• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2
  • Tagged with
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Gerenciamento de projetos em uma empresa de bens de capital : uma comparação entre os procedimentos utilizados e o método da corrente crítica

Campanini, Luciano 29 August 2008 (has links)
Made available in DSpace on 2016-06-02T19:51:40Z (GMT). No. of bitstreams: 1 2045.pdf: 3215623 bytes, checksum: 69c0ddb010cfaf01e4067504e5a8a8e0 (MD5) Previous issue date: 2008-08-29 / The approach of this study relates to the method of project management originated of the Theory of Constraints called Critical Chain. Beyond of the bibliographical revision on research methodology, production systems, project management, simulation of systems, Theory of Constraints and Critical Chain, a case study was accomplished to compare two methods of project management in a company of Industrial Goods. This company works with projects under order and it uses the Critical Path Method (CPM) to make your projects management. To compare the two methods of project management, historical information on the current management method adopted by the company had been collected, and for the method of Critical Chain some simulations had been done. Through these simulations it was possible to compare the compliments of the finish dates and the lead-time of projects to each one of the management methods. The results indicate for a better execution of finish dates when the method of the Critical Chain is used in the project management. / A abordagem deste estudo se refere ao método de gerenciamento de projetos originado da Teoria das Restrições chamado de Corrente Crítica. Além das revisões bibliográficas sobre metodologia de pesquisa, sistemas de produção, gerenciamento de projetos, simulação de sistemas, Teoria das Restrições e Corrente Crítica, foi realizado um estudo de caso para comparar dois métodos de gerenciamento de projetos em uma empresa de Bens de Capital. Esta empresa trabalha com projetos sob encomenda e utiliza o Método do Caminho Crítico (Critical Path Method CPM) para realizar o gerenciamento dos seus projetos. Para comparar os dois métodos de gerenciamento de projetos, foram coletadas informações históricas sobre o método de gerenciamento atual adotado pela empresa, e para o método da Corrente Crítica foram realizadas algumas simulações. Por meio destas simulações foi possível comparar os cumprimentos dos prazos de entrega e as durações dos projetos para cada um dos métodos de gerenciamento. Os resultados indicam para um maior cumprimento de prazos quando o método da Corrente Crítica é utilizado no gerenciamento do projeto.
2

Gestão de múltiplos projetos em uma empresa de bens de capital: uso do método da corrente crítica aplicando lógica fuzzy para cálculo de pulmão de tempo

Campanini, Luciano 18 June 2013 (has links)
Made available in DSpace on 2016-06-02T19:50:21Z (GMT). No. of bitstreams: 1 5362.pdf: 3103757 bytes, checksum: c0986f222ab0a46277298663c0ba7619 (MD5) Previous issue date: 2013-06-18 / This study approach the Critical Chain Method. This method is the Theory of Constraints applied to project management. The main contribution of this thesis is to propose a method for determining buffer size. Some literature reviews were performed on research methodology, production systems, project management, Critical Chain and Fuzzy Logic. A case study in a multiple project environment in a company that works with engineering to orders in the segment of capital goods was done. At the literature for determining buffer size, were identified in addition to the original method "Cut and Paste Method" proposed by Goldratt, four other methods: "Root Square Error Method (RSEM)", "Adaptive Procedure with Density (APD)," Adaptive Procedure with Resource Tightness (APRT) "and" Improved Root Square Error Method (IRSEM)". In the literature considered in this work, there was no application of any of the Critical Chain method in cases of multiple projects, with these four methods for determining buffer size. For the proposal of a new method for determining buffer size, elaborated in this thesis, we considered five variables that influence the outcome of the contracts and thus integrate the formulation. They are: contractual penalty, profit margin, customer importance, project complexity and resource constraints. Fuzzy logic is used to establish an adjustment factor to determining the buffer size. All these methods were simulated in the environment of multiple projects studied and some indicators were compared. In general, the proposed of buffer size using Fuzzy Logic allows the use of a greater number of project specific characteristics to determining the buffer size and the results of applications were goods when compared with other buffer size methods considered in this literature. / Este estudo tem como foco o método de gerenciamento de projetos originado da Teoria das Restrições chamado de Corrente Crítica. A principal contribuição desta tese está na proposta de um método para cálculo de pulmão de tempo. Para isso, foram realizadas algumas revisões bibliográficas sobre metodologia de pesquisa, sistemas de produção, gerenciamento de projetos, Corrente Crítica e Lógica Fuzzy. Foi realizado também um estudo de caso em um ambiente de múltiplos projetos em uma empresa que trabalha com pedidos sob encomenda no segmento de Bens de Capital. Na literatura para cálculo de pulmão de tempo, foram identificados, além do método original Cortar e Colar proposto por Goldratt, outros quatro métodos: Método da Raiz Quadrada do Erro , Procedimento Adaptativo com Densidade , Procedimento Adaptativo com Escassez de Recurso e Método Melhorado da Raiz Quadrada do Erro . Na bibliografia considerada neste trabalho, não se observou nenhuma aplicação desses quatro métodos para cálculo de pulmão de tempo em ambientes de múltiplos projetos. Para a proposta de um novo método para cálculo de pulmão de tempo, foram consideradas cinco variáveis que influenciam no resultado dos contratos e, dessa forma, participaram dos cálculos: multa contratual, margem de lucro, importância do cliente, complexidade do projeto e escassez de recurso. A Lógica Fuzzy foi utilizada para estabelecer um fator de ajuste do pulmão de tempo. Todos esses métodos foram simulados no ambiente de múltiplos projetos estudado e alguns indicadores foram comparados. Em geral, a aplicação da proposta para cálculo de pulmão de tempo utilizando a Lógica Fuzzy, além de permitir a utilização de um número maior de características específicas do projeto no dimensionamento dos pulmões de tempo, apresentou bons resultados em comparação com os demais métodos considerados neste trabalho.

Page generated in 0.1871 seconds