• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 52
  • Tagged with
  • 53
  • 53
  • 53
  • 49
  • 48
  • 48
  • 47
  • 47
  • 47
  • 28
  • 22
  • 14
  • 12
  • 9
  • 9
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
21

Avaliação técnica e econômica da implantação de sistemas fotovoltaicos no Aeroporto Internacional de Belém

GONÇALVES, Franciane Andreza Veloso dos Santos 27 November 2013 (has links)
Submitted by Edisangela Bastos (edisangela@ufpa.br) on 2015-05-25T19:49:44Z No. of bitstreams: 2 license_rdf: 22974 bytes, checksum: 99c771d9f0b9c46790009b9874d49253 (MD5) Dissertacao_AvaliacaoTecnicaEconomica.pdf: 5525031 bytes, checksum: 10c8c183fb8ff1b3da78bc7d5f937631 (MD5) / Approved for entry into archive by Ana Rosa Silva (arosa@ufpa.br) on 2015-05-26T15:54:28Z (GMT) No. of bitstreams: 2 license_rdf: 22974 bytes, checksum: 99c771d9f0b9c46790009b9874d49253 (MD5) Dissertacao_AvaliacaoTecnicaEconomica.pdf: 5525031 bytes, checksum: 10c8c183fb8ff1b3da78bc7d5f937631 (MD5) / Made available in DSpace on 2015-05-26T15:54:28Z (GMT). No. of bitstreams: 2 license_rdf: 22974 bytes, checksum: 99c771d9f0b9c46790009b9874d49253 (MD5) Dissertacao_AvaliacaoTecnicaEconomica.pdf: 5525031 bytes, checksum: 10c8c183fb8ff1b3da78bc7d5f937631 (MD5) Previous issue date: 2013 / O presente trabalho apresenta uma avaliação técnica e econômica para a instalação de um sistema fotovoltaico conectado à rede (SFCR) para a eletrificação do Aeroporto Internacional Val-de-Cans, localizado na cidade de Belém – Pará - Brasil. Trata-se de da avaliação de implantação de um projeto piloto na Região Norte, onde estuda-se a implantação de um SFCR na cobertura do Terminal Aeroportuário, em uma área de aproximadamente 16.000 m2. A avaliação técnica foi realizada com auxílio dos dados meteorológicos e do consumo de energia elétrica referentes ao período de 2011 a 2012, da elaboração de duas opções de projeto de SFCR, sendo a primeira proposta com 191 subsistemas utilizando módulos de silício policristalinos, totalizando uma potência nominal de 2,3 MWp (nas condições padrões) e a segunda proposta com 82 subsistemas utilizando módulos de silício amorfo, totalizando uma potência nominal de 1,04 MWp (nas condições padrões). Na avaliação técnica utilizou-se também um software para simular o desempenho dos sistemas propostos durante um ano, destacando-se a avaliação de perfis de irradiância para um dia ensolarado e outro nublado. A avaliação econômica baseou-se nos projetos elaborados, sendo decisiva na escolha do sistema fotovoltaico mais indicado para a implantação, pois a proposta 1 possui um investimento inicial de R$ 14.970.089,48, estimando-se a redução da energia consumida da concessionária pelo terminal aeroportuário em no máximo 34%, referente ao mês com maior irradiação solar, e em 24% no mês com menor irradiação solar. A proposta 1 se pagará, sem o auxílio de outras fontes contribuintes, em aproximadamente 21 anos. Já a proposta 2 possui um custo de investimento inicial de R$ 10.067.826,13, reduzindo a energia consumida da concessionária pelo terminal aeroportuário em no máximo 15% no mês de maior irradiação solar, e em 11% no mês de menor irradiação solar, contudo, essa proposta não se pagará sem o auxílio de outras fontes contribuintes. Como resultado, pretende-se demonstrar o percentual de redução do consumo de energia elétrica fornecida pela concessionária, além de divulgar esta alternativa energética promissora e contribuir para a preservação do meio ambiente. / This work presents a technical and economic evaluation for the installation of a grid-connected photovoltaic system for the electrification of the International Airport Val-de-Cans, located in Belém - Pará - Brazil. This is a pilot project in the Northern Region of Brazil to be deployed on the roof of the Airport Terminal, in an area of approximately 16.000 m2. The technical evaluation was performed with the aid of meteorological data and that of electrical energy consumption for the period from 2011 to 2012, the design of two options of grid-connected photovoltaic systems (GCPS), the first proposal with 191 subsystems using polycrystalline silicon modules that will generate maximum power of 2.3 MWp in standard conditions, the second proposal with 82 subsystems using amorphous silicon modules that will generate a power maximum of 1.04 MWp in standard conditions. A software is used to simulate the performance of these proposed systems, showing the irradiance and active power profiles for a sunny day and cloudy day. The economic evaluation was based on the designed systems, being decisive for choosing the most suitable photovoltaic system for deployment given that the proposal 1 has an initial investment of R$ 14.970.089,48, reducing the energy consumed in the airport terminal in a maximum of 34% in the month that has the sunniest days, and 24% in the month that has the cloudiest days. This proposal will be payed for itself, in approximately 21 years, without any other contribution sources. Proposal 2 already has an initial investment cost of R$ 10.067.826,13, reducing the energy consumed in the airport terminal in a maximum of 15% in the month that has the sunniest days, and 11% in the month that has the cloudiest days. This proposal won’t be payed for itself, without any other contributing sources. As a result, it is intended to reduce the consumption of energy provided by the electricity utility, to disclose this promising energy alternative and help preserve the environment.
22

Análise de desempenho de um sistema fotovoltaico domiciliar de pequeno porte operando com diferentes equipamentos

MAIA, Keila Cristina dos Santos 23 February 2015 (has links)
Submitted by Edisangela Bastos (edisangela@ufpa.br) on 2017-01-26T12:53:59Z No. of bitstreams: 2 license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) Dissertacao_AnaliseDesempenhoSistema.pdf: 9817105 bytes, checksum: dfd9f24447a4c8b7afd82b8272634af7 (MD5) / Approved for entry into archive by Edisangela Bastos (edisangela@ufpa.br) on 2017-01-26T13:12:50Z (GMT) No. of bitstreams: 2 license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) Dissertacao_AnaliseDesempenhoSistema.pdf: 9817105 bytes, checksum: dfd9f24447a4c8b7afd82b8272634af7 (MD5) / Made available in DSpace on 2017-01-26T13:12:50Z (GMT). No. of bitstreams: 2 license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) Dissertacao_AnaliseDesempenhoSistema.pdf: 9817105 bytes, checksum: dfd9f24447a4c8b7afd82b8272634af7 (MD5) Previous issue date: 2015-02-23 / CNPq - Conselho Nacional de Desenvolvimento Científico e Tecnológico / O presente trabalho apresenta a análise da operação de um sistema fotovoltaico domiciliar de 180 Wp projetado para atendimento de pequenas demandas. O sistema em questão está instalado na área de testes do laboratório do Grupo de Estudos e Desenvolvimento de Alternativas Energéticas (GEDAE), com o propósito de simular seu funcionamento como provedor de energia elétrica para uma residência ribeirinha típica da Região Amazônica. Para este fim, foi simulada a alimentação de cargas que são utilizadas frequentemente nessas residências (TV e lâmpadas) em horários pré-definidos. No trabalho, além da descrição dos componentes do sistema, são expostos também os mecanismos empregados na monitoração de seu funcionamento, bem como a análise de dados obtidos acerca do comportamento do sistema operando com diferentes tecnologias de inversores de tensão (formas de onda de saída senoidal, quadrada e quadrada modificada), controladores de carga e baterias de descarga profunda (OPzV). / This work presents the operational analysis of the operation of a 180 Wp solar home system designed to supply small loads. The solar home system is installed at the laboratory testing area of the “Grupo de Estudos e Desenvolvimento de Alternativas Energéticas” (GEDAE), in order to simulate its operation as electricity supply for a typical riparian residence of the Amazon. For this, it was simulated the use of loads that are frequently used in these homes (TV and lamps) at predefined times. Besides the description of the system components, the mechanisms for monitor its operation and to analyze the data obtained about the behavior of the system operating with different technologies of inverters (sine, square and modified square output waveforms), charge controllers and deep cycle batteries are also presented.
23

Desafios e oportunidades para o acesso universal à energia elétrica na Amazônia

MUNIZ, Rafael Ninno 20 February 2015 (has links)
Submitted by Edisangela Bastos (edisangela@ufpa.br) on 2017-01-26T12:59:07Z No. of bitstreams: 2 license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) Dissertacao_DesafiosOportunidadesAcesso.pdf: 4701199 bytes, checksum: 0f5f0f67281997fb0dde866ba300ae50 (MD5) / Approved for entry into archive by Edisangela Bastos (edisangela@ufpa.br) on 2017-01-26T13:24:59Z (GMT) No. of bitstreams: 2 license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) Dissertacao_DesafiosOportunidadesAcesso.pdf: 4701199 bytes, checksum: 0f5f0f67281997fb0dde866ba300ae50 (MD5) / Made available in DSpace on 2017-01-26T13:24:59Z (GMT). No. of bitstreams: 2 license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) Dissertacao_DesafiosOportunidadesAcesso.pdf: 4701199 bytes, checksum: 0f5f0f67281997fb0dde866ba300ae50 (MD5) Previous issue date: 2015-02-20 / O planejamento energético brasileiro vem progressivamente dando ênfase à utilização de fontes renováveis de energia, entretanto para algumas iniciativas como o Programa Luz Para Todos, constata-se que essas alternativas energéticas vêm sendo tratadas como uma atividade secundária e de difícil implementação. Este trabalho tem por objetivo analisar como o governo brasileiro vem adaptando a sua estrutura institucional, tecnológica e de financiamento para fornecer acesso universal à eletricidade em áreas remotas. De acordo com informações oficiais, esta iniciativa provou ser eficaz em sua primeira fase, que foi desenvolvida pela extensão de rede convencional. Entretanto o estudo conclui que o programa atualmente não converge para o atendimento pleno do acesso à eletricidade em áreas remotas na Amazônia e três principais desafios foram identificados. Há uma necessidade de adaptação das estruturas institucionais existentes, harmonizar tecnologias para o contexto regional e utilizar os fundos governamentais de forma mais eficaz. A pesquisa aponta caminhos e alternativas para o que está sendo realizado nos sistemas isolados, e apresenta dois estudos de caso onde foram aplicados a geração descentralizada de energia com fontes renováveis de biomassa residual em comunidade isoladas e para o aproveitamento energético de resíduos sólidos urbanos em município pertencente ao sistema isolado. Esses exemplos práticos têm como proposta contribuir com os resultados do estudo para o desenvolvimento de políticas públicas, projetos de pesquisa, atender fornecedores de tecnologia e promover soluções energéticas e residuária para municípios e comunidades do sistema isolado nacional, visando atingir o acesso universal à energia elétrica em áreas remotas na Amazônia. / The Brazilian energy planning has been progressively emphasizing the use of renewable energy sources, however for some initiatives such as the Light for All Program, these energy alternatives are being treated as a secondary activity and difficult to implement. This work aims to analyze how the Brazilian government has been adapting its institutional structure, technology and funding to provide universal access to electricity in remote areas. According to official information, this initiative has proven effective in its first phase, which was developed by the extension of conventional network. However, the study concludes that the program is currently not converges to full compliance with the access to electricity in remote areas in the Amazon and three main challenges were identified. There is a need for adjustment of current institutional structures, harmonize technologies to the regional context and use government funds more effectively. The research points out ways and alternatives to what is being done in isolated systems, and presents two case studies which have been applied to decentralized power generation with renewable sources of biomass in isolated community, and the energy utilization of municipal solid waste in the municipality belonging to the isolated system. These practical examples are proposed to contribute to the results of the study for the development of public policies, research projects, meet technology providers and promote energy and residuary solutions for municipalities and communities belonging to national isolated system, aiming to achieve universal access to energy electricity in remote areas in the Amazon.
24

Uma estratégia ativa para detecção de ilhamento em geradores fotovoltaicos por meio de injeção de sinais de teste

CARVALHO, Fransérgio Martins 27 October 2016 (has links)
Submitted by camilla martins (camillasmmartins@gmail.com) on 2017-04-27T13:33:42Z No. of bitstreams: 2 license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) Dissertacao_EstrategiaAtivaDeteccao.pdf: 2813652 bytes, checksum: 9236c5852241046962c0c168aef08ef5 (MD5) / Approved for entry into archive by Edisangela Bastos (edisangela@ufpa.br) on 2017-05-04T12:41:11Z (GMT) No. of bitstreams: 2 license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) Dissertacao_EstrategiaAtivaDeteccao.pdf: 2813652 bytes, checksum: 9236c5852241046962c0c168aef08ef5 (MD5) / Made available in DSpace on 2017-05-04T12:41:11Z (GMT). No. of bitstreams: 2 license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) Dissertacao_EstrategiaAtivaDeteccao.pdf: 2813652 bytes, checksum: 9236c5852241046962c0c168aef08ef5 (MD5) Previous issue date: 2016-10-27 / CAPES - Coordenação de Aperfeiçoamento de Pessoal de Nível Superior / Neste trabalho realiza-se o estudo de uma técnica ativa para detecção de ilhamento adequada para aplicação em Sistema Fotovoltaico Conectado à Rede (SFCR). A técnica é baseada na injeção de sinais de testes afetando a sequência negativa de tensão após a situação de ilhamento. São apresentadas definições e explicações sobre o sistema de distribuição de potência e sobre os elementos que pertencem a Geração Distribuída (GD). Regulamentos sobre o funcionamento de inversores e o modelo de célula fotovoltaica são apresentados. Detalha-se o conceito de ilhamento e sua Zona de Não Detecção (ZND) bem como as principais técnicas atuais para sua detecção. É apresentada a técnica de sequência negativa. São desenvolvidas algumas aplicações de instrumentação relacionadas a medição de sequência negativa, inversor senoidal e PLL. São projetados modelos que efetuam a injeção e medição de sequência negativa por meio de um VSI: controlador e filtro. São realizadas simulações para detecção de ilhamento sob condições comuns a SFCR: variação de irradiância e sombreamento de célula; e sob condições comuns em um sistema de potência de distribuição: variação e desbalanceamento de carga. Por fim, o desempenho do método aplicado é validado e comparado. / In this paper, is made a study of a active technique for detection of islanding that is proper for application in Grid-Connected Photovoltaic System (GCPS). The technique is based on injection of testing signals which affect negative-sequence of voltage after islanding case. Definitions and explanations are presented about power distributing system and about the elements which belong to Distributed Generation (DG). Standards about inverter’s function and about model of photovoltaic cell are presented. Details of islanding concept and its Non-Detection Zone (NDZ) as well as main current techniques for its detection are exhibited. It is shown the sequence-negative technique. Some instrumental applications related to negative-sequence measurement, sinusoidal inverter and PLL are developed. Models are designed to accomplish the injection and measurement of negative-sequence through VSI: controller and filter. Simulations were made to detect islanding under ordinary conditions of GCPS: irradiance variation and shading of photovoltaic cell; and under ordinary conditions of a power distribution system: charging variation and unbalanced charge. At last, the applied method performance is validated and compared.
25

Desenvolvimento de sistema computacional para avaliação de lodo de esgoto sanitário como biomassa na geração de energia / Development of computational system to assess sewage sludge sanitary as biomass to generate energy

SANTOS, Yvelyne Bianca Iunes 06 1900 (has links)
Submitted by Nathalya Silva (nathyjf033@gmail.com) on 2017-04-24T20:18:44Z No. of bitstreams: 2 license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) Tese_ DesenvolvimentoSistemaComputacional.pdf: 4535874 bytes, checksum: 879c07d74ce2cb1e3aa12b6baf30b896 (MD5) / Rejected by Edisangela Bastos (edisangela@ufpa.br), reason: Dados incompletos: resumo, citação e palavras-chaves ausentes on 2017-04-26T15:30:41Z (GMT) / Submitted by Nathalya Silva (nathyjf033@gmail.com) on 2017-05-15T18:51:35Z No. of bitstreams: 2 license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) Tese_DesenvolvimentoSistemaComputacional.pdf: 4535874 bytes, checksum: 879c07d74ce2cb1e3aa12b6baf30b896 (MD5) / Approved for entry into archive by Edisangela Bastos (edisangela@ufpa.br) on 2017-05-25T20:51:21Z (GMT) No. of bitstreams: 2 license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) Tese_DesenvolvimentoSistemaComputacional.pdf: 4535874 bytes, checksum: 879c07d74ce2cb1e3aa12b6baf30b896 (MD5) / Made available in DSpace on 2017-05-25T20:51:21Z (GMT). No. of bitstreams: 2 license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) Tese_DesenvolvimentoSistemaComputacional.pdf: 4535874 bytes, checksum: 879c07d74ce2cb1e3aa12b6baf30b896 (MD5) Previous issue date: 2012-06 / Desenvolvimento de sistema computacional para avaliação de lodo de esgoto sanitário como biomassa na geração de energia em processos de combustão, considerando normas técnicas e ambientais brasileiras. No sistema foram criadas e implementadas classes para avaliação do potencial energético do lodo e considerados limites estabelecidos nas normas NBR 10004/04, NBR 10004/87 e Resolução nº 316/2002 do CONAMA para impactos ambientais adversos, danos ou riscos à saúde pública, identificando a viabilidade de aplicação desse resíduo como biomassa na geração de energia em processos de combustão. O sistema foi desenvolvido com padrão de arquitetura de software Model-View-Controller (MVC), com método representado por regras de lógica, tendo como dados de entrada os resultados de determinações laboratoriais de amostras de lodo de esgoto, processamento em testes e encadeamentos lógicos das regras e relatórios para possibilitar a tomada de decisão do usuário. Para a validação do sistema foram utilizados resultados de trabalhos técnicos de aplicação de lodo de esgoto como biomassa na geração de energia em escala experimental, sendo constatado como adequados os parâmetros adotados no sistema para avaliar o potencial energético do lodo amostrado, a toxicidade e a poluição atmosférica; que as mensagens de alerta e explicativas foram claramente emitidas; que o encadeamento lógico das regras foi executado progressivamente; e que os valores obtidos no sistema foram compatíveis com os dos trabalhos utilizados para validação. Finalizando, foi concluído que o sistema desenvolvido pode ser aplicado para agilizar a tomada de decisão, especialmente em estações de tratamento de esgoto com grande volume de lodo. / Development of a computational system to assess sewage sludge sanitary as biomass to generate energy in combustion processes, taking into account Brazilian technical and environmental norms. Classes were created and implemented in the system to assess sewage sludge as energy potential and considered limits established in the norms NBR 10004/04, NBR 10004/87 and CONAMA Resolution nº 316/2002 for adverse environmental impacts, damages or risks to public health , identifying the feasibility of use of this residual as biomass to generate energy in combustion processes. The system was developed using a Model-View-Controller (MVC) software considered an architectural pattern, with method represented by logical rules, whose input data were the results from laboratory determination of sewage sludge samples, test processing and logical sequence of rules, and reports to enable the user to make a decision. To validate the system it was used results from technical work on the use of sewage sludge as biomass to generate energy in experimental scale, observing that the limits adopted in the system were appropriate as parameters to evaluate the energy potential of the sampled sludge, its toxicity and air pollution; that the explanatory and alert messages have been clearly sent; that the logical sequence of rules had been progressively implemented; and that the values obtained in the system had been compatible with the validation works. Finally, it was concluded that the system developed may be used to expedite decision-making, mainly, in waste treatment plant with large quantities of sludge.
26

Aplicação de recursos de gestão produtiva total (TPM) para gestão de ativos em empresas de distribuição de energia elétrica

Gissoni, Roger Toledo 08 January 2016 (has links)
Made available in DSpace on 2016-08-18T17:23:42Z (GMT). No. of bitstreams: 1 Dissertacao-RogerToledoGissoni.pdf: 7001691 bytes, checksum: b6ac87eb5d4b621be8fa495b1ec5b60a (MD5) Previous issue date: 2016-01-08 / Given the current economic scenario experienced by companies in the Brazilian energy sector and for having intensive reliance on characteristics of its assets, proper asset management is critical to meet the needs of all stakeholders in the business. In this context, the productivity gain is a sine qua non for the survival of any company included in a scenario where the quality of energy supply, with appropriate costs, is the main goal. This work will address the use of Total Productive Management (TPM) methodology in an electricity distribution company for managing its assets, mainly in the maintenance and operation phases of its operating cycle. Thus, the current situation will be explored in the Brazilian electric sector and its main challenges, the current concept of the TPM methodology and the development of international norms in asset management since the creation of the British specification publicly available PAS 55, until the release of the new standard ISO 5500. We will evaluate the results of the implementation of the pillars autonomous maintenance, planned maintenance and specific improvement of Total Productive Management (TPM) in an electricity distribution company. They will also be addressed the requirements of the new standard ISO 55000 asset management that these pillars meet TPM and its contribution to an excellent management of the assets of a distributor of electricity. Finally, the results achieved by the company after two years of use of the TPM are shown. / Devido ao atual cenário econômico vivido pelas empresas do setor energético brasileiro e por possuírem características de dependência intensiva dos ativos, uma adequada gestão de ativos é fundamental para atender as necessidades de todas as partes interessadas no negócio. Neste contexto, o ganho de produtividade é condição sine qua non para a sobrevivência de qualquer empresa inserida num cenário onde a qualidade no fornecimento de energia, com custos adequados, é o objetivo principal. Assim, neste trabalho será abordado a utilização da metodologia de Gestão Produtiva Total (TPM), do inglês Total Productive Management, em uma empresa de distribuição de energia elétrica para gestão de seus ativos, principalmente nas fases de manutenção e operação do seu ciclo operacional. Para tanto, será explorado o atual cenário do setor elétrico brasileiro e seus principais desafios, o atual conceito da metodologia do TPM e a evolução da normatização internacional em gestão de ativos desde a criação da especificação britânica disponível publicamente PAS 55, até o lançamento da nova norma ABNT NBR ISO 5500. Serão avaliados os resultados da implantação dos pilares manutenção autônoma, manutenção planejada e melhoria específica da Gestão Produtiva Total (TPM) em uma empresa de distribuição de energia elétrica. Serão também abordados os requisitos da nova norma ABNT NBR ISO 55000 de gestão de ativos que esses pilares do TPM atendem e sua contribuição para uma gestão excelente dos ativos de uma distribuidora de energia elétrica. Por fim, serão mostrados os resultados alcançados pela companhia após dois anos de utilização da metodologia do TPM.
27

Avaliação operacional das diferentes arquiteturas de interligação de geradores fotovoltaicos à rede elétrica

TELES, Mailson Borges 13 June 2017 (has links)
Submitted by Hellen Luz (hellencrisluz@gmail.com) on 2017-10-16T18:20:59Z No. of bitstreams: 2 license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) Dissertacao_AvaliacaoOperacionalDiferentes.pdf: 22302291 bytes, checksum: 8120408e0a53d61465fff8f63977437e (MD5) / Approved for entry into archive by Edisangela Bastos (edisangela@ufpa.br) on 2017-11-14T16:46:30Z (GMT) No. of bitstreams: 2 license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) Dissertacao_AvaliacaoOperacionalDiferentes.pdf: 22302291 bytes, checksum: 8120408e0a53d61465fff8f63977437e (MD5) / Made available in DSpace on 2017-11-14T16:46:30Z (GMT). No. of bitstreams: 2 license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) Dissertacao_AvaliacaoOperacionalDiferentes.pdf: 22302291 bytes, checksum: 8120408e0a53d61465fff8f63977437e (MD5) Previous issue date: 2017-06-13 / CAPES - Coordenação de Aperfeiçoamento de Pessoal de Nível Superior / Este trabalho avalia experimentalmente as tecnologias string, microinversor e conversor c.c.-c.c., de modo a contribuir para a construção do conhecimento científico da aplicação das diferentes arquiteturas de interligação de geradores fotovoltaicos à rede elétrica convencional. Para isso são utilizados diferentes sistemas instalados no laboratório do GEDAE/UFPA, Região Norte do país. Comparou-se os desempenhos de acordo com as informações nos diferentes mecanismos de aquisição de dados disponíveis no laboratório. Tendo em vista que alguns desses mecanismos de aquisição de dados fornecem somente o valor da energia acumulada ao longo do dia, foi dado um enfoque na operação global dos diferentes sistemas analisados. Contudo, naqueles sistemas onde maiores detalhes da operação foram monitorados, seja por sistemas de aquisição do próprio equipamento ou por equipamentos existentes no laboratório (osciloscópio digital Fluke, wattímetro, etc), análises pontuais importantes, mais detalhadas da operação do sistema, foram desenvolvidas. Os resultados obtidos mostram que o conversor c.c.-c.c. apresentou desempenhos superiores aos demais sistemas monitorados. Contudo constatou-se a ocorrência de problemas devido ao processo de pareamento dos conversores c.c.-c.c. na operação do sistema que permanecem até os dias de hoje. / This work aims to experimentally evaluate the string, microinverter and d.c.-d.c. converter technologies, in order to contribute to scientific knowledge construction in applications of the different interconnection architectures of photovoltaic generators to the conventional electric grid. For this, were used different systems installed at GEDAE’s laboratory (UFPA), located in northern region of the country. It was compared the performances according to the information from different data acquisition mechanisms available in the laboratory. In face of some of these data acquisition mechanisms provide only the value of energy accumulated throughout the day, a focus was given on the overall operation of the different systems analyzed. However, in those systems which greater operational details were monitored, either by the equipment's own acquisition system or already existing equipment in the laboratory (Fluke Digital Storage Oscilloscope, Digital Power Meter, etc.), important point analyzes with more detailed operation of the system were performed. The obtained results show that the d.c.-d.c. converters system presented superior performance to the other monitored systems. However, it has been found the occurrence of problems due to the pairing process of the d.c.-d.c. power converters in the operation of such systems that remain until now.
28

Contribuição para o planejamento econômico de sistemas de energias elétrica: um algoritmo para a expansão simultânea da geração e transmissão usando aproximação linear

BRANCO, Tadeu da Mata Medeiros January 1983 (has links)
Submitted by Edisangela Bastos (edisangela@ufpa.br) on 2018-03-21T17:56:02Z No. of bitstreams: 2 license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) Tese_ContribuicaoPlanejamentoEconomico.pdf: 2908406 bytes, checksum: 419e1109e534942511613fa0bbb10384 (MD5) / Approved for entry into archive by Edisangela Bastos (edisangela@ufpa.br) on 2018-03-22T18:25:22Z (GMT) No. of bitstreams: 2 license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) Tese_ContribuicaoPlanejamentoEconomico.pdf: 2908406 bytes, checksum: 419e1109e534942511613fa0bbb10384 (MD5) / Made available in DSpace on 2018-03-22T18:25:22Z (GMT). No. of bitstreams: 2 license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) Tese_ContribuicaoPlanejamentoEconomico.pdf: 2908406 bytes, checksum: 419e1109e534942511613fa0bbb10384 (MD5) Previous issue date: 1983 / CAPES - Coordenação de Aperfeiçoamento de Pessoal de Nível Superior / CNPq - Conselho Nacional de Desenvolvimento Científico e Tecnológico / O Planejamento Econômico da Geração ou Transmissão em Sistemas de Energia Elétrica constitue um Problema de Otimização Não Linear apresentando certa complexidade e deve ser tratado de uma maneira global. Diversos métodos iterativos têm sido propostos para resolver problemas desta natureza embora muitas vezes sejam inaceitáveis devido aos requisitos de tempo e armazenamento computacional em larga escala. Essa complexidade é aumentada se geração e transmissão forem otimizadas simultaneamente. programação linear tem sido considerada como um instrumento promissor para solução desses problemas embora com perda de exatidão nos resultados devido a linearização de funções não lineares, mesmo assim para fins de planejamento estes resultados são aceitáveis. Neste trabalho é proposto um Algoritmo Global para o Planejamento Econômico da Expansão Simultânea da Geração e Transmissão de Sistemas de Energia Elétrica baseado na aplicação de um Método de Programação Linear e do AlgorItmo de Fluxo de Custo Mínimo que permite a adição discreta de unidades geradoras e de circuitos ao sistema com mínimo custo de investimento em cada período. Perdas e máxima capacidade das linhas são incluídas no Algoritmo, alguns exemplos são apresentados e no final são sugeridas algumas extensões para o trabalho. / Contribution tho the eletric power systems economic planning: an algorithm for the simultaneos expansion of generation and transmission using linear approximation. Economic Planning of Generation and Transmission in Electrical Power Systems constitutes a Nonlinear Optimization Problem which has some complexity and must be treated in a global manner. Several iteractive methods has been proposed to solve problems of this nature but sometimes are unaceptable due time and large computer storage requirements. This complexity is enlarged if generation and transmission were simultaneously optimized. Linear programming has been considered as a promissing tool to solve these problems but due the linearization of nonlinear functions the results presents some loss of accuracy, even so, for planning purposes these results are aceptable. In this work we propose a Global Algorithm for the Economic Planning of Simultaneous Expansion of Generation and Transmission in Electrical Power Systems based on the application of a Linear Programming Method and Minimum Cost Flow Algorithm which permits discret addition of generation and circuits units to the system with minimum investment cost in each period. Losses and maximum capacity of the lines are included in the algorithm, some examples are shown and at the end we suggest some extensions to further works.
29

Avaliação do desempenho das funções de controle volt-watt e volt-var em inversores fotovoltaicos integrados nas redes de distribuição / Evaluation of the performance of the volt-watt and volt-var control functions in photovoltaic inverters integrated in the distribution networks

WANZELER, Tiago Machado 27 March 2018 (has links)
Submitted by Luciclea Silva (luci@ufpa.br) on 2018-07-19T17:42:08Z No. of bitstreams: 2 license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) Dissertacao_ avaliacaodesempenhofuncoes.pdf: 5239412 bytes, checksum: a7be25c49d350063c87bb85986bb7199 (MD5) / Approved for entry into archive by Luciclea Silva (luci@ufpa.br) on 2018-07-19T17:42:46Z (GMT) No. of bitstreams: 2 license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) Dissertacao_ avaliacaodesempenhofuncoes.pdf: 5239412 bytes, checksum: a7be25c49d350063c87bb85986bb7199 (MD5) / Made available in DSpace on 2018-07-19T17:42:46Z (GMT). No. of bitstreams: 2 license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) Dissertacao_ avaliacaodesempenhofuncoes.pdf: 5239412 bytes, checksum: a7be25c49d350063c87bb85986bb7199 (MD5) Previous issue date: 2018-03-27 / Esta dissertação aborda alguns dos principais problemas operacionais enfrentados pelos operadores de redes de distribuição devido à elevada integração de geradores fotovoltaicos (FV), tais como sobretensões e comutações excessivas de tape nos autotransformadores reguladores de tensão. Essas situações estão sendo continuamente estudadas, tendo em vista que podem causar problemas de qualidade de tensão e reparos em reguladores de tensão. O problema da sobretensão pode ser causado por uma injeção significativa de potência ativa da geração FV à rede. Paralelamente, as variações rápidas e significativas na potência ativa injetada pelo gerador FV, associadas com os transitórios de nuvens, podem resultar no aumento excessivo de comutações de tape no regulador de tensão, que podem acabar diminuindo a vida útil e aumentar a quantidade de manutenções realizadas nestes equipamentos. Neste contexto, surgiram as funções de controle Volt-Watt e Volt-Var prensentes nos inversores FV inteligentes, que foram adicionadas em estudos recentes para mitigar as sobretensões. Este trabalho mostra como as funções de controle Volt-Watt e Volt-Var mitigam os problemas de sobretensão e regulação de tensão em redes de distribuição com presença de geradores FV. Simulações de fluxo de potência de séries temporais em alimentadores simples de BT e MT com presença da geração FV foram realizadas em cenários de alta e baixa variabilidade solar. / This dissertation addresses some of the major operational problems faced by distribution system operators due to the high integration of photovoltaic (PV) generators, such as overvoltages and excessive tap counts in step voltage regulators (SVR). These situations are continually being studied, since they can cause voltage quality problems and damage in SVRs. The overvoltage problem can be caused by a significant injection of active power from the PV generation to the network. Moreover, the rapid and significant variations in PV generator active power associated with cloud transients result in an increase of voltage regulator tap counts, which can affect the useful life of device. In this context, the smart inverters Volt-Watt and Volt-Var control functions have been added in recent studies to mitigate the overvoltages. This work shows how Volt-Watt and Volt-Var control functions mitigate the overvoltage and voltage regulation problems in distribution networks with PV generation. Time series power flow simulations on LV and MV single feeders with PV solar plant have been performed in high and low solar variability scenarios.
30

Comparação dos algoritmos C4.5 e MLP usados na avaliação da segurança dinâmica e no auxílio ao controle preventivo no contexto da estabilidade transitória de sistemas de potência

OLIVEIRA, Werbeston Douglas de 06 March 2013 (has links)
Submitted by Edisangela Bastos (edisangela@ufpa.br) on 2013-04-24T22:22:44Z No. of bitstreams: 2 license_rdf: 23898 bytes, checksum: e363e809996cf46ada20da1accfcd9c7 (MD5) Dissertacao_ComparacaoAlgoritmosC45.pdf: 6478832 bytes, checksum: 5b133794170fc1dbb66f65dbedb6dd9c (MD5) / Approved for entry into archive by Ana Rosa Silva(arosa@ufpa.br) on 2013-04-29T15:43:06Z (GMT) No. of bitstreams: 2 license_rdf: 23898 bytes, checksum: e363e809996cf46ada20da1accfcd9c7 (MD5) Dissertacao_ComparacaoAlgoritmosC45.pdf: 6478832 bytes, checksum: 5b133794170fc1dbb66f65dbedb6dd9c (MD5) / Made available in DSpace on 2013-04-29T15:43:06Z (GMT). No. of bitstreams: 2 license_rdf: 23898 bytes, checksum: e363e809996cf46ada20da1accfcd9c7 (MD5) Dissertacao_ComparacaoAlgoritmosC45.pdf: 6478832 bytes, checksum: 5b133794170fc1dbb66f65dbedb6dd9c (MD5) Previous issue date: 2013 / CAPES - Coordenação de Aperfeiçoamento de Pessoal de Nível Superior / Esse trabalho compara os algoritmos C4.5 e MLP (do inglês “Multilayer Perceptron”) aplicados a avaliação de segurança dinâmica ou (DSA, do inglês “Dynamic Security Assessment”) e em projetos de controle preventivo, com foco na estabilidade transitória de sistemas elétricos de potência (SEPs). O C4.5 é um dos algoritmos da árvore de decisão ou (DT, do inglês “Decision Tree”) e a MLP é um dos membros da família das redes neurais artificiais (RNA). Ambos os algoritmos fornecem soluções para o problema da DSA em tempo real, identificando rapidamente quando um SEP está sujeito a uma perturbação crítica (curto-circuito, por exemplo) que pode levar para a instabilidade transitória. Além disso, o conhecimento obtido de ambas as técnicas, na forma de regras, pode ser utilizado em projetos de controle preventivo para restaurar a segurança do SEP contra perturbações críticas. Baseado na formação de base de dados com exaustivas simulações no domínio do tempo, algumas perturbações críticas específicas são tomadas como exemplo para comparar os algoritmos C4.5 e MLP empregadas a DSA e ao auxílio de ações preventivas. O estudo comparativo é testado no sistema elétrico “New England”. Nos estudos de caso, a base de dados é gerada por meio do programa PSTv3 (“Power System Toolbox”). As DTs e as RNAs são treinada e testadas usando o programa Rapidminer. Os resultados obtidos demonstram que os algoritmos C4.5 e MLP são promissores nas aplicações de DSA e em projetos de controle preventivo. / This work compares the C4.5 and multilayer perceptron (MLP) algorithms applied for dynamic security assessment (DSA) and power system stability transient preventive control design. C4.5 is an algorithm of the decision tree (DT) technique and the MLP is a member of artificial neural network (ANNs) family. The advent of DTs and ANNs provides solution to real-time DSA issues in order to identify quickly when a power system is subjected to a critical disturbance (short-circuit) that may lead to transient instability. In addition, the knowledge obtained by both techniques can be utilized in the preventive control design to restore the power system security against critical disturbances. Based on the data base generation with exhaustive time-domain simulations, some specific critical disturbances are taken as examples to compare the C4.5 and MLP algorithms employed to DSA and guideline to preventive actions. The comparative study is tested on the New England power system. In the case studies, the knowledge database is generated by using PSTv3 (Power System Toolbox) software. The DTs and ANNs are trained and tested by the Rapidminer software. The obtained results have demonstrated a promising application of the C4.5 and MLP algorithms used in power system DSA and preventive control design.

Page generated in 0.0232 seconds