1 |
Dimensionamento do volume útil de reservação de água considerando o consumo de energia elétrica no horário de ponta do setor elétrico / Dimension of useful volume of water reservoir considering the consumption of electricity in the time of attachment of the electrical sectorMOREIRA, Francisca Nara da Conceição 07 February 2018 (has links)
Submitted by Kelren Mota (kelrenlima@ufpa.br) on 2018-05-15T17:47:41Z
No. of bitstreams: 2
license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5)
Dissertacao_DimensionamentoVolumeUtil.pdf: 4176647 bytes, checksum: 3237cca508009d83a5fd01555078157d (MD5) / Approved for entry into archive by Kelren Mota (kelrenlima@ufpa.br) on 2018-05-15T17:49:04Z (GMT) No. of bitstreams: 2
license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5)
Dissertacao_DimensionamentoVolumeUtil.pdf: 4176647 bytes, checksum: 3237cca508009d83a5fd01555078157d (MD5) / Made available in DSpace on 2018-05-15T17:49:04Z (GMT). No. of bitstreams: 2
license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5)
Dissertacao_DimensionamentoVolumeUtil.pdf: 4176647 bytes, checksum: 3237cca508009d83a5fd01555078157d (MD5)
Previous issue date: 2018-02-07 / Determinação do volume útil de reservação para eficiência hidroenergética em sistemas de abastecimento de água. A pesquisa foi realizada no sistema de bombeamento e reservação de água do Setor Guanabara, Ananindeua, Belém, Pará. Para isto, o trabalho foi dividido em três etapas, a saber, na primeira foram verificadas as condições de projeto e operacionais do Setor Guanabara para avaliação do desempenho hidroenergético. Na segunda Etapa foram determinados três (3) volumes teórico úteis de reservação, considerando diferentes métodos. Na terceira Etapa, considerando quatro (4) diferentes volume úteis, de projeto e três (3) teóricos, foram realizadas simulações hidroenergética para verificar o volume útil mais eficiente em termos hidroenergéticos. Para tanto, foi considerado a mesma curva de consumo e vazão média de bombeamento, porém, diferentes volumes úteis nas simulações. Na pesquisa foi verificado que o volume útil do reservatório elevado do Setor Guanabara não permite a redução do bombeamento de água no posto horário de ponta, o que, naturalmente, influencia no valor da despesa de energia elétrica e que o reservatório elevado estava sendo utilizado como “caixa de passagem”. Assim, foram estudadas três alternativas para modificar a atual situação operacional da unidade de reservação do Setor Guanabara, visando a redução do consumo e despesa de energia elétrica. No dimensionamento dos volumes úteis pelos 3 métodos estudados, foram obtidos 808,96 m³ com o Método da CETESB (1987), 936,77 m³ com os procedimentos recomendados na NBR 12.217 (1994) e 1.411,10 m³ quando foi utilizada o método proposto por Gomes (2012). Nas simulações realizadas no Epanet 2.0 resultou despesa de energia elétrica em R$ 25.789,54/mês para o volume útil do reservatório elevado projetado. De R$ 26.363,87/mês para o volume útil do reservatório elevado CETESB (1987). De R$ 26.191,71/mês para o volume útil do reservatório elevado NBR 12.217 (1994). E para o Método proposto por Gomes (2012) resultou em despesa mensal de R$ 14.698,95/mês. Contudo, a utilização do volume útil do reservatório dimensionado pelo Método de Gomes foi cerca de 66,39% superior ao da NBR 12.217 (1994), cerca de 64,56% superior ao de projeto e 57,33% superior ao CETESB (1987). Desse modo, o maior valor do volume impactará no valor a ser investido para a implantação do reservatório elevado. Por essa razão, na pesquisa foi estudada a economia com despesa de energia elétrica ao longo de 10 anos. Assim, considerando o Método de Gomes (2012) estimou-se economia de R$ 1.379.131,30 (78,19%) em relação ao Método da NBR 12.217 (1994) e de R$ 1.399.789,40 (79,36%) em relação ao Método da CETESB (1987). / Determination of the useful volume of reservation for hydroenergetic efficiency in water supply systems. The research was carried out in the Guanabara, Ananindeua, Belém, Pará Pumping and Water Reservation System. For this, the Guanabara Sector's design and operational conditions were verified for hydroenergetic performance evaluation. In the second step three (3) useful theoretical reservation volumes were determined, considering different methods. In the third stage, considering four (4) different useful project volumes and three (3) theoretical, hydroenergetic simulations were performed to verify the most efficient useful volume in hydroenergetic terms. For that, the same consumption curve and mean pumping rate were considered, but different useful volumes in the simulations. In the research it was verified that the useful volume of the high reservoir of the Guanabara Sector does not allow the reduction of water pumping at peak hours, which, naturally, influences the value of electric energy expenditure and that the high reservoir was being used as " junction box". Thus, three alternatives were studied to modify the current operating situation of the Guanabara Sector Reservation Unit, aiming at reducing electricity consumption and expenditure. In the sizing of the useful volumes by the 3 methods studied, 808.96 m³ were obtained with the CETESB Method (1987), 936.77 m³ with the procedures recommended in NBR 12.217 (1994) and 1.411,10 m³ when the proposed method was used by Gomes (2012). In the simulations carried out in Epanet 2.0 resulted in an electric energy expense of R$ 25.789,54/month for the useful volume of the projected high reservoir. From R$ 26.363,87/month for the useful volume of the high reservoir CETESB (1987). From R$ 26.191,71/month to the useful volume of the high reservoir NBR 12.217 (1994). And for the method proposed by Gomes (2012) resulted in monthly expenses of R$ 14.698,95/month. However, the utilization of the useful volume of the reservoir as measured by the Gomes Method was about 66,39% higher than that of NBR 12.217 (1994), about 64,56% higher than that of the project and 57,33% higher than CETESB (1987). In this way, the higher value of the volume will impact the value to be invested for the implantation of the raised reservoir. For this reason, in the research was studied the economy with expenditure of electric energy over 10 years. Accordingly, considering the Gomes Method (2012), savings of R $ 1.379.131,30 (78,19%) were estimated in relation to NBR 12.217 (1994) and R $ 1.399.789,40 (79,36%) in relation to the CETESB Method (1987).
|
2 |
Modelagem da degradação de cloro residual livre na rede de distribuição de água da cidade de Campina Grande – PB.SANTOS, Whelton Brito dos. 20 March 2018 (has links)
Submitted by Dilene Paulo (dilene.fatima@ufcg.edu.br) on 2018-03-20T15:47:53Z
No. of bitstreams: 1
WHELTON BRITO DOS SANTOS– DISSERTAÇÃO PPGECA 2017.pdf: 2787950 bytes, checksum: 176fe1aec4e0f28aec671343bd1e4daf (MD5) / Made available in DSpace on 2018-03-20T15:47:53Z (GMT). No. of bitstreams: 1
WHELTON BRITO DOS SANTOS– DISSERTAÇÃO PPGECA 2017.pdf: 2787950 bytes, checksum: 176fe1aec4e0f28aec671343bd1e4daf (MD5)
Previous issue date: 2017-03-14 / A qualidade sanitária da água é assegurada na etapa de desinfecção do processo de tratamento. No Brasil a Portaria 2.914/2011 do Ministério da Saúde, que dispõe sobre os procedimentos de controle e de vigilância da qualidade da água para consumo humano e seu padrão de potabilidade recomenda residual mínimo de cloro livre de 0,2mgCl2/L, máximo de 2,0mgCl2/L e valor máximo permitido de 5,0mgCl2/L que devem ser assegurados na rede de distribuição. Devido a fatores como, idade das tubulações, vazamentos, material, diâmetro e longas distâncias entre os sistemas de tratamento e os centros de consumo, nem sempre as concentrações recomendadas de cloro residual livre são mantidas em todos os pontos da rede de distribuição de água. Este trabalho tem como objetivo modelar o decaimento do cloro residual livre na rede de distribuição da cidade de Campina Grande, Paraíba, através da determinação dos coeficientes cinéticos de degradação da concentração de cloro residual livre no volume do escoamento (kb), pelo teste da garrafa, e na parede das tubulações (kw), pelo método da tentativa e erro. Como ferramenta de modelagem foi utilizado o EPANET 2.0. A área de estudo desta pesquisa foi a rede de distribuição do bairro da Prata, localizada na zona de pressão B. Este bairro foi escolhido por apresentar rede diversificada, com tubulações de PVC e cimento amianto sendo sua rede de distribuição abastecida pelo reservatório R5 .Com os resultados obtidos foi possível concluir que o decaimento do cloro residual livre na rede de distribuição do bairro da Prata ocorre por reações no volume do escoamento, os valores de kb são elevados nos trechos de ponta de rede e a degradação mais intensa da concentração de cloro residual livre ocorre devido à estagnação da água nas tubulações. / The sanitary quality of the water is assured in the disinfection step of the treatment process. In Brazil Ordinance 2.914/2011 of the Ministry of Health, which regulates the procedures for controlling and monitoring water quality for human consumption and its potability water standard, recommends a minimum free chlorine residual of 0,2mgCl2/L, maximum of 2,0mgCl2/L and the maximum permitted value of 5,0mgCl2/L that must be ensured in the distribution network. Due to factors such as age of pipes, leaks, material, diameter and long distances between treatment systems and consumption centers, the recommended concentrations of free residual chlorine are not always maintained at all points in the water distribution network. This study aims to model the decay of free residual chlorine in the distribution network of the city of Campina Grande, Paraiba, by determining the residual chlorine concentration degradation kinetic free coefficients in the flow volume (kb) by the bottle test and in the wall of the pipes (kw) by the trial and error method. As a modeling tool was used EPANET 2.0. The study area of this research was the distribution network of the district of Prata, located in zone of pressure B. This local was chosen for presenting a diversified network, PVC pipes and asbestos cement being its distribution network supplied by the reservoir R5. With the results was concluded that the decay of the free residual chlorine in the distribution network of the district of Prata occurs by reactions in the volume of the flow, the values of kb are high in the sections of the network and the degradation more intense concentration of free chlorine residual occurs due to stagnation of water in the pipes.
|
3 |
Studie propojení skupinových vodovodů Lanškroun a Letohrad / Study of Interconnection of Lanškroun and Letohrad Water Distribution SystemsKubešová, Kateřina January 2020 (has links)
This diploma thesis describes study of interconnection of Letohrad and Lanškroun water distribution systems. The thesis contains an overview of legislative regulations and technical standards related to the construction, design and directional solution of water supply systems. Following that, there is the description of the current state of the affected water mains. Next part is the design of interconnection including hydraulic analysis in using Epanet 2.0 software. The study contains several variants of the solution. The economic assessment is included.
|
Page generated in 0.0226 seconds