• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 7
  • 5
  • 1
  • 1
  • 1
  • Tagged with
  • 15
  • 15
  • 6
  • 5
  • 5
  • 4
  • 4
  • 4
  • 4
  • 4
  • 4
  • 4
  • 4
  • 4
  • 3
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
11

Koncepce vysokorychlostní vrtné hlavy pro odběr vzorků hornin / Concept of high-speed drilling head for sampling rocks

Maštera, Lukáš January 2021 (has links)
THE THESIS FOCUSES ON A CONSTRUCTION DESIGN OF A NEW DRILLING HEAD DESIGNED TO REPLACE THE ORIGINAL ONE IN A MULTIDRILL HYNDAGA DRILLING RING. THE SUBSTITUTION IS SUPPOSED TO PROVIDE A SOLUTION TO THE SHORTCOMINGS OF THE CURRENTLY USED DRILLING HEAD. THE THESIS ANALYSES PARAMETERS OBTAINED FROM THE MANUFACTURER, NEW PRODUCTION REQUIREMENTS AND PROPOSES TWO TYPES OF MOTORS INNOVATIVE METHODS HAD BEEN IMPLEMENTED IN CALCULATIONS OF CONCEPTUAL PARAMETERS OF THE NECESSARY COMPONENTS. THE OUTCOME IS A NEW F-TYPE DRILLING HEAD.
12

Hrubá stavba objektu AV v Praze Dejvicích - stavebně technologický projekt / Shell of the building of the Academy in Prague Dejvice - building technology project

Šorm, Petr January 2014 (has links)
Building Technology project deals with the processing of the necessary documents and documentation for implementation shell of the building of the Academy of Sciences in Prague Dejvice. At the beginning of the technical report on the building technology project, which provides basic information about the construction. Content is the solution of the building construction site by the financial, structural and technological and time. Construction technology solution is based on monolithic work.
13

Kampus MU Brno (zelená etapa) - stavebně technologický projekt / Campus MU Brno (green stage) - construction technological project

Honzík, Roman January 2015 (has links)
The subject of this thesis is the solution of building technology project for the construction of the main processing stages University Campus Bohunice (green stage). It is a building consisting of nine pavilions which are mutually connected by two corridors. Corridors simultaneously combine green building stage with blue previous stage. All buildings are partial basement and three floors. Exceptions are SO IV-309, which consisted of four storeys with casing of an elliptic cylinder with a flat roof in the middle of the roof sheathing. In my thesis I deal specifically this very building object, which I discussed in terms of time, financial, technological progress bored piles and building equipment. Other portions are designed to project the whole building.
14

Stavebně technologického řešení Vzdělávacího komplexu v Brně / Technological solution for the education complex in Brno

Blažek, David January 2012 (has links)
This master’s thesis deals with construction of the gross building of new building of learning complex FEKT VUT in Brno. It contains the design of earthworks, underground setting piles, monolithic structures and isolation of the building for further construction. Construction and technological project includes technical report, time and financial plan of construction, study of the implementation of major technological stages of site preparation, budget of facilities, technological regulation to solved stages, inspection and test plan of monolithic structures, health and safety plan and energy label of objects.
15

Stavebně technologický projekt revitalizace těžní věže Brno / Construction and technological project of revitalization of mining tower in Brno

Všetečka, Jan January 2015 (has links)
The task of this diploma’s thesis was processing construction-technology project to revitalization the mining towers because of its current worsened state and subsequent adjustments for cultural activities.

Page generated in 0.0827 seconds