Spelling suggestions: "subject:"economics anda most 2analysis"" "subject:"economics anda most 3analysis""
1 |
An empirical comparison of design/build and design/bid/build project delivery methodsHale, Darren Russell. 08 1900 (has links)
This thesis project compares the performance of a homogeneous sample of United States Navy Bachelor Enlisted Quarters built using the Military Construction process. Projects will be broken into two sub-samples of design/bid/build and design/build projects to see if one project delivery method is superior in regards to time and cost. Project duration, project duration per bed, project time growth, cost growth and cost per bed will be statistically compared. Upon completion of the analysis the hypothesis that design/build projects are superior to design/bid/build projects in regards to time and cost will be tested. / Contract number: N62271-97-G-0073.
|
2 |
An Analysis of the Marine Corps Enlistment Bonus Program.Ramsey, Billy H. 2008 March 1900 (has links)
Thesis (Master').
|
3 |
China's modus operandi for the 21st CenturyPorter, Anthony G. January 2005 (has links)
Thesis (Master of Military Studies)-Marine Corps Command and Staff College, 2005. / Title from title page of PDF document (viewed on: Jan 6, 2010). "CSC 2005" "Subject Area Topical Issues" Includes bibliographical references.
|
4 |
Arab-Byzantine War, 629-644 ADKunselman, David E. January 2007 (has links)
Thesis (Master of Military Art and Science)-Army Command and General Staff College, 2007. / Title from title page of PDF document (viewed on: Jan 12, 2010). Includes bibliographical references.
|
5 |
Calculation of the actual cost of engine maintenanceEzik, Oguz. January 2003 (has links)
Thesis (M.S.)--Air Force Institute of Technology, 2003. / Title from title screen (viewed July 1, 2004). "March 2003." Vita. "AFIT/GOR/ENS/03-06." "ADA412960"--URL. Includes bibliographical references (p. 87-90). Also issued in paper format.
|
6 |
Developing cost per flying hour factors for the operations and maintenance phase of the satellite life cycleKimbrough, Anthony K. January 2003 (has links)
Thesis (M.S.)--Air Force Institute of Technology, 2003. / Title from title screen (viewed July 1, 2004). "March 2003." Vita. "AFIT/GCA/ENV/03-04." "ADA415257"--URL. Includes bibliographical references (p. 71-74). Also issued in paper format.
|
7 |
An analysis of Department of Defense Business Systems modernization efforts and recommendations for improving the processGuerra, Elizabeth A. Nicholas, Joseph E. Scott, Corey L. January 1900 (has links) (PDF)
Thesis (Master of Business Administration) -- Naval Postgraduate School, 2005. / Title from title screen (viewed Aug. 26, 2008). "December 2005." The original document contains color images. "ADA443358"--URL. Includes bibliographical references (p. 85-91). Also issued in paper format.
|
Page generated in 0.0729 seconds