• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 1
  • Tagged with
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Elkvalitetsövervakning i låg- och mellanspänningsnät / Power quality monitoring in low- and medium-voltage networks

Roger, Helleblad January 2021 (has links)
Krav på överföringen av el ställs i föreskrifter och standarder för att hålla störande elkvalitetsparametrar inom godtagbara nivåer i nätet. På senare år har användandet av elnätet förändrats med nya belastningar, distribuerad generering och en ökande mängd kraftelektronik. Detta bidrar till ett ökat behov att utföra kontinuerlig övervakning av parametrar som kan orsaka problem för kund och nätägare. I samband med installationen av de nya ”smarta elmätarna” hos kunder finns möjligheten att få utökad elkvalitetsövervakning i stora delar av nätet. Till följd av detta har Geab valt att se över sin elkvalitetsövervakning. I denna rapport ligger fokus på vilka parametrar som ska övervakas, var i nätet de ska övervakas och hur man kan bedriva detta effektivt med en bra täckning av nätet. Syftet med denna övervakning är primärt att verifiera att nätet uppfyller standard. Men andra fördelar finns, bland annat kan åtgärder vidtas i ett område innan gränsvärden överskrids. Det går även att använda utrustningen för störningsanalys. I denna rapport sammanställs vilka parametrar som ska övervakas och vilka krav som gäller för mätutrustning vid mätning av elkvalitet enligt standard och föreskrift. Förslag ges även på var och hur mätning kan utföras. Sju mätsystem har jämförts utifrån dessa parametrar. Baserat på resultatet rekommenderas att fasta mätare installeras i fördelningsstationer på nedsidan av mellanspänningstransformatorn, i kombination med smarta elmätare i nätstation och i anslutningspunkt mot kund i lågspänningsnät. Detta för att få en kostnadseffektiv täckning och hantering av elkvalitetsövervakning i nätet. På grund av det stora antalet mätinstrument bör övervakning av elkvaliteten ske med hjälp av gränsvärdesövervakning och automatiskt genererade rapporter. Detta minskar hanteringstid för personal då portabla mätare inte behöver monteras men även då systemet behandlar den insamlade informationen på egen hand. Eftersom gränsvärdesövervakning kan missa vissa avvikelser bör även stickprov utföras för att verifiera den automatiska övervakningen. / Requirements for the transmission of electricity are set in regulations and standards to keep disruptive power quality parameters in the grid within acceptable levels. In recent years, the use of the electrical grid has changed with new loads, distributed generation, and an increasing amount of power electronics. This contributes to an increased need to perform continuous monitoring of parameters that can cause problems for customers and network owners. With the installation of the new ”smart meters” at customers connection point, there is the possibility of having extended power quality monitoring in large parts of the network. As a result, Geab has chosen to review its power quality monitoring. This report focuses on which parameters are to be monitored, where to monitor and how this can be done effectively with good coverage of the network. The purpose of this monitoring is primarily to verify that the network meets the requirements. But there are other advantages, for example, steps can be taken before a limit value is exceeded in an area. It is also possible to use the equipment for analyzing disturbances. This report summarizes which parameters to monitor and which requirements apply to measuring equipment when measuring power quality in accordance with standards and regulations. Suggestions are also given on where and how measurement can be performed. Seven measurement systems have been compared based on these parameters. Based on the results, the recommendation is that fixed meters be installed in substations on the medium voltage side of the transformer, in combination with "smart meters" in distribution substations and at the connection point to the customer in the low voltage network. This will result in cost-effective coverage and management of power quality monitoring in the network. Due to a large number of measuring instruments, monitoring of power quality should take place with the help of automatic limit monitoring and automatically generated reports. This approach will give alarms/warnings if any parameter exceeds its limit. This reduces handling time for personnel as portable meters do not need to be installed but also when the system processes the collected information on its own. Since automatic detection of exceeded limit values may miss certain deviations, random sampling should be performed to verify the automatic monitoring.

Page generated in 0.0957 seconds