational or economic, within the new regulatory premises. In the proposed model, we used data and information of the modeling performed in a Brazilian power distribution company. This modeling allowed us to show the benefits for stakeholders, employees, investors, and for the shareholders. It is important to know that the structure of this proposed model requires the use of a wide range of financial, commercial, legal and technical instruments to mitigate risks and a strict control of financial flows for the developments needed by the company.
2

Gestão de execução do portfólio de obras de planejamento das empresas distribuidoras usando modelagem de financiamento. / Implementation of portfolio management works planning distribution companies using modeling funding.

André Luís de Castro David 09 May 2013 (has links)
Este trabalho tem como objetivo descrever a implantação de um modelo para obtenção de sucesso na execução de obras oriundas do Planejamento de Distribuição, de forma a obter os benefícios integrais que as mesmas devem trazer tanto ao sistema elétrico como também à vida técnica e financeira da Distribuidora. Além de dotar as Distribuidoras de um mecanismo que possa atuar na otimização de seus custos, necessidade fundamental antes da publicação da Medida Provisória nº 579 de 11 de setembro de 2012 que dispõem sobre - Concessões de Geração, Transmissão e Distribuição de energia elétrica, sobre a redução de encargos setoriais, sobre a modicidade tarifária - que pressionam ainda mais as Distribuidoras na busca de soluções inovadoras e de impacto para buscar o equilíbrio de caixa. Considerando que o modelo atual de contratação de obras leva as Distribuidoras a não conseguirem executar toda a programação recomendada pelo Planejamento em função da falta de materiais ou por problemas vinculados à contratação das obras, não são obtidos os benefícios que a Distribuidora teria com a sua execução, pelo contrário, os atrasos causam prejuízos, atendimento deficiente, degradação da rede, etc. Desta forma o processo de gestão proposto é utilizado em um conjunto de obras determinadas pelo Planejamento, incluindo a definição dos materiais para a execução das mesmas. Os pontos importantes deste processo seriam a estrutura de contratação utilizando financiamento, além do repasse da responsabilidade de boa parte da cadeia de valor da gestão dos materiais para as empresas executoras dos serviços de obras, possibilitando a Distribuidora obter vantagem na alavancagem financeira, reduções de custos em sua estrutura, além de redução das perdas de não execução do Plano de Obras definido pelo Planejamento. Este processo de gestão busca mecanismos que possam alavancar a execução dos projetos que utilizam recursos de curto prazo já que a maioria dos projetos dura em média de 6 a 12 meses, salientando-se que ao se buscar novos mecanismos, as empresas distribuidoras conseguem reduzir seu desembolso de curto prazo, reduzir custos de estoques, contratação de pessoal, impactando tanto nos custos fixos como nos variáveis dentro da organização, e com isso obtendo equilíbrio no resultado do seu EBITDA (earnings before interest, taxes, depreciation and amortization). Principalmente após a publicação da MP Nº 579, ficou evidente, a necessidade de se buscar opções adequadas para atender o mercado de distribuição que tem dentro das novas premissas regulatórias, a imperiosa restrição de custos sejam eles de natureza operacionais ou econômicos. No modelo proposto foram utilizados dados e informações da modelagem executada em uma empresa de Distribuição do setor elétrico Brasileiro. Foi possível através desta modelagem, mostrar os benefícios tanto para os Stakeholders, as partes interessadas, empregados, investidores, como para os Shareholders, acionistas. É importante saber que a estruturação deste modelo proposto requer a utilização de ampla gama de instrumentos financeiros, comerciais, legais e técnicas para mitigação de riscos e um rigoroso controle dos fluxos financeiros para os empreendimentos necessários pela Empresa. / This research aims to describe the implementation of a model to succeed in the execution of works derived from Distribution Planning, in order to achieve the full benefits they could bring both to the electrical system as well as to the technical and financial life of the power distribution company (PDC); these benefits are defined, a priori, by the planning area. Besides providing the PDCs with a mechanism that can act to optimize their costs, a fundamental need before the publication of Provisional Measure No. 579 of September 11th, 2012, which provides about Generation Concessions, power Transmission and Distribution, the reduction of sector charges, the tariff affordability, Pushing PDCs further towards finding innovative solutions and impact to seek cash balance. Considering that the current model of contracting works leads the PDCs to fail to perform the whole schedule recommended by Planning due to the lack of materials or problems related to contracting works, the PDCs would not obtain the benefits expected with their execution; delays thus cause losses, inadequate service, network degradation, etc. Thus, the proposed management process is used in a number of works determined by Planning, including the definition of materials for their execution. The important points of this process would be the hiring structure using financing, along with the transfer of the responsibility for a large share of the materials management value chain for companies executing the works, allowing PDCs to take advantage from financial leverage, cost reductions in their structure, and reducing losses for not executing the work plan defined by Planning. This management process seeks mechanisms that can leverage the execution of projects that use short-term funds since most projects last about 6 to 12 months, noting that when seeking new mechanisms, distribution companies can reduce their short-term disbursement, reduce inventory costs, staffing, impacting both the fixed and the variable costs within the organization, thereby achieving balance in its EBITDA yield (earnings before interest, taxes, depreciation and amortization). The publication of MP Nº 579 made even more evident the need to find suitable options to meet the distribution market that has the overriding cost constraint, be they operational or economic, within the new regulatory premises. In the proposed model, we used data and information of the modeling performed in a Brazilian power distribution company. This modeling allowed us to show the benefits for stakeholders, employees, investors, and for the shareholders. It is important to know that the structure of this proposed model requires the use of a wide range of financial, commercial, legal and technical instruments to mitigate risks and a strict control of financial flows for the developments needed by the company.
3

Otimização de alocação de chaves em redes de distribuição de energia elétrica / Optimization of switch allocation in power distribution networks

Assis, Laura Silva de, 1983- 25 August 2018 (has links)
Orientadores: Christiano Lyra Filho, Celso Cavellucci / Tese (doutorado) - Universidade Estadual de Campinas, Faculdade de Engenharia Elétrica e de Computação / Made available in DSpace on 2018-08-25T04:13:51Z (GMT). No. of bitstreams: 1 Assis_LauraSilvade_D.pdf: 3122445 bytes, checksum: 01644f90a086983b8729f81804874faa (MD5) Previous issue date: 2014 / Resumo: Grande parte das falhas em sistemas elétricos de potência ocorrem por consequência de falhas permanentes nas redes de distribuição. Agências reguladoras definem índices de confiabilidade para quantificar e avaliar a qualidade da distribuição de energia. A violação dos limites estabelecidos podem resultar em multas significativas para a distribuidora de energia. Um dos objetivos ao se realizar a instalação de chaves em redes de distribuição é criar a possibilidade de re-energizar a maior quantidade de clientes no menor tempo possível através da transferência de carga para sistemas que não tiveram seu fornecimento de energia interrompido. Esta tese estuda o problema de alocação de chaves (PAC) em sistemas radiais de distribuição de energia elétrica e propõe a instalação otimizada desses dispositivos em locais apropriados das redes, a fim de melhorar a confiabilidade do sistema pela redução do período que os consumidores ficam sem energia. Uma metodologia baseada nos conceitos de algoritmo memético juntamente com uma população estruturada é proposta neste trabalho para alocar chaves seccionadoras e de manobra, manuais e automáticas, com diferentes capacidades. A função objetivo utilizada busca minimizar o custo de alocação das chaves e o custo da energia não distribuída sob restrições de confiabilidade e fluxo de carga em todos os componentes da rede. É apresentado também um estudo multiobjetivo para o PAC, que procura alocar chaves minimizando simultaneamente os custos de instalação das chaves e da energia não distribuída e maximizando a confiabilidade da rede, sob restrições de fluxos. A abordagem proposta para resolver o PAC mono-objetivo também foi utilizada no PAC multiobjetivo, juntamente com o método do ?-restrito. A metodologia proposta tem o seu bom desempenho confirmado por diferentes estudos de casos com redes reais de grande porte localizadas no estado de São Paulo / Abstract: Most failures in electric power systems occur as a result of permanent faults in distribution networks. Regulatory agencies establish reliability standards indices for quantify and evaluate the quality of power distribution. The infringe of established limits can result in costly fines for the utility suppliers. One of the aim when perform the switches allocation in distribution networks is the possibility of re-energize the largest amount of customers in the shortest possible time by transferring load to other power systems which don¿t had their energy supply interrupted. This thesis studies the switch allocation problem (SAP) in radial systems of electrical power distribution and proposes an optimized installation of these devices in appropriate locations of network, in order to improve the reliability system by the reducing of the period that consumers remains without power. A methodology based on the concepts of memetic algorithm with a structured population is proposed in this thesis to allocate sectionalizing and tie switches of different capacities, with manual or automatic operation schemes. The objective function used seeks to minimize the switches allocation and the energy not supplied costs under constraints of reliability and load flow. A Multi-objective study for SAP is presented, to perform the switches allocation seeks minimize simultaneously the switches installation and energy not supplied costs and maximize the network reliability, under constraints of load flow. The proposed approach to solve the SAP monocriteria was also used in SAP multi-criteria along with the ?-constraint method. The proposed methodology has its good performance confirmed by several case studies with real large networks located in the state of São Paulo / Doutorado / Automação / Doutora em Engenharia Elétrica
4

Metodologia para modelagem de curvas típicas de demanda elétrica utilizando redes neurais artificiais considerando variáveis climáticas

Marques, Marthielo dos Santos 01 April 2014 (has links)
Submitted by Sandro Camargo (sandro.camargo@unipampa.edu.br) on 2015-05-09T22:40:42Z No. of bitstreams: 1 117110027.pdf: 2705925 bytes, checksum: 22617f402005b98190c3067b1402ee2f (MD5) / Made available in DSpace on 2015-05-09T22:40:42Z (GMT). No. of bitstreams: 1 117110027.pdf: 2705925 bytes, checksum: 22617f402005b98190c3067b1402ee2f (MD5) Previous issue date: 2014-04-01 / A variação do comportamento de consumo elétrico ao longo do dia vem sendo um constante desafio para planejamentos e operação de sistemas de distribuição de energia elétrica. A diversidade de ocorrência dos picos de demanda, considerando diferentes classes de consumo, para um transformador de distribuição, são determinados de uma forma estatística, assim possibilitando uma aproximação do real comportamento dos consumidores de energia elétrica. Mas não basta apenas considerar dados estatísticos, e sim adicionar outros fatores que são determinísticos para definição real desse comportamento destes consumidores ao longo do dia. Neste contexto, é fundamental considerar dados climáticos. Durante um período de 12 meses foi realizada uma campanha de medições e paralelamente um arquivamento de informações utilizando sites da internet sobre dados climáticos da região. Como as medições (amostragens) foram, geograficamente, muito próximas, foi possível acompanhar e perceber a modificação de comportamento dos consumidores, como a utilização de condicionadores de ar e refrigeração em geral. Portanto, como objetivo de aperfeiçoar a caracterização de curvas típicas de demanda de energia elétrica, neste trabalho, utilizando metodologias de redes neurais, serão agrupadas as curvas de demanda considerando: classes, subclasses, consumo médio (últimos 12 meses) de energia elétrica, e adicionalmente dados climáticos. / The variation of the behavior of electrical consumption throughout the day has been a constant challenge for planning and operation of electric power distribution systems. The diversity of occurrence of peak demand, considering different classes of consumption to a distribution transformer are determined in a statistical manner, allowing an approximation of the actual behavior of consumers of electricity. But not enough to consider only statistical data, but add other factors that are deterministic for real definition of the behavior of these consumers throughout the day. In this context, it is crucial to consider climate data. During a period of 12 months, a measurement campaign was carried out in parallel and an archive of information using the internet sites on climatic data of the region. Because measurements (samples) were geographically very close, it was possible to follow and realize the change in consumer behavior, such as the use of air conditioners and cooling in general. Therefore, the objective of improving the characterization of typical curves of electricity demand, this paper, using methodologies neural networks, are grouped considering the demand curves: classes, subclasses, middle (last 12 months) of electricity, and additionally climatic data.
5

Simulation numerique des vibrations induites par effet de couronne sur les conducteurs a haute tension /

Demers, Pierre. January 1994 (has links)
Mémoire (M.Eng.)-- Université du Québec à Chicoutimi, 1994. / Document électronique également accessible en format PDF. CaQCU
6

Ustálený chod a zkratové poměry v síti 110 kV E.ON při můstkovém provozu transformátorů T402 a T403 v transformovně 400/110 kV Sokolnice / Steady state and short-circuit conditions within E.ON 110kV power network at bridge operation of transformers T402 and T403 in 400/100kV transformer station Sokolnice

Bernát, Jan January 2014 (has links)
The master’s thesis deals with a calculation of steady state and short-circuit conditions in a 110 kV system during a bridge operation of transformers in a Sokolnice substation. The theoretical part of the thesis deals with a calculation of steady state of a system using Newton’s iterative method, it investigates short-circuits – their timing, distinctive values and a method of their calculation. In the practical part the 100 kV grid supplied from Sokolnice substation is described. The main goal of the thesis is a comparation of two basic wirings: bridge operation of T202 and T203 transformers (contemporarily in service) and bridge operation of T402 and T403 (in service after 2017). These two wirings were controlled even during one state of emergency during which the Sokolnice substation will be affected by an outage of one busbar. Voltage conditions, loading of power line and transformers and overall power balance were controlled. Short-circuit conditions were also calculated and short-circuit resistance of particular substations was inspected. In the conclusion technical measures needed to ensure smooth bridge operation of convertors T402 and T403.