• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 3
  • 1
  • Tagged with
  • 4
  • 4
  • 4
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Desenvolvimento de um método para o planejamento da inspeção de equipamentos

Teles, Camila Duarte January 2007 (has links)
Este trabalho tem como objetivo desenvolver um método para o planejamento da inspeção de equipamentos instalados em grandes quantidades e em extensas áreas geográficas. Para tanto, a dissertação apresenta inicialmente tópicos referentes a amostragem, que constitui a base do método desenvolvido, e inspeção de produtos e equipamentos. O método proposto é dividido em três fases, as quais são subdivididas em etapas que apresentam as atividades a serem realizadas. A Fase 1 denomina-se elaboração da matriz amostral e visa identificar quais e quantos equipamentos devem ser inspecionados. A Fase 2, intitulada distribuição da matriz amostral no tempo, tem como objetivo determinar quando os equipamentos devem ser inspecionados. A Fase 3, designada alocação dos recursos humanos para execução da matriz amostral, visa estabelecer quem deve inspecionar os equipamentos. Após seu desenvolvimento, o método foi aplicado em uma empresa do setor de distribuição de energia elétrica, para auxiliar no planejamento da inspeção de seus medidores de energia elétrica. Por fim, realizou-se a avaliação do método, através de entrevistas individuais com três especialistas da empresa. De acordo com os mesmos, o método é exeqüível, fácil de ser aplicado e possivelmente será implantado na empresa. Além disso, soluciona, se implantado, o problema referente ao desconhecimento do desempenho dos medidores instalados em seu parque de medição, que têm impacto direto sobre o faturamento da empresa. / The objective of this work is to develop a method for the inspection planning of equipments installed at great quantity and extensive geographical areas. Initially, some topics regarding sampling, which constitutes the base of the developed method, and inspection of products and equipment are presented. The proposed method is divided in three phases, which are subdivided in stages that present the activities to be accomplished. Phase 1 is called elaboration of the sampling matrix, aiming the identification of the equipments to be inspected. Phase 2, named time distribution of the sampling matrix, determines when the equipment must be inspected. Phase 3, designated allocation of the human resources for execution of the sampling matrix, establishes who must inspect the equipments. After development, the method was applied at a company of electric power distribution segment, to assist the inspection planning of its electric energy meters. Finally, the method evaluation was carried out, through individual interviews, considering the opinion of three specialists of the company. According to the specialists, the method is feasible, easy to apply, and possibly it will be implanted by the company. Besides, if implanted, it solves the problem regarding the lack of knowledge concerning the meters installed in its concession area, which have direct impact on companies´ budget.
2

Desenvolvimento de um método para o planejamento da inspeção de equipamentos

Teles, Camila Duarte January 2007 (has links)
Este trabalho tem como objetivo desenvolver um método para o planejamento da inspeção de equipamentos instalados em grandes quantidades e em extensas áreas geográficas. Para tanto, a dissertação apresenta inicialmente tópicos referentes a amostragem, que constitui a base do método desenvolvido, e inspeção de produtos e equipamentos. O método proposto é dividido em três fases, as quais são subdivididas em etapas que apresentam as atividades a serem realizadas. A Fase 1 denomina-se elaboração da matriz amostral e visa identificar quais e quantos equipamentos devem ser inspecionados. A Fase 2, intitulada distribuição da matriz amostral no tempo, tem como objetivo determinar quando os equipamentos devem ser inspecionados. A Fase 3, designada alocação dos recursos humanos para execução da matriz amostral, visa estabelecer quem deve inspecionar os equipamentos. Após seu desenvolvimento, o método foi aplicado em uma empresa do setor de distribuição de energia elétrica, para auxiliar no planejamento da inspeção de seus medidores de energia elétrica. Por fim, realizou-se a avaliação do método, através de entrevistas individuais com três especialistas da empresa. De acordo com os mesmos, o método é exeqüível, fácil de ser aplicado e possivelmente será implantado na empresa. Além disso, soluciona, se implantado, o problema referente ao desconhecimento do desempenho dos medidores instalados em seu parque de medição, que têm impacto direto sobre o faturamento da empresa. / The objective of this work is to develop a method for the inspection planning of equipments installed at great quantity and extensive geographical areas. Initially, some topics regarding sampling, which constitutes the base of the developed method, and inspection of products and equipment are presented. The proposed method is divided in three phases, which are subdivided in stages that present the activities to be accomplished. Phase 1 is called elaboration of the sampling matrix, aiming the identification of the equipments to be inspected. Phase 2, named time distribution of the sampling matrix, determines when the equipment must be inspected. Phase 3, designated allocation of the human resources for execution of the sampling matrix, establishes who must inspect the equipments. After development, the method was applied at a company of electric power distribution segment, to assist the inspection planning of its electric energy meters. Finally, the method evaluation was carried out, through individual interviews, considering the opinion of three specialists of the company. According to the specialists, the method is feasible, easy to apply, and possibly it will be implanted by the company. Besides, if implanted, it solves the problem regarding the lack of knowledge concerning the meters installed in its concession area, which have direct impact on companies´ budget.
3

Desenvolvimento de um método para o planejamento da inspeção de equipamentos

Teles, Camila Duarte January 2007 (has links)
Este trabalho tem como objetivo desenvolver um método para o planejamento da inspeção de equipamentos instalados em grandes quantidades e em extensas áreas geográficas. Para tanto, a dissertação apresenta inicialmente tópicos referentes a amostragem, que constitui a base do método desenvolvido, e inspeção de produtos e equipamentos. O método proposto é dividido em três fases, as quais são subdivididas em etapas que apresentam as atividades a serem realizadas. A Fase 1 denomina-se elaboração da matriz amostral e visa identificar quais e quantos equipamentos devem ser inspecionados. A Fase 2, intitulada distribuição da matriz amostral no tempo, tem como objetivo determinar quando os equipamentos devem ser inspecionados. A Fase 3, designada alocação dos recursos humanos para execução da matriz amostral, visa estabelecer quem deve inspecionar os equipamentos. Após seu desenvolvimento, o método foi aplicado em uma empresa do setor de distribuição de energia elétrica, para auxiliar no planejamento da inspeção de seus medidores de energia elétrica. Por fim, realizou-se a avaliação do método, através de entrevistas individuais com três especialistas da empresa. De acordo com os mesmos, o método é exeqüível, fácil de ser aplicado e possivelmente será implantado na empresa. Além disso, soluciona, se implantado, o problema referente ao desconhecimento do desempenho dos medidores instalados em seu parque de medição, que têm impacto direto sobre o faturamento da empresa. / The objective of this work is to develop a method for the inspection planning of equipments installed at great quantity and extensive geographical areas. Initially, some topics regarding sampling, which constitutes the base of the developed method, and inspection of products and equipment are presented. The proposed method is divided in three phases, which are subdivided in stages that present the activities to be accomplished. Phase 1 is called elaboration of the sampling matrix, aiming the identification of the equipments to be inspected. Phase 2, named time distribution of the sampling matrix, determines when the equipment must be inspected. Phase 3, designated allocation of the human resources for execution of the sampling matrix, establishes who must inspect the equipments. After development, the method was applied at a company of electric power distribution segment, to assist the inspection planning of its electric energy meters. Finally, the method evaluation was carried out, through individual interviews, considering the opinion of three specialists of the company. According to the specialists, the method is feasible, easy to apply, and possibly it will be implanted by the company. Besides, if implanted, it solves the problem regarding the lack of knowledge concerning the meters installed in its concession area, which have direct impact on companies´ budget.
4

Měřič elektrické energie s podporou automatického dálkového sběru / Electric energy meter with support of automatic remote acquisition

Skala, Milan January 2013 (has links)
This master’s thesis deals with design and implementation of electric energy meter with support of automatic remote data collection. For the collecting of measured data is used narrowband PLC technology. The theoretical part describes the basic properties and standards of narrowband PLC technology, such as types of coupling circuits, modulations, frequency bands and interference problems. In the practical part, there is description of selected parts, such as control circuit power meter, modem, microcontroller and UART to USB converter. There are further described basic properties of narrowband PLC modem ST7570 by STMicroelectronics. The final chapter, implementation of the device, deals with designs of circuit PLC modem ST7570, power meter ADE7753 and converter USB to UART CP2102.

Page generated in 0.0868 seconds