Spelling suggestions: "subject:"covernment contractors"" "subject:"bgovernment contractors""
1 |
Motivation among NASA government contractorsGarcia, Yadira 2009 August 1900 (has links)
There are many government standards and regulations that even contractors must follow. This makes it difficult for contracting companies to have the same incentives that other private companies provide for their employees that keeps them motivated. A survey was conducted among NASA government contractors, mainly Engineering and Science Contract Group (ESCG) contractors to get their perspective on the work motivation they have working in the space industry. This report will discuss some of the motivation theories proposed in industrial psychology as well as the benefits offered by ESCG and will be compared with the results from the survey. Lastly there will be recommendations on how to improve the benefits offered or lack thereof by ESCG that could improve the motivation in the workplace. / text
|
2 |
Government Procurement and Financial Reporting QualityUnknown Date (has links)
Government spending is essential for the US economy, and the amount of capital that flows from the government to US firms has increased substantially in recent years. Despite the economic importance of the corporate-government contracting relationship, we know little about the firm-level financial outcomes associated with government contracts. In this study, I investigate whether the corporate government contracting relationship affects firm-level financial reporting quality. Using a sample of 58,988 US publicly-traded firms from 2001 through 2017, I find that federal government contracting firms are associated with a lower level of discretionary accruals, lower probability of internal control material weaknesses, and lower probability of restatement and fraud as compared to non government contractors. However, this association is weaker when industry competition on government contracts are lower, and government switching costs in which the cost to find new suppliers are higher. Collectively, my empirical results suggest that having the government as a customer has a positive impact on the quality of financial reports. / Includes bibliography. / Dissertation (Ph.D.)--Florida Atlantic University, 2020. / FAU Electronic Theses and Dissertations Collection
|
3 |
Notice provisions for United States citizen contractor employees serving with the United States Armed Forces in the field time to reflect their assimilated status in government contracts? /Brady, Brian H. January 1900 (has links)
Thesis (LL. M.)--Judge Advocate General's School, United States Army, 1995. / "April 1995." Typescript. Includes bibliographical references. Also issued in microfiche.
|
4 |
Analysis of General Accounting Office bid protest decisions on A-76 studiesRussial, Paul. January 1900 (has links) (PDF)
Thesis (M.S.)--Naval Postgraduate School, 2003. / Title from title screen (viewed Oct. 10, 2003). "June 2003." Includes bibliographical references (p. 101-106). Also issued in paper format.
|
5 |
Contractor logistics support of the medium tactical vehicle replacement (MTVR) during Operation Iraqi Freedom /O'Leary, Brian R. Romero, Herman S. January 2003 (has links) (PDF)
Thesis (M.B.A.)--Naval Postgraduate School, December 2003. / "MBA professional report"--Cover. Thesis advisor(s):Donald R. Eaton, Michael W. Boudreau, Brad R. Naegle. Includes bibliographical references (p. 41-42). Also available online.
|
6 |
Contractor logistics support of the medium tactical vehicle replacement (MTVR) during Operation Iraqi FreedomO'Leary, Brian R. Romero, Herman S. January 1900 (has links) (PDF)
500 "Submitted in partial fulfillment of the requirements for the degree of Master of Business Administration from the Naval Postgraduate School, December 2003"--P. v. / Title from title screen (viewed Sept. 9, 2005). "MBA professional report"--Cover. Includes bibliographical references (p. 41-42). Also issued in paper format..
|
7 |
Battlefield contractors time to face the tough issues /Vernon, Rebecca Rafferty. January 2003 (has links)
Thesis (LL.M.)--George Washington University, 2003. / Title from title screen (viewed Sept. 9, 2005). "August 31, 2003." "ADA417077"--URL. Includes bibliographical references. System requirements: Adobe Acrobat Reader. Also issued in paper format.
|
8 |
Government owned-contractor operated munitions facilities are they appropriate in the age of strict environmental compliance and liability? /Connor, Mark J. January 1900 (has links)
Thesis (LL. M.)--Judge Advocate General's School, United States Army, 1990. / "April 1990." Typescript. Includes bibliographical references (leaves 68-116). Also issued in microfiche.
|
9 |
Civilians at war reexamining the status of civilians accompanying the armed forces /Heaton, John Ricou. January 2004 (has links)
Thesis (LL. M.)--George Washington University, 2004. / Title from title screen (viewed Sept. 9, 2005). "May 23, 2004." "ADA425026"--URL. Includes bibliographical references. Also issued in paper format.
|
10 |
America's mercenaries war by proxy /Collins, Kevin G. January 2006 (has links)
Thesis (M.M.A.S.)--U.S. Command and General Staff College. / Title from title screen (viewed Apr. 9, 2008).
|
Page generated in 0.1065 seconds