1

Matrizes de transformação reais aplicadas as linhas de transmissão de circuito duplo / Silgle real transformation matrices applied to double trhee-phase transmission lines

Campos, Jose Carlos da Costa 07 February 2009 (has links)
Orientadores: Jose Pissolato Filho, Afonso Jose do Prado / Tese (doutorado) - Universidade Estadual de Campinas, Faculdade de Engenharia Eletrica e de Computação / Made available in DSpace on 2018-08-14T11:17:10Z (GMT). No. of bitstreams: 1 Campos_JoseCarlosdaCosta_D.pdf: 4388913 bytes, checksum: c565c846bae4e32b03dcef712a2494df (MD5) Previous issue date: 2009 / Resumo: As matrizes de transformação reais e constantes são aplicadas como matrizes de transformação fase-modo características de um sistema simétrico com circuito trifásico duplo transposto e de duas linhas de transmissão paralelas transpostas com circuito trifásico duplo. Essas matrizes de transformação reais e constantes são baseadas na matriz de Clarke. Usando a combinação linear dos elementos da matriz de Clarke, as técnicas aplicadas para linhas trifásicas simples são ampliadas para sistemas com 6 e 12 condutores de fase. Para uma linha trifásica dupla transposta, as matrizes Z e Y são convertidas em matrizes diagonais no domínio dos modos. Considerando um caso não transposto de uma linha trifásica dupla, os resultados não são exatos e as análises de erros são realizadas mediante os autovalores. No caso de duas linhas trifásicas paralelas duplas e transpostas, a matriz de transformação exata com elementos reais e constantes não foi obtida ainda. Para esse caso, como sugestão para desenvolvimento futuro, a determinação da matriz de transformação modal real e constante provavelmente deverá ser baseada em uma única referência homopolar. Tal sugestão se deve ao fato de que, neste trabalho, a estrutura das matrizes de transformação utilizadas tem como base a aplicação do modo homopolar como única referência homopolar para todos condutores de fase do sistema estudado. / Abstract: Single real transformation matrices are applied as phase-mode transformation matrices of typical symmetrical systems with double three-phase and two parallel double three-phase transmission lines. These single real transformation matrices are achieved from eigenvector matrices of the mentioned systems and they are based on Clarke's matrix. Using linear combinations of the Clarke's matrix elements, the techniques applied to the single three-phase lines are extended to systems with 6 or 12 phase conductors. For transposed double three-phase lines, phase Z and Y matrices are changed into diagonal matrices in mode domain. Considering non-transposed cases of double three-phase lines, the results are not exact and the error analyses are performed using the eigenvalues. In case of two parallel double three-phase lines, the exact single real transformation matrix has not been obtained yet. Probably, for two parallel double three-phase lines, considering future development and searching for the exact single real transformation matrix, the analyses are based on a single homopolar reference. This suggestion is related to that in the all analyses carried out in this work, the homopolar mode is used as the only homopolar reference for all phase conductors of the studied system. / Doutorado / Energia Eletrica / Doutor em Engenharia Elétrica
2

Licenciamento ambiental: acompanhamento de implantação de linhas de transmissão no Estado de São Paulo / Environmental Permit: São Paulos Eletric Transmission Lines Construction Follow Up

Sugawara, Tania Regina Sano 21 June 2016 (has links)
O licenciamento ambiental de linhas de transmissão no Estado de São Paulo é conduzido pela Companhia Ambiental do Estado de São Paulo (CETESB), com uso dos princípios da Avaliação de Impacto Ambiental (AIA). Na fase de planejamento dos projetos de Linhas de Transmissão (LTs), isto é, etapa de obtenção da Licença Ambiental Prévia, são estimados os impactos ambientais da implantação e operação do empreendimento, bem como as medidas mitigadoras ou minimizadoras destes impactos. Nas fases de instalação e operação de LTs ocorre a intervenção ambiental de fato. São implementadas e acompanhadas as medidas propostas pela AIA. O acompanhamento ambiental de empreendimentos licenciados com AIA é feito com base nas exigências expressas nas licenças emitidas e uso de vistorias técnicas. Dentre as exigências expressas nas licenças ambientais de LTs, destacam-se a elaboração de relatórios de acompanhamento das obras. Tais relatórios são elaborados pelo empreendedor responsável pela LT ou consultoria contratada pelo mesmo. Este projeto propõe um procedimento para acompanhamento ambiental de linhas de transmissão em licenciamento na CETESB, composto por Termo de Referência do Acompanhamento Ambiental das Obras de Linha de Transmissão e checklist para uso dos empreendedores e suas consultorias responsáveis pela elaboração dos relatórios de acompanhamento das obras e da operação e manutenção das linhas de transmissão. / Environmental permit for eletric transmission lines in the State of São Paulo is conducted by Companhia Ambiental do Estado de São Paulo (CETESB), using the principles of Environmental Impact Assessment (EIA). In the planning phase of the transmission lines projects, meaning, the phase of Preliminary Environmental Permit analisys, the environmental impacts of the implementation and operation of the aactivity are estimated, as well as mitigation our minimization measures. At the phases of installation and operation of transmission lines, occurs the environmental intervention itself. The minimization and mitigation measures estimated on the EIA are implemented and monitored. EIA follow up is based on the requirements expressed in the permits and technical inspections. Among the requirements set out in the environmental permits of transmission lines, highlight the construction environmental follow up reports. These reports are managed by the company responsible for the transmission line or consultant hired by it. This project proposes a procedure for environmental follow up of transmission lines in CETESBs permit process, composed by a Guideline for Transmission Line Construction Environmental Follow Up and a checklist meant to be applied by the company and their consultants responsible for that activity. The outcome expected are monitoring reports with standardized format and efficient information for the analysis of the technical team responsible for the CETESB permiting process. The construction of the proposed products was based on the literature review, documentary review and field observation and in a second stage, the development of pilot products, tests, interviews and construction of the final version.
3

Licenciamento ambiental: acompanhamento de implantação de linhas de transmissão no Estado de São Paulo / Environmental Permit: São Paulos Eletric Transmission Lines Construction Follow Up

Tania Regina Sano Sugawara 21 June 2016 (has links)
O licenciamento ambiental de linhas de transmissão no Estado de São Paulo é conduzido pela Companhia Ambiental do Estado de São Paulo (CETESB), com uso dos princípios da Avaliação de Impacto Ambiental (AIA). Na fase de planejamento dos projetos de Linhas de Transmissão (LTs), isto é, etapa de obtenção da Licença Ambiental Prévia, são estimados os impactos ambientais da implantação e operação do empreendimento, bem como as medidas mitigadoras ou minimizadoras destes impactos. Nas fases de instalação e operação de LTs ocorre a intervenção ambiental de fato. São implementadas e acompanhadas as medidas propostas pela AIA. O acompanhamento ambiental de empreendimentos licenciados com AIA é feito com base nas exigências expressas nas licenças emitidas e uso de vistorias técnicas. Dentre as exigências expressas nas licenças ambientais de LTs, destacam-se a elaboração de relatórios de acompanhamento das obras. Tais relatórios são elaborados pelo empreendedor responsável pela LT ou consultoria contratada pelo mesmo. Este projeto propõe um procedimento para acompanhamento ambiental de linhas de transmissão em licenciamento na CETESB, composto por Termo de Referência do Acompanhamento Ambiental das Obras de Linha de Transmissão e checklist para uso dos empreendedores e suas consultorias responsáveis pela elaboração dos relatórios de acompanhamento das obras e da operação e manutenção das linhas de transmissão. / Environmental permit for eletric transmission lines in the State of São Paulo is conducted by Companhia Ambiental do Estado de São Paulo (CETESB), using the principles of Environmental Impact Assessment (EIA). In the planning phase of the transmission lines projects, meaning, the phase of Preliminary Environmental Permit analisys, the environmental impacts of the implementation and operation of the aactivity are estimated, as well as mitigation our minimization measures. At the phases of installation and operation of transmission lines, occurs the environmental intervention itself. The minimization and mitigation measures estimated on the EIA are implemented and monitored. EIA follow up is based on the requirements expressed in the permits and technical inspections. Among the requirements set out in the environmental permits of transmission lines, highlight the construction environmental follow up reports. These reports are managed by the company responsible for the transmission line or consultant hired by it. This project proposes a procedure for environmental follow up of transmission lines in CETESBs permit process, composed by a Guideline for Transmission Line Construction Environmental Follow Up and a checklist meant to be applied by the company and their consultants responsible for that activity. The outcome expected are monitoring reports with standardized format and efficient information for the analysis of the technical team responsible for the CETESB permiting process. The construction of the proposed products was based on the literature review, documentary review and field observation and in a second stage, the development of pilot products, tests, interviews and construction of the final version.