11 |
Perfil do trabalhador da construção civil da região metropolitana de Belém - PA / Civil construction worker profile in the metropolitan region of Belém-PASOUZA, Lourdes Oliveira e 17 March 2017 (has links)
Submitted by Ivone Costa (mivone@ufpa.br) on 2018-05-18T15:46:14Z
No. of bitstreams: 2
license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5)
Dissertação_PerfilTrabalhadorConstrução.pdf: 1677140 bytes, checksum: 3310a99ce01c995d9ae4c5fd0ffb72fe (MD5) / Approved for entry into archive by Ivone Costa (mivone@ufpa.br) on 2018-05-18T15:47:56Z (GMT) No. of bitstreams: 2
license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5)
Dissertação_PerfilTrabalhadorConstrução.pdf: 1677140 bytes, checksum: 3310a99ce01c995d9ae4c5fd0ffb72fe (MD5) / Made available in DSpace on 2018-05-18T15:47:57Z (GMT). No. of bitstreams: 2
license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5)
Dissertação_PerfilTrabalhadorConstrução.pdf: 1677140 bytes, checksum: 3310a99ce01c995d9ae4c5fd0ffb72fe (MD5)
Previous issue date: 2017-03-17 / A construção civil tem suma importância no desenvolvimento de uma região, criando
vários postos de trabalho que, quando bem relacionados, geram o produto final com
qualidade. Sua mão de obra geralmente é pouco qualificada em termos de estudos,
discriminada e desvalorizada. Além disso, destacam-se ainda as altas taxas de acidentes
relacionados à atividade laboral e seus efeitos que afetam não apenas os trabalhadores, mas
seus familiares e à empresa. Para conhecer essa mão de obra, o presente estudo teve como
objetivo principal traçar o perfil do trabalhador da construção civil da Região Metropolitana
de Belém-PA, através de um estudo de caso com aplicação de questionário, dividido em 3
tópicos importantes: pessoal, socioeconômico e conhecimentos profissionais, aplicado a 450
trabalhadores em diversos canteiros de obras de 12 empresas da indústria da construção civil.
Como principais resultados, obteve-se que 32,0% têm o ensino médio completo, 86,0%
recebem até 2 salários mínimos, 32,9% estão na indústria da construção civil entre 2 e 5
anos, 69,0% possuem casa própria e 61,8%, sentem dores, principalmente nas costas, lombar
e braços. Esta pesquisa servirá de incentivo para a realização de novos estudos em
qualificação e segurança do trabalho, relacionados à satisfação e melhoria das condições de
vida desses trabalhadores, aumento da produtividade e redução de custos para a empresa. / The civil construction has great importance in development of a region, creating
several workstations that, when well connected, generate the final product with quality. Its
labour is generally low-qualified in study terms, discriminated and devalued. Besides, we
also highlighted the high accident rates related to labor activity and their affects affect not
only the workers, but their families and the company. In order to know that labour, this
present study had as main objective to trace the worker’s profile of the civil construction in
the Belém Metropolitan Region (PA), through a case study with applying a questionnaire,
divided in 3 important topics: personal, socioeconomic and professional knowledge, applied
to 450 workers in several construct sites of 12 companies of civil construction’s industry. As
main results, obtained that 32,0% have completed high school, 86,0% receive up 2 minimum
wage, 32,9% are at civil construction’s industry between 2 and 5 years, 69,0% have own
houses and 61,8% feel pains, mainly in the backs, lumbar and arms. This research will serve
as an incentive for the realization of new studies in qualification and workplace safety,
associated to satisfaction and improving people's living conditions of these workers,
increasing in productivity and reduction of costs for the company.
|
12 |
Análise experimental de pisos mistos de madeira e concreto de pós-reativos (CPR) / experimental analysis of mixed floors of wood and concrete reactive powdersBRITTO, Raimundo Angelo de Lima 20 December 2016 (has links)
Submitted by Kelren Mota (kelrenlima@ufpa.br) on 2018-05-21T19:06:23Z
No. of bitstreams: 2
license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5)
Dissertacao_AnaliseExperimentalPisos.pdf: 5727840 bytes, checksum: 60ce92a81721ca408b5ebaf7fdc7885a (MD5) / Approved for entry into archive by Kelren Mota (kelrenlima@ufpa.br) on 2018-05-21T19:10:57Z (GMT) No. of bitstreams: 2
license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5)
Dissertacao_AnaliseExperimentalPisos.pdf: 5727840 bytes, checksum: 60ce92a81721ca408b5ebaf7fdc7885a (MD5) / Made available in DSpace on 2018-05-21T19:10:57Z (GMT). No. of bitstreams: 2
license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5)
Dissertacao_AnaliseExperimentalPisos.pdf: 5727840 bytes, checksum: 60ce92a81721ca408b5ebaf7fdc7885a (MD5)
Previous issue date: 2016-12-20 / As estruturas de piso misto de madeira e concreto já algum tempo fazem parte do contexto construtivo pelo mundo, sendo empregadas principalmente na recuperação de pisos antigos de madeira em residências uni ou multi familiares, principalmente em países da Europa e da America do Norte, são usadas também em estruturas de pontes e passarelas ao ar livre pois a placa de concreto protege a madeira das intempéries, radiações solares entre outros. Vários fatores contribuem a favor do uso deste tipo de estrutura em residências, entre eles destacam-se: o custo bem mais barato que a construção convencional em concreto armado, a leveza arquitetônica do arranjo, com as peças de madeira aparentes envernizadas e laje pintada, proporcionando um acabamento muito bom, o isolamento térmico e acústico se tomarmos como referencia os pisos somente de madeira. Este trabalho ressalta o uso de madeiras de reflorestamento no Brasil, sendo escolhida por sua beleza e resistência a Tectona Grandis (TECA), e para a laje que compõem a mesa escolhemos um concreto de pós-reativos, onde alguns agregados são subprodutos das indústrias de papel e vidro. A geometria traçada para laje foi delineada em busca de se ter o melhor arranjo estrutural, aliado ao bom efeito arquitetônico. As expressões para cálculo do piso misto madeira-concreto estão fundamentadas nas equações de equilíbrio e nos preceitos da EUROCODE 5 os parâmetros para verificação e segurança seguem os preceitos da NBR 7190/97, NBR 6118/14 da própria EUROCODE 5. Os resultados apresentados demonstram que há diferenças entre os métodos de cálculo analítico e de elementos finitos (SAP 2000), os resultados entre estes modelos tiveram diferenças quanto ao modelo
experimental, às medições realizadas mostraram uma rigidez efetiva bem mais elevada que as apresentadas nos dois modelos citados anteriormente. Concluímos então, que os módulos de elasticidade dos materiais e o módulo de deslizamento devem ser ensaiados para que haja uma proximidade com resultados experimentais. Os resultados obtidos no modelo experimental nos mostra ótima rigidez, os fatores de segurança quanto aos EL Último e de utilização, foram atendidos o custo final da montagem mesmo com a utilização do concreto de pós-reativos ficou mais baixo que o custo de uma estrutura convencional, assim podemos denotar que as estruturas de concreto-madeira apresentam ótimas condições de emprego em construções e reformas, sendo de suma importância o incentivo e a continuidade dessa técnica construtiva. / Mixed timber and concrete structures have long been part of the constructive context around the world, and are mainly used for the recovery of old wooden floors in single or multi-family dwellings, mainly in European and North American countries, are used Also in structures of bridges and walkways in the open air since the concrete plate protects the wood from the elements, solar radiation among others. Several factors contribute to the use of this type of structure in homes, among them the following: the cost much cheaper than the conventional construction in reinforced concrete, the architectural lightness of the arrangement, with the apparent varnished wood and painted slabs, Providing a very good finish, thermal and acoustic insulation if we take as a reference the only wooden floors. This work highlights the use of wood from reforestation in Brazil, being chosen for its beauty and resistance to Tectona Grandis (TECA), and for the slab that compose the table we chose a concrete of post reactive, where some aggregates are by-products of the industries of Paper and glass. The geometry drawn for slab was outlined in search of having the best structural arrangement, combined with the good architectural effect. The expressions for calculating the mixed wood-concrete floor are based on the equilibrium equations and the precepts of EUROCODE 5, the parameters for verification and safety follow the precepts of NBR 7190/97, NBR 6118/14 of EUROCODE 5 itself. The results show that there are significant differences between the analytical and finite element methods (SAP 2000), the results between these models had significant differences, as far as the experimental model, the measurements performed showed a much higher stiffness than those presented In the two models mentioned above. We conclude that the elasticity moduli of the materials and the sliding modulus must be tested in order to be close to experimental results. The results obtained in the experimental model showed us excellent rigidity, the safety factors regarding the EL and final use were met the final cost of assembly even with the use of the post-reactive concrete was lower than the cost of a conventional structure , Thus we can denote that the concrete-wood structures present great conditions of use in constructions and reforms, being of the utmost importance the incentive and the continuity of this constructive technique.
|
13 |
Análise de risco de cumprimento de prazo de construção comercial / Analysis of risk of compliance with commercial construction deadlineBATISTA, Amanda Cremilda Lima 25 May 2018 (has links)
Submitted by Kelren Mota (kelrenlima@ufpa.br) on 2018-09-03T16:53:53Z
No. of bitstreams: 2
license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5)
Dissertacao_AnaliseRiscoCumprimento.pdf: 1981312 bytes, checksum: 4341a64a4ab7d05b541d9bde3695a34c (MD5) / Approved for entry into archive by Kelren Mota (kelrenlima@ufpa.br) on 2018-09-03T16:54:25Z (GMT) No. of bitstreams: 2
license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5)
Dissertacao_AnaliseRiscoCumprimento.pdf: 1981312 bytes, checksum: 4341a64a4ab7d05b541d9bde3695a34c (MD5) / Made available in DSpace on 2018-09-03T16:54:25Z (GMT). No. of bitstreams: 2
license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5)
Dissertacao_AnaliseRiscoCumprimento.pdf: 1981312 bytes, checksum: 4341a64a4ab7d05b541d9bde3695a34c (MD5)
Previous issue date: 2018-05-25 / A construção civil é caracterizada pela sua complexidade e incerteza, pois os seus processos ocorrem de forma simultânea e interdependente, inseridos em um ambiente dinâmico, não-linear e imprevisível. Tornando-se necessário durante todo o ciclo de vida uma avaliação e gestão dos fatores de risco, possibilitando assim a elaboração das estratégias de prevenção e oportunidades. Logo, esta pesquisa teve como objetivo a avaliação probabilística dos riscos nos prazos de um empreendimento de construção vertical, localizado no município de Belém/Pa. Cujo objetivo estratégico das partes interessadas era a conclusão da obra no período de 15 meses e uma previsão de custos diretos e indiretos de R$ 8.808.614,04. Desta forma, a probabilidade de o projeto ocorrer no prazo desejado (15 meses), foi avaliado através de duas redes PERT/CPM, denominadas de cenário 01 e cenário 02. Sendo que o cenário 01 foi desenvolvido considerando o período de 15 meses e o cenário 02 desenvolvido de acordo com as tabelas de composição unitárias de prazo e custos, sendo este denominado de cenário pessimista da obra. Assim, o resultado da avaliação demonstrou que o projeto apresentava uma probabilidade 76,79% de ocorrer em 22 meses, com um possível aumento orçamentário de 35,18%, ficando próximo dos R$ 11.907.293,46. Portanto, a metodologia PERT/CPM se demonstre satisfatória, pois aos objetivos desta pesquisa foram alcançados. No entanto, a rede é incompatível com a realidade contextual do projeto, haja vista que os projetos de construção apresentam outras variáveis em interação que influenciam o tempo e os custos e que são impossíveis de serem avaliadas com a rede PERT/CPM. / Civil construction is characterized by its complexity and uncertainty, because its processes occur simultaneously and interdependently, inserted in a dynamic, non-linear and unpredictable environment. It is necessary throughout the life cycle an evaluation and management of the risk factors, thus enabling the elaboration of prevention strategies and opportunities. Therefore, this research had as objective the probabilistic evaluation of the risks in the terms of a vertical construction project, located in the city of Belém / Pa. The strategic objective of the stakeholders was the completion of the work in the 15-month period and a forecast of direct and indirect costs of R $ 8,808,614.04. In this way, the probability of the project to occur within the desired period (15 months) was evaluated through two PERT / CPM networks, called scenario 01 and scenario 02. Given that scenario 01 was developed considering the 15-month period and scenario 02 developed according to the unit composition tables of term and costs, which is called the pessimistic scenario of the work. Thus, the results of the evaluation showed that the project had a 76.79% probability of occurring in 22 months, with a possible budget increase of 35.18%, close to R $ 11,907,293.46. Therefore, the PERT / CPM methodology is satisfactory, since the objectives of this research were achieved. However, the network is incompatible with the contextual reality of the project, since construction projects have other interacting variables that influence time and costs and are impossible to evaluate with the PERT / CPM network.
|
Page generated in 0.0229 seconds