Spelling suggestions: "subject:"alectric powerplants cachine learning."" "subject:"alectric powerplants amachine learning.""
1 |
Symbolic and connectionist machine learning techniques for short-term electric load forecasting /Rajagopalan, Jayendar, January 1993 (has links)
Thesis (M.S.)--Virginia Polytechnic Institute and State University, 1993. / Vita. Abstract. Includes bibliographical references (leaves 108-110). Also available via the Internet.
|
Page generated in 0.1075 seconds