• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2
  • Tagged with
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Dynamic Modeling Of An Excavator During Digging And Simulating The Motion

Ozunlu, Ozcan Mutlu 01 January 2008 (has links) (PDF)
The aim of this study is to perform the dynamic force analysis of a 3-degrees-of-freedom excavator during digging the soil and to simulate the motion on computer screen. Standard load calculations are done statically, therefore the effects of forces changing with time on the system cannot be observed. The dynamic analysis method used in the thesis is Recursive Newton &ndash / Euler Method and the numerical analysis method for simulation is 4th Order Runge &ndash / Kutta Method. After this study, the effects of sudden velocity changes / i.e, accelerational movements on construction machines, positions of bodies and dynamic forces on joints will be appointed and it will be possible to plan and control the motion.
2

Dynamic modeling of an excavator during digging and simulating the motion

Ozunlu, Ozcan Mutlu 01 January 2008 (has links) (PDF)
The aim of this study is to perform the dynamic force analysis of a 3-degrees-of-freedom excavator during digging the soil and to simulate the motion on computer screen. Standard load calculations are done statically, therefore the effects of forces changing with time on the system cannot be observed. The dynamic analysis method used in the thesis is Recursive Newton &ndash / Euler Method and the numerical analysis method for simulation is 4th Order Runge &ndash / Kutta Method. After this study, the effects of sudden velocity changes / i.e, accelerational movements on construction machines, positions of bodies and dynamic forces on joints will be appointed and it will be possible to plan and control the motion.

Page generated in 0.1428 seconds