• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 14
  • 2
  • 1
  • Tagged with
  • 17
  • 17
  • 12
  • 12
  • 9
  • 6
  • 6
  • 6
  • 5
  • 4
  • 4
  • 4
  • 3
  • 3
  • 3
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Obnova fotbalového stadionu za Lužánkami v Brně / Reconstruction the Football Stadium for Lužánky in Brno

Hegrová, Kateřina January 2016 (has links)
The project of the stadium Za Lužánkami is situated in an area with almost tangible genius loci. At the same time this locality is bound to the biggest successes of the football in Brno and thus it also has a very strong sport tradition. Ponava has a huge potential of becoming a favored sport and recreational area. Development of the sport infrastructure and quality public spaces will once again incorporates Ponava among the desired localities. The design of the football stadium reflects the situation of the current structure. The decision to keep a part of the eastern stand (based on the structural engineer’s consult) became a determining factor for the whole design. It became the starting point from where everything else developed. The building of the stadium becomes a local dominant dressed in colors of Brno but at the same time it remains a part of its immediate environment hidden behind the trees of Mendel university arboretum.
2

Elite Networks and The Redevelopment of The Cecil B. Moore Neighborhood

Schrider, David David January 2023 (has links)
This dissertation project explores how three distinct networks worked for and in opposition to the proposed construction of three Temple University athletic facilities all located within the Northern Philadelphia neighborhood of Cecil B Moore. Specifically, I conduct a network analysis of the three networks of elites who advocated for the construction of Pearson and McGonigle Hall athletic facility in the late 1960s, the Liacouras Center in the mid-nineties, and the contemporary proposed construction of a new football stadium in order to gain a deeper understanding of how these pro- development networks operate, promote urban development, and to explore how these pro-development networks have evolved over time. I do the same for the networks of activists who have attempted to halt these development projects. I employ a mixed method approach which combines ethnographic field observations, in-depth interviews, and a quantitative investigation. I answer the following research questions: 1) How have the demographic characteristics of actors who were members of the Pearson and McGonigle Hall, Liacouras Center, and the Football Pro and Anti-Development Networks changed over time? 2) What strategies were employed by the Pro-Stadium Network to promote Temple development and why were these strategies unsuccessful? 3) What strategies were employed by the Stomper Network to oppose Temple development and why were these strategies successful? I find that while across development eras pro-development networks remain majority White, Democrat, Male, and most network members were working in the educational field, there are noteworthy changes in network demographics. I find there is less consistency in the demographics of anti-development networks over time. Although these networks remain majority Black and Democrat, there is a noteworthy increase in Female network members and White network members over time. In my analysis of how the Pro-Stadium Network promoted Temple development, I examine the strategies employed by the Pro-Stadium Network, focusing specifically on the network's public outreach strategy. I address why the network was not successful at convincing residents and politicians to support the building of a football stadium in Cecil B Moore. I find that the Pro-Stadium Network did not provide basic details about the project, and this was an obvious omission. I also address why the Pro-Stadium Network might have been more successful if it attempted to establish a dialogue with residents prior to announcing the plans for the stadium. However, it is not clear that even with a detailed plan the Pro-Stadium Network would have been successful. It is possible that the political currents had shifted since the last period of Temple development. In my analysis of how the Stomper Network opposed Temple development I examine the strategies employed by the Stomper Network, focusing specifically on the network's public outreach strategy. I find the Stomper Network attempted to establish a dialogue with residents immediately after the network became active. The Stomper Network was also able to check the effectiveness of its messaging with residents and to counter the claims of the Pro-Stadium Network. This contributed to the Stomper Network's ability to exploit the shortcomings of the Pro-Stadium Network's outreach strategy. I hypothesize that the possibility that a growing negative view of urban development in Cecil B Moore made the construction of the football stadium impossible. I focus some of this discussion on how the Pro-Stadium Network has received more scrutiny than the two historical pro-development networks. In doing so, I hypothesize that this growing public scrutiny of Temple development projects in Cecil B Moore and an emerging negative view of urban development may have hampered the Pro-Stadium Network's attempts to build a football stadium in Cecil B Moore. I find theories of urban growth and elite theory fit the development processes for both the Pearson and McGonigle Hall and the Liacouras Center. However, the attempt to construct a football stadium in Cecil B Moore is not consistent with theories of urban growth and elite theory. The struggle over Temple's proposed football stadium is more consistent with pluralist theory and Henri Lefebvre’s right to the city. / Sociology
3

Bioaerosols Generated from Biosolids Applied Farm Fields in Wood County, Ohio

Ghosh, Jaydeep 09 November 2005 (has links)
No description available.
4

Hodnocení investičního projektu národního fotbalového stadionu / Valuation of investment project of National football stadium

Kabešová, Karin January 2011 (has links)
The thesis deals with the assessment of the investment project of the National Football Stadium through feasibility study. It covers market analysis, marketing mix, technical solution, outlines the financial plan and calculations of efficiency indicators.
5

Sportovní centrum Za Lužánkami Brno / Sport Centre Za Lužánkami Brno

Rehortová, Veronika January 2016 (has links)
The theme of my diplom thesis is to create the architectural study of a football stadium in Brno behind Lužánky. The proposed stadium is to create facilities for football , athletes and fans. Stadium capacity is 22 thousands audience. The football stadium is part of a sports complex, which dominates the area. The project responds to the sloping ground and is creating a single complex. Foyer (football stadium) is one open space, where the exterior continuously changes the interior. It was created direct view from the foyer on the playing surface.
6

Ponava - potenciál rozvoje území / Ponava – Potential of Area Development

Kálalová, Kateřina January 2013 (has links)
The subject of the project is a consideration of the fact that the area of Ponava is not used sufficiently. This concerns mainly the complex of the former football stadium. The goal is to find a solution that brings life into the area and is able to evaluate the potentials of the place, while not erasing the traces of the past. The main principles used in this project could be patterns how to bring life to other brownfields in Brno and elsewhere.
7

Sportovní centrum Za Lužánkami Brno / Sport Centre Za Lužánkami Brno

Růžička, Jan January 2016 (has links)
Master thesis elaborates architectural study of football stadium for FC Zbrojovka Brno, which base is urban study of the Sport Centre behind Lužánky. Football stadium creates a main dominant of the area. The proposal satisfies requirements by ČMFS and UEFA's major league stadium 3rd category with some elements of the Elite category. The architectural expression of the football stadium and its volume solution is based on the morphology of sports buildings. Based on the shape of the auditorium. Individual sides of the auditorium are curved and connected by a quarter-circle corner. Arena auditorum arrangement enhances not only the audience but the gaming experience too. The external appearance of the stadium is due to the support structure of the roofing that creates division of the fasade which is filled by ETFE foil with reinforcements of glass fiber fabric. The capacity of the football stadion is designed for a total of 15 000 spectators. Of these, 160 seats are reserved for spectators whit impaired mobility and orientation and accompaniment and 340 VIP seats. The rest is devided into two grandstand, lower one has 8 200 seats, upper one 6 300 seats.
8

Centrum pro sport a volný čas Brno / Sports and Leisure Centre Brno

Winkler, Marek January 2017 (has links)
The topic of my work was to revitalize, recreate and redefine the recreational and sports area Za Lužánkami. Despite its gradual ruining and poor technical conditions it still has something to offer. Indications of this are constant efforts to refresh sport activities and ambitions to bring to this place its lost glory. The main goal of this proposal was to focus on creating a football stadium, support and highlight its dominance and majesty. Stadium was dimensioned on real usefulness with capacity more than 20 000 spectators. The main element of the stadium is its placing in a rising surface and to create a construction which will be a pleasant attraction with its exterior raising pillars and roof construction from all cardinal points. Football stadium fulfills functions of a modern stadium in all required factors and its placing and connection and fulfills sports hall compliance and recreational area for all visitors and householders.
9

Sportovní centrum Za Lužánkami Brno / Sport Centre Za Lužánkami Brno

Arletová, Hana January 2016 (has links)
The subject of this thesis is the architectural study of a sports center in Brno Lužánky focusing on the football stadium for 18,000 spectators. The equipement of the stadium falls into category 3 and it has some equipements of Elite category. The stadium is one of the objects of the recreational sports center za Lužánkami. The solution is based on the idea to link the life in the surrounding park and the life in football stadium. This is achieved through non-closed facade, that is formed by rods and a wire mesh. Ground plan is based on the football field and the requirements for visibility curve. The primary load-bearing structure is reinforced concrete skeleton frame, the stadium is covered by a steel truss. The upper part is lined with grandstandstitanium zinc plates which gently reflects the surrounding area and support the main idea.
10

Sportovní centrum Brno / Sport Centre Brno

Martinek, Jan January 2013 (has links)
The subject of this master thesis is architectural study of sport center in Brno focused on football stadium for 17,500 spectators. Standard of Stadium comes on category 3 of UEFA, with some elements of the standard Elite category. It is a complex study on the possible development of the site as a sports and relaxation area with a primary sport function in the park. The architectural expression and volume solution of stadium is mainly based on the morphology of sports buildings, form follows function. The organic concept is clearly defined roofing mass on elliptic floor plan which mainly response to layout of the auditorium mainly in horizontal and vertical direction. Enabling quality of vision on the pitch is the basic idea of the concept. The construction follows the morphology of the terrain and longitudinal axis is oriented in a north-south direction with the main tribune to the west. The primary load-bearing structure is frame-storey reinforced concrete frame, covered steel truss construction jacketed with titan-zinc hexagonal templates.

Page generated in 0.0504 seconds