• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 1
  • Tagged with
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Factors affecting the cost of engineering for transportation projects

Singh, Prakash, 1983- 22 September 2010 (has links)
State DOTs (department of transportation) spend billions of dollars on construction and maintenance of transportation projects every year. In addition, significant sums go to preliminary and construction engineering (PE and CE). For many projects, DOTs utilize engineering services from consultants, to supplement in-house engineering. The cost and quality of consultant’s engineering services compared to in-house, are important issues to justify the involvement of consultants. This report provides an analysis of those issues on Texas Department of Transportation (TXDOT) projects. Traditionally, the costs of PE and CE are calculated as a fixed percentage of total project construction cost, and the efficiency of engineering organizations is assessed by comparison of their gross percentages. However, the results presented here show that project scope and complexity are significant factors in PE and CE cost. Therefore, simplistic comparisons of PE and CE percentages can be misleading when applied across a mixed program of projects. / text

Page generated in 0.0598 seconds