Spelling suggestions: "subject:"bishop"" "subject:"blshop""
1 |
Shop steward satisfaction under collective bargaining a field study /McBeath, Donald Drake, January 1975 (has links)
Thesis (M.S.)--University of Wisconsin--Madison. / Typescript. eContent provider-neutral record in process. Description based on print version record. Includes bibliographical references (leaves 155-157).
|
2 |
The operation of the right to work lawsDempsey, Joseph Richard. January 1958 (has links)
Thesis (Ph. D.)--University of Wisconsin--Madison, 1958. / Typescript. Vita. eContent provider-neutral record in process. Description based on print version record. Includes bibliographical references (leaves 192-204).
|
3 |
Lot Streaming in Two-Stage Flow Shops and Assembly SystemsMukherjee, Niloy Jeet 09 October 2014 (has links)
The research work presented in this dissertation relates to lot streaming in two-stage flow shops and assembly shops. Lot streaming refers to the process of splitting a production lot into sublots, and then, processing the sublots on different machines simultaneously in an overlapping manner. Such a strategy allows finished material at each stage to be transferred downstream sooner than if production and transfer batches were restricted to be the same size. In the case when each sublot consists of just one item, a single-piece-flow is obtained. Such a continuous flow is a key element of the Toyota Production System. However, single-piece-flow increases the number of transfers and the total transportation cost (time). As a result, it may not be economically justifiable in many cases, and therefore, material may have to be transferred in batches (called transfer batches, or sublots). Lot streaming addresses the problems of determining optimal sublot sizes for use in various machine environments and optimizes different performance measures.Given this relationship between lot streaming and the Toyota Production System, lot streaming can be considered a generalization of lean principles.
In this dissertation, we first provide a comprehensive review of the existing literature related to lot streaming. We show that two-stage flow shop problems have been studied more frequently than other machine environments. In particular, single-lot two-machine flow shops have been very well researched and efficient solution techniques have been discovered for a large variety of problems.
While two-stage flow shop lot streaming problems have been studied extensively, we find that the existing literature assumes that production rates at each stage remain constant. Such an assumption is not valid when processing rates change, for example, due to learning. Learning here, refers to the improvements in processing rates achieved due to experience gained from processing units. We consider the case when the phenomenon of learning affects processing and setup times in a two-stage flow shop processing a single lot, and when, sublot-attached setup times exist. The decrease in unit-processing time, or sublot-attached setup time, is given by Wright's learning curve. We find closed-form expressions or simple search techniques to obtain optimal sublot sizes that minimize the makespan when the effect of learning reduces processing times, sublot-attached setup times, or, both. Then, we provide a general method to transform a large family of scheduling problems related to lot streaming in the presence of learning, to their equivalent counterparts that are not influenced by learning. This transformation is valid for all integrable learning functions (including the Wright's learning curve). As a result, a large variety of new problems involving learning can be solved using existing solution techniques.
We then consider lot streaming in stochastic environments in the context of sourcing material. Such problems have been well studied in the literature related to lot streaming for cost-based objective functions when demand is continuous, and when processing times are deterministic, or, for material sourcing problems when the time required to procure a lot is stochastic but is independent of the lot size. We extend this study to the case when the time required to produce a given quantity of products is stochastic and dependent on the number of units produced. We consider the case when two sublots are used, and also compare the performance of lot streaming to the case when each sublot is sourced from an independent supplier.
Next, we address a new problem related to lot streaming in a two-stage assembly shop, where we minimize a weighted sum of material handling costs and makespan. We consider the case when several suppliers provide material to a single manufacturer, who then assembles units from different suppliers into a single item. We assume deterministic, but not necessarily constant, lead times for each supplier, who may use lot streaming to provide material to the manufacturer. Lead times are defined as the length of the time interval between a supplier beginning to process material and the time when the first sublot is delivered to the manufacturer; Subsequent sublots must be transported early enough so that the manufacturer is not starved of material. The supplier may reduce this lead time by using lot streaming, but at an increased material handling cost. The decrease in lead time is also affected by other factors such as lot attached/detached setup times, transportation times etc. We allow these factors to be different for each supplier, and each lot processed by the same supplier. We refer to this problem as the Assembly Lot Streaming Problem (ALSP). We show that the ALSP can be solved using two steps. The first step consists of solution to several two-stage, single-lot, flow shop, makespan minimization problems. The solution to these problems generate prospective sublot sizes. Solution methods outlined in the existing literature can be used to complete this step. The second step obtains optimal number of sublots and production sequence. For a given production sequence, this step can be executed in polynomial-time; otherwise, the second step problem is NP-hard and integer programming formulations and decomposition-based methodologies are investigated for their solution. We make very limited assumptions regarding the handling cost and the relationship between the supplier lead time and number of sublots used. As a result, our solution methodology has a wide scope. / Ph. D.
|
4 |
Reinforcement planning for resource allocation and constraint satisfactionLiu, Bing January 1988 (has links)
No description available.
|
5 |
Ett starkt varumärke: en otillbörlig konkurrensfördel vid privatisering? : En jämförande studie av<em> Apoteket Shop</em> och <em>The Body Shop</em> / A strong brand: an undue competitive advantage at privatization? : A comparative study of Apoteket Shop and The Body ShopLópez, Carolina, Bustamante Pettersson, Natalia January 2009 (has links)
<p><strong>Syfte: </strong>Syftet är att analysera och utvärdera Apoteket Shop och The Body Shop som varumärke</p><p><strong>Metod: </strong>Denna studie har utgått ifrån ett holistiskt synsätt. Det valda teoretiska förhållningssättet är deduktion och en kvalitativ forskningsmetod i form av djupintervjuer samt kvantitativ forskningsmetod i form av en enkätundersökning.</p><p><strong>Teorier: </strong>Involvement Theory, Brand, Brand Strategy, Brand Equity, Business Concept, Planning Philosophies, Brand Service Value Chain, Total Communication.</p><p><strong>Empiri: </strong>Totalt 6 st djupintervjuer med representanter på Apoteket Shop och The Body Shop. Enkätundersökning med 25 stycken kunder på vardera företag.</p><p><strong>Resultat: </strong>Resultatet visar att Apoteket Shop har ett långsiktigt tänkande men en bit kvar i implementeringsarbetet. The Body Shop har ett långsiktigt tänkande vilket även syns tydligt i deras arbete. </p><p><strong>Slutsats: </strong>De otillbörliga konkurrensfördelar som Apoteket Shop har är att de redan tillhör ett starkt och väletablerat varumärke. Om Apoteket Shop inte arbetar så att organisationsutformningen är i samklang med den starka affärsidén/varumärket kommer de otillbörliga konkurrensfördelar endast att vara kortsiktiga då förutsättningarna för en långsiktighet inte finns inom organisationen. </p> / <p><strong>Purpose: </strong>The purpose is to analyze and evaluate Apoteket Shop and The Body Shop as a brand. </p><p><strong>Method: </strong>This essay will have a holistic approach. The chosen theoretical approach is deductive. Qualitative methods will be used in the form of deep interviews as well as quantitative methods in the form a questionnaire survey. </p><p><strong>Theories: </strong>Involvement Theory, Brand, Brand Strategy, Business Concept, Planning Philosophies, Brand Service Value Chain, Total Communication</p><p><strong>Empiric: </strong>A total of six deep interviews with representatives from Apoteket Shop and The Body Shop. Questionnaire survey with 25 customers from each company.</p><p><strong>Result: </strong>The result shows that Apoteket Shop has a long–term thinking in their work but needs to work more with taking these thoughts into action. The Body Shop has also a long–term thinking which clearly shows in the way they work. </p><p><strong>Conclusion: </strong>The undue competitive advantages that Apoteket Shop has are the fact that they already belong to a strong and well established brand. If Apoteket Shop doesn’t work so that the structure of their organization is in tune with the strong business concept/brand, these undue advantages will only be short-term since the conditions for a long-term doesn´t exist in the organization.</p>
|
6 |
The closed shop in American trade unions ...Stockton, Frank T. January 1911 (has links)
Thesis (Ph. D.)--Johns Hopkins University. / Vita. Includes bibliographical references.
|
7 |
Kombinatorische Ressourcenallokation mit ökonomischen KoordinationsmechanismenConen, Wolfram. January 2003 (has links) (PDF)
Essen, Universiẗat, Diss., 2003.
|
8 |
Statistické zpracování marketingového průzkumu v oblasti nákupů přes internetHerman, Pavel January 2010 (has links)
No description available.
|
9 |
Vyhodnocení způsobů uzavírání dodavatelsko-odběratelských vztahů v obchodní společnosti Lingea s.r.o.Dobešová, Michaela January 2012 (has links)
No description available.
|
10 |
Model elektronického obchodu / Model of E-commerceKrejčířová, Lívia January 2010 (has links)
My master thesis is focused on creating of own e-commerce, not only as a tool of management in competition, but it is also useful for improving and pointing society. Based on theoretical knowledge and analysis of company, it specifies changes in management and proposal of model e-commerce and components related to e-commerce.
|
Page generated in 0.0396 seconds